Tender For Restoration Of Rain Damages To Lwss Kakroa & Its Adjoining Villages In Gp Sai In Tehsil Kotli Distt. Mandi (Hp)(Sh:- Providing, Supplying And Fixing Of Electrical Equipment/Accessories And Mechanical Parts In Pump House & Rising Main 1St S
Tender Overview
Project Description
Tender for Restoration Of Rain Damages To Lwss Kakroa & Its Adjoining Villages In Gp Sai In Tehsil Kotli Distt. Mandi (Hp)(Sh:- Providing, Supplying And Fixing Of Electrical Equipment/Accessories And Mechanical Parts In Pump House & Rising Main 1St Stage, Repair And Rewinding Of Pump 25.00 Hp With Its Allied Accessories).
BOQ
| Sl. No. | Item Description |
| 1 | Electrical Equipments :- Providing and Fixing Main Switch 100 amp. TP & N double / triple pole with neutral, side handle operated rewireable in Main Switch sheet metal enclosure type : BSP / BSG (conforming to IS : 13947 (part-3) 1993-IEC 947 (part-3) panel mounting cubicle type Three pole & neutral AC 23 A, 50 Hz, 415 V complete in all respect in all leads and lifts. |
| 2 | Providing and Fixing Oil immersed Star Delta Motor Starter Heavy Duty with double Contact Strip Wound Overload Coil & Cable Entry Box type SSD-S-Dx manually operated 31-40 HP MEI / CAPITAL / BENTEX make complete in all respect and to the entire satisfaction of the Engineer-in-Charge in all leads and lifts. |
| 3 | Providing and Fixing Kit Kat 200 ampere T - Type (Heavy Duty) with Extension Patti of reputed make complete in all respect in all leads and lifts. |
| 4 | Rewinding of Motor 25.00 HP :- 2 Nos.- Rewinding of Motor 25.00 HP with copper insulated wire complete by providing packing paper sleeves, cotton tape roll including insulated with air dried varnish including dismantalling and carraige of motor from site of work to workshop and than back to site of work and Re-fixing and testing of motor complete in all respect as per the direction and to the entire satisfaction of the Engineer - in - Charge in all leads and lifts. |
| 5 | Repair of Pump 25.00 HP :- 2 Nos.-Removal of Pump from Foundation and manual Shifting to workshop for repair including loading and unloading and manual carriage at both sides and shifting back to site alignment with Motor and trial run as per the direction and to the entire satisfaction of the Engineer - in - Charge in all leads and lifts. |
| 6 | Dismentling of complete Pump after heating Gas. |
| 7 | Providing and Fixing of Impeller complete in all respect. |
| 8 | Repair of Impeller complete in all respect. |
| 9 | Providing and Fixing Shaft complete in all respect. |
| 10 | Providing and Fixing Stage Bowl complete in all respect. |
| 11 | Providing and Fixing Gland Sleeve complete in all respect. |
| 12 | Providing and Fixing of \\"O\\" Rings of all the stages complete in all respect. |
| 13 | Providing and Fixing of Neck Rings complete in all respect. |
| 14 | Providing and Fixing of Lubricant complete in all respect. |
| 15 | Repair of Bearing Bracket complete in all respect. |
| 16 | Providing and Fixing Balancing Disc Assembly complete in all respect. |
| 17 | Providing and Fixing of Guide Bush complete in all respect. |
| 18 | Providing and Fixing of Defuser complete in all respect. |
| 19 | Shifting of Pump from workshop including manual carriage from road head to Pump House complete in all respect. |
| 20 | Pump Jointing to Motor, testing and trial run complete in all respect. |
| 21 | Providing and Fixing of Coupling Set RB 162/2 (Pin Bush type) complete in all respect. Please Enable Macros to View BoQ information Terms and conditions |
| 22 | The work should be executed as per PWD/JSV specifications and to the entire satisfactions of the Engineer-in Charge. |
| 23 | The Contractor will be fully responsible for watch and ward of material at site of work. |
| 24 | Nothing shall be paid for rejected/sub-standard material at site of works. |
| 25 | The work should be completed in the stipulated period. |
| 26 | The rates should be inclusive with GST and carriage |
| 27 | 2 % rebate on account of dismentalled materials. |
| 28 | 1% labour cess will be deducted from the bill of the contractor. |
| 29 | GST as applicable will be borne by the contractor. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender