Tender for Tender for Construction Of Missing Link Road Purani Basti Chibramau To Naurangpur Aliyapur Via Koi Primary School Raod (With Five Year Maintinence)
Tender Overview
Project Description
Tender for Construction Of Missing Link Road Purani Basti Chibramau To Naurangpur Aliyapur Via Koi Primary School Raod (With Five Year Maintinence)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Sep-2026 | Other | Other | 15-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. Excavation for roadwork in soil with hydraulic excavator of cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. Including all taxes and labour cess but excluding GST |
| 2 | Construction of Subgrade and Earthen Shoulders/Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(local earth/Without Quartage) Including all taxes and labour cess but excluding GST |
| 3 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) For Grading I Material. Including all taxes and labour cess but excluding GST |
| 4 | Cement Treated Subbase Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase Including all taxes and labour cess but excluding GST |
| 5 | Water Bound Macadam Sub-base/base 3) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (A) By Manual Means Including all taxes and labour cess but excluding GST |
| 6 | Cement Treated Base Providing, laying, spreading on a prepared sub base, cement@4% by weight to the spread material manully mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. / Quantity of cement assumed as 4 percent of Quantity by weight for base course. Including all taxes and labour cess but excluding GST |
| 7 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Including Biumen, all taxes and labour cess but excluding GST |
| 8 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates ( two third 13.2 mm and one third 11.2mm grit) either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. / Case - I By Manual Means / (I) Bitumen (S-90) Including Biumen, all taxes and labour cess but excluding GST |
| 9 | Seal Coat - Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A,Type B and Type C as per Technical Specification Clause 510 / A. By Manual Means / Case - I : Type A / (I) Bitumen (S-90) Including Biumen, all taxes and labour cess but excluding GST |
| 10 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete . Including all taxes and labour cess but excluding GST |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 / I. P.C.C grade M 10 / (i) Nominal mix 1:3:6 ( Mechanical mix) Including all taxes and labour cess but excluding GST |
| 12 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 / I. Brick masonry in 1:3 cement mortar Including all taxes and labour cess but excluding GST |
| 13 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 / III. P.C.C. grade M 20 ( Mechanical mix) / (i) Nominal mix (1:2:4) |
| 14 | Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification / Rate as per item No.12.3 of Chapter 12 |
| 15 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 / Rate as per item No.12.2 of Chapter 12 Including all taxes and labour cess but excluding GST |
| 16 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row/Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106./(G) 350 mm Dia Including all taxes and labour cess but excluding GST |
| 17 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / 600 mm dia Including all taxes and labour cess but excluding GST |
| 18 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / (B) 1000 mm dia Including all taxes and labour cess but excluding GST |
| 19 | Kilometer Stone / Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 / ii) Ordinary Kilometer Stone (Precast) Including all taxes and labour cess but excluding GST |
| 20 | Kilometer Stone / Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 / iii) 200 m stone (precast) Including all taxes and labour cess but excluding GST |
| 21 | Direction and Place Identification signs upto 0.9 sqm size board / A. Retro-reflectorised Traffic Signs / (i) Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 Including all taxes and labour cess but excluding GST |
| 22 | Maintenance of Road Work constructed road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including all taxes and labour cess but excluding GST)(i) From completion of 1 Year to 2nd year 0.75% |
| 23 | (ii) 2nd year to 3rd year 1.50% |
| 24 | (iii) 3rd year to 4th year 2.25% |
| 25 | (iv) 4th year to 5th year 3.00% |
| 26 | Maintenance of C.C. Work constructed road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including all taxes and labour cess but excluding GST)(i) From completion of 1 Year to 2nd year 0.25% |
| 27 | (ii) 2nd year to 3rd year 0.50% |
| 28 | (iii) 3rd year to 4th year 0.75% |
| 29 | (iv) 4th year to 5th year 1.00% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender