Tender For Running Contract For Carrying Out The O And M Works, Improvement Works And Capital Works, Maintenance Works And Dcw Works In Respect Of Assistant Executive Engineer / Distribution / Thirumangalam Sub Division In Thirumangalam Division Of M
Tender Overview
Project Description
Tender for Running Contract For Carrying Out The O And M Works, Improvement Works And Capital Works, Maintenance Works And Dcw Works In Respect Of Assistant Executive Engineer / Distribution / Thirumangalam Sub Division In Thirumangalam Division Of Medc/Madurai
BOQ
| Sl. No. | Item Description |
| 1 | 11KV OH Line |
| 2 | Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 7.5Mtr / 8.0 Mtr Poles(1.25 X 0.6 X 1.5M) |
| 3 | Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9.14 Mtr Poles / 9.0 Mtr PSC Poles |
| 4 | Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9Mtr square poles/above 9.14 Mtr pole All Metal poles |
| 5 | Excavation of Stay Pits including cleaning of site ,etc complete (0.95 X 0.6 X 1.2M) |
| 6 | Transporting of pole for 7.5m/8m RCC, PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by head load/ bullock cart including loading, and unloading charges upto a distance of 500M |
| 7 | Transporting of pole for RSJ pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M |
| 8 | Transporting of pole for 9mPSC pole 300kg / 400 kg from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M |
| 9 | Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M |
| 10 | Transporting of pole for 7.5m/8m RCC,PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD) |
| 11 | Transporting of pole for 9.m PSC pole/9.14m RCC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD) |
| 12 | Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD) |
| 13 | Erection of pole for HT/LT lines including scrub jungle and tree clearance, etc, complete (7.5m/8m) |
| 14 | Erection of RCC/PSC pole for HT/LT lines including scrub jungle and tree clearance, etc, complete (9.14/ 9.00m ) |
| 15 | Erection of RSJ/ 9m Square pole for HT/LT lines including scrub jungle and tree clearance, etc, complete |
| 16 | Erection of stay set complete including refilling of excavated earth fixing clamp stay rod, guy, binding etc., complete. |
| 17 | Earthing / coil earthing of pole including cutting, hooking and binding etc., complete |
| 18 | Paving of conductor, stringing, binding and jumpering etc., complete ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm |
| 19 | Paving of conductor, stringing, binding and jumpering etc., complete ACSR 7/132sqmm/ AAAC 7/3.15sqmm |
| 20 | Paving, stringing, sagging, binding and jumpering of conductor of size ACSR 7/4.09mm |
| 21 | Paving, stringing, sagging, binding and jumpering of conductor Leopard,Dog etc., |
| 22 | Resagging of HT/LT line of ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm |
| 23 | Resagging of HT/LT line of ACSR 7/132sqmm/ AAAC 7/3.15sqmm |
| 24 | Resagging of HT/LT line of ACSR 7/4.09mm |
| 25 | Resagging of HT/LT line of ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm Leopard,Dog etc., |
| 26 | Erection of single phase cross arm/with pin insulator/LT shackles, etc.,complete |
| 27 | Erection of T.I fittings with pin insulator/LT shackles, etc., complete |
| 28 | Erection of 3 phase cross arm without T.I Fittings with pin insulator/LT shackels etc., complete |
| 29 | Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines pin point location |
| 30 | Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV lines pin point location |
| 31 | Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines Cut point location |
| 32 | Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV lines Cut point location |
| 33 | Erection of Tapping channel cross arm |
| 34 | Double pole Transformer structure poles mass concrete (All materials including cement etc.,with Ratio 1:2:4) (0.72m3) (0.6x06x1.65m 0.6x0.6x0.35cum) |
| 35 | Mass concrete for pole on the line (All Materials including cement with Ratio 1:2:4) for 0.32m3) (0.60*0.45*1.20M) |
| 36 | Sleeve concrete for pole on the line (All Materials including cement with Ratio 1:2:4) for (0.202) (0.5x0.45x0.9M) |
| 37 | Sleeve concrete for stay (1:2:4) (all materials included cement) |
| 38 | Erection of double pole structure materials such as top channel, transformer seating channel, belting angle etc, complete |
| 39 | Erection of HG fuse unit (Double pole structure) |
| 40 | Erection of AB switch (Double pole structure) |
| 41 | Transformer structure grounding and earthing of structure complete (Double pole structure) |
| 42 | Transformer LT cable wiring/LT bus bar (Double pole structure) |
| 43 | Erection of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (single side) |
| 44 | Erection of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (double side) |
| 45 | Erection of HT Jumpering |
| 46 | Erection of HT LAS |
| 47 | Erection of LT LAS |
| 48 | Excavation of earth pit and erection of earth pipe with salt, coal and earth refilling, etc., complete (Cost of coal and salt) double pole structure |
| 49 | Providing earth tub for 3nos earth pit/including Labour |
| 50 | Transporting of structure materials ABS HG fuse, cable, etc., except pole |
| 51 | Painting two coats with approved quality of aluminum paint for transformer structure and iron materials including cost of paint |
| 52 | 2 Coat of Snowsem painting with reputed brand for transformer structure two nos. poles and cut stone including cost of paint,brush etc. complete. |
| 53 | Aluminium/Gray Painting of DT ( upto 100KVA) coats-with reputed brand painting Materials supplied by the contractor |
| 54 | Aluminium/Gray Painting of DT (Above 100KVA upto 500KVA) 2coats-with reputed brand painting Materials supplied by the contractor |
| 55 | Details of transformer name board including painting cost of MS sheet writing etc., complete I seating channel |
| 56 | Fabrication,Erection and excavation for centre support etc for 250/ 500 KVA DT including transporting & single pole DT also |
| 57 | Erection of transformer should be always done by board staff only, if done by contractor (W/O Crane upto 100 KVA) |
| 58 | Erection of transformer should be always done by board staff onlly, if done by contractor (W/O Crane abvoe 100 KVA) |
| 59 | Painting 2 coats of aluminum paint for ABS and DP structure iron material but excluding cost of paint |
| 60 | Labour charges for conversion of existing L.T Pin point into cut point in LT 3 Phase line for removing rewinding, restringing, resagging and temporary stay etc., complete as per TNEB standard |
| 61 | Labour charges for conversion of existing H.T Pin point into cut point including restringing, resagging and temporary stay etc., complete as per TNEB standard |
| 62 | Erection of D.P. structural iron materials such as top channel, cross bracing and earthing but excluding pole and ABS complete including welding and fabrication |
| 63 | Labour charges for split neutral guarding including earthing |
| 64 | Labour charges for the cradle guarding, including fixing cross arm, lacing etc., complete., etc., |
| 65 | Labour charges for fixing up of 1 earthing device |
| 66 | Fabrication/ Alteration of all classes of back clamps |
| 67 | Fabrication/ Alteration of all classes of stay clamp |
| 68 | Fabrication / Alteration of Special type of back clamp/V Clamp |
| 69 | Labour charges for loading 7.5m/8.0 PSC/RCC poles to the vehicle including stacking |
| 70 | Labour charges for Unloading 7.5m/8.0 PSC/RCC poles to the vehicle including stacking |
| 71 | Labour charges for loading 9 m PSC/RSJ 30ft poles to the vehicle |
| 72 | Labour charges for Unloading 9 m PSC/RSJ 30ft poles to the vehicle |
| 73 | Labour charges for loading RSJ poles above 30ft / 9m Square pole to the vehicle |
| 74 | Labour charges for Unloading RSJ poles above 30ft / 9m Square pole to the vehicle |
| 75 | Breaking of concrete in the damaged RCC pole and transporting the grill to the road side |
| 76 | Replacement of stay rod in existing stays |
| 77 | Replacement of guy shackle in existing stays |
| 78 | Clearing of tree branches( cocount trees) |
| 79 | Cutting Branches (other type of tree ) |
| 80 | Jungle clearance such as \\"Seemal Karuvel\\" etc. including up rooting |
| 81 | Set right the leaned poles with stay |
| 82 | Set right the leaned poles without stay |
| 83 | Providing new earth in lieu of deteriorated earth pipe including earth wire connection |
| 84 | Drilling of holes all size |
| 85 | Cutting of Rs joists, rail poles using gas welding |
| 86 | Cutting of channels |
| 87 | Cutting of angles |
| 88 | Erection of Metering set complete |
| 89 | Dismantling of metering set |
| 90 | Transporting charges of DT /Line materials using Private Vehicle upto 20 Km |
| 91 | Transporting charges of DT /Line materials using Private Vehicle (BEYOND 20 KM FOR EVERY KM) |
| 92 | Erection of Single pole mounted structure material, AB Switch, HG fuse set, seating channel, LAS, HT jumbering, LT open type & jumbering complete |
| 93 | Excavation of earth bit , Erection of earth pipes and structure earthing complete (earth troughs should be supplied by the contractor) for Single pole mounted transformer structure |
| 94 | Construction of plinth for 250 KVA /500 KVA DT in single pole structure system of size 1.2mx1.2m with earth work excavation upto 0.9m depth and PCC filling upto ground level and providing brickwork all round of 0.23m width, with 1:3 cement mortar upto 1.2m height, |
| 95 | Replacement of existing 33 KV conventional Insulator into polymer Insulator including binding etc complete (pin point) |
| 96 | Replacement of existing 11 KV conventional Insulator into polymer Insulator including binding etc complete (pin point) |
| 97 | Disconnection and re connection of 3 phase service connection wire |
| 98 | Disconnection and recollection of 1 phase service connection wire |
| 99 | Labour charge for replacement of existing 33 KV porcelain discs with polymer discs including restringing, resagging etc |
| 100 | Labour charge for replacement of existing 11 KV porcelain discs with polymer discs including restringing, resagging etc |
| 101 | Labour charge for carried out pole to pole inspection in HT/LT lines maintenace including insulator,Disc, shackle healthiness checking and renewal of pin insulator jumpering if required |
| 102 | Labour charge for erection of Side arm stud arrangement including pin insulator, jumpering etc., |
| 103 | Labour charge for erection of single pole mounted Vertical type AB switch with Excavation of earth pit and erection of earth pipe with salt, coal and earth refilling, etc., complete (Cost of coal and salt) |
| 104 | Labour charge for carried out of maintenance in all type of Distribution Transformers including yard cleaning, tightness of earthing, HT/LT bushing, cleaning of DT, Repalcement of Silica gel, renewal of LT/HT side fuse, renewal of jumpering in DT bushing, LT open type, LT Bus bar complete., etc.,) |
| 105 | Labour charge for carried out maintenance of 11KV/33KV AB switch in HT lines including replacement of Pin insulator & Post type insulator with jumpering and greasing complete etc., |
| 106 | Loading / unloading of all type of Distribution Transformers by Using Private crane |
| 107 | Dismantling of 7.5m/8m pole for HT/LT lines complete |
| 108 | Dismantling of 9.14/ 9.00m RCC/PSC pole for HT/LT lines, complete |
| 109 | Dismantling of RSJ/ 9m Square pole for HT/LT lines complete |
| 110 | Dismantling of stay set complete including refilling of excavated earth fixing clamp stay rod, guy, binding etc., complete. |
| 111 | Dismantling of conductor, stringing, binding and jumpering etc., complete ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm |
| 112 | Dismantling of conductor, stringing, binding and jumpering etc., complete ACSR 7/132sqmm/ AAAC 7/3.15sqmm |
| 113 | Dismantling of conductor, stringing, sagging, binding and jumpering of conductor of size ACSR 7/4.09mm |
| 114 | Dismantling of conductor, sagging, binding and jumpering of conductor Leopard,Dog etc., |
| 115 | Dismantling of single phase cross arm/with pin insulator/LT shackles, etc.,complete |
| 116 | Dismantling of T.I fittings with pin insulator/LT shackles, etc., complete |
| 117 | Dismantling of 3 phase cross arm without T.I Fittings with pin insulator/LT shackels etc., complete |
| 118 | Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines pin point location |
| 119 | Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV/22 KV lines pin point location |
| 120 | Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV/22 KV lines Cut point location |
| 121 | Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV/22 KV lines Cut point location |
| 122 | Dismantling of Tapping channel cross arm |
| 123 | Dismantling of Double pole structure materials such as top channel, transformer seating channel, belting angle etc, complete |
| 124 | Dismantling of HG fuse unit |
| 125 | Dismantling of Double pole structure AB switch |
| 126 | Dismantling of Transformer structure grounding and earthing of structure complete Double pole |
| 127 | Dismantling of Transformer LT cable wiring/LT bus bar |
| 128 | Dismantling of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (single side) |
| 129 | Dismantling of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (double side) |
| 130 | Dismantling of HT Jumpering |
| 131 | Dismantling of transformer should be always done by board staff onlly, if done by contractor (W/O Crane upto 100 KVA) |
| 132 | Dismantling of transformer should be always done by board staff onlly, if done by contractor (W/O Crane abvoe 100 KVA) |
| 133 | Dismantling of D.P. structural iron materials such as top channel bracing and earthing but excluding pole and ABS complete including welding and fabrication |
| 134 | Applicable SGST has to be quoted as numbers |
| 135 | Applicable CGST has to be quoted as numbers |
| 136 | Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \\"0\\" only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender