Tender For Arrangement For Contractual Labours And Temporary Vats For Waste Flowers Etc. During Immersion Of Idols Of Durga Puja, Laxmi Puja, Kali Puja, Chhat Puja Etc. At Different Immersion Ghats Under Br.-Xiii.
Tender Value
3.49 Lakhs
Estimated cost
Bid Submission
16 Sep 2026
7 days left
EMD
7000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Arrangement For Contractual Labours And Temporary Vats For Waste Flowers Etc. During Immersion Of Idols Of Durga Puja, Laxmi Puja, Kali Puja, Chhat Puja Etc. At Different Immersion Ghats Under Br.-Xiii.
BOQ
| Sl. No. | Item Description |
| 1 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(B).MAINTENANCE WORKS?(11)Bamboo pile walling made of 65 mm to75 mm dia. Bamboo (in single line) driven about half length into theground at very close spacing side by side including necessarybamboo stays, ties, runners etc and lining the exposed portion withsheets made form cut-drums fitted and fixed complete as perdirection. (Payment to be made on length of wall(c) With bamboos oflength above 2.40 m. and up to 3.00 m. each |
| 2 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A).ORIGINAL WORKS?.(10)Bamboo walling made of crushed bambooor split bamboo or bamboo twigs(kanchis) as directed and tied withnecessary stiffners of split bamboo (in pairs) made of 100mm dia.Bamboo fitted and fixed complete (but excluding the cost ofsupporting frame work) |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of10% contractors profit and 1% Labour welfare cess which would beadmissible to the Contractors, but contractual percentage will not beapplicable. (II) The workersemployed on high rise building or anystructure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 4 | Sub Total |
| 5 | GST 18% |
| 6 | CESS 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 08, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysSep 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender