Tender For Running Contract For Carrying Out The O And M Works, Improvement Works And Capital Works, Maintenance Works And Dcw Works In Respect Of Assistant Executive Engineer / Distribution / Thirumangalam Sub Division In Thirumangalam Division Of M

Issued by Boards / Undertakings / PSU · Madurai, Tamil Nadu
Tender Value
15 Lakhs
Estimated cost
Bid Submission
23 Sep 2026
14 days left
EMD
15000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Madurai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Running Contract For Carrying Out The O And M Works, Improvement Works And Capital Works, Maintenance Works And Dcw Works In Respect Of Assistant Executive Engineer / Distribution / Thirumangalam Sub Division In Thirumangalam Division Of Medc/Madurai

BOQ

Name of Work:-
Sl. No. Item Description
111KV OH Line
2Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 7.5Mtr / 8.0 Mtr Poles(1.25 X 0.6 X 1.5M)
3Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9.14 Mtr Poles / 9.0 Mtr PSC Poles
4Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9Mtr square poles/above 9.14 Mtr pole All Metal poles
5Excavation of Stay Pits including cleaning of site ,etc complete (0.95 X 0.6 X 1.2M)
6Transporting of pole for 7.5m/8m RCC, PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by head load/ bullock cart including loading, and unloading charges upto a distance of 500M
7Transporting of pole for RSJ pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M
8Transporting of pole for 9mPSC pole 300kg / 400 kg from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M
9Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M
10Transporting of pole for 7.5m/8m RCC,PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD)
11Transporting of pole for 9.m PSC pole/9.14m RCC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD)
12Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD)
13Erection of pole for HT/LT lines including scrub jungle and tree clearance, etc, complete (7.5m/8m)
14Erection of RCC/PSC pole for HT/LT lines including scrub jungle and tree clearance, etc, complete (9.14/ 9.00m )
15Erection of RSJ/ 9m Square pole for HT/LT lines including scrub jungle and tree clearance, etc, complete
16Erection of stay set complete including refilling of excavated earth fixing clamp stay rod, guy, binding etc., complete.
17Earthing / coil earthing of pole including cutting, hooking and binding etc., complete
18Paving of conductor, stringing, binding and jumpering etc., complete ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm
19Paving of conductor, stringing, binding and jumpering etc., complete ACSR 7/132sqmm/ AAAC 7/3.15sqmm
20Paving, stringing, sagging, binding and jumpering of conductor of size ACSR 7/4.09mm
21Paving, stringing, sagging, binding and jumpering of conductor Leopard,Dog etc.,
22Resagging of HT/LT line of ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm
23Resagging of HT/LT line of ACSR 7/132sqmm/ AAAC 7/3.15sqmm
24Resagging of HT/LT line of ACSR 7/4.09mm
25Resagging of HT/LT line of ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm Leopard,Dog etc.,
26Erection of single phase cross arm/with pin insulator/LT shackles, etc.,complete
27Erection of T.I fittings with pin insulator/LT shackles, etc., complete
28Erection of 3 phase cross arm without T.I Fittings with pin insulator/LT shackels etc., complete
29Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines pin point location
30Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV lines pin point location
31Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines Cut point location
32Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV lines Cut point location
33Erection of Tapping channel cross arm
34Double pole Transformer structure poles mass concrete (All materials including cement etc.,with Ratio 1:2:4) (0.72m3) (0.6x06x1.65m 0.6x0.6x0.35cum)
35Mass concrete for pole on the line (All Materials including cement with Ratio 1:2:4) for 0.32m3) (0.60*0.45*1.20M)
36Sleeve concrete for pole on the line (All Materials including cement with Ratio 1:2:4) for (0.202) (0.5x0.45x0.9M)
37Sleeve concrete for stay (1:2:4) (all materials included cement)
38Erection of double pole structure materials such as top channel, transformer seating channel, belting angle etc, complete
39Erection of HG fuse unit (Double pole structure)
40Erection of AB switch (Double pole structure)
41Transformer structure grounding and earthing of structure complete (Double pole structure)
42Transformer LT cable wiring/LT bus bar (Double pole structure)
43Erection of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (single side)
44Erection of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (double side)
45Erection of HT Jumpering
46Erection of HT LAS
47Erection of LT LAS
48Excavation of earth pit and erection of earth pipe with salt, coal and earth refilling, etc., complete (Cost of coal and salt) double pole structure
49Providing earth tub for 3nos earth pit/including Labour
50Transporting of structure materials ABS HG fuse, cable, etc., except pole
51Painting two coats with approved quality of aluminum paint for transformer structure and iron materials including cost of paint
522 Coat of Snowsem painting with reputed brand for transformer structure two nos. poles and cut stone including cost of paint,brush etc. complete.
53Aluminium/Gray Painting of DT ( upto 100KVA) coats-with reputed brand painting Materials supplied by the contractor
54Aluminium/Gray Painting of DT (Above 100KVA upto 500KVA) 2coats-with reputed brand painting Materials supplied by the contractor
55Details of transformer name board including painting cost of MS sheet writing etc., complete I seating channel
56Fabrication,Erection and excavation for centre support etc for 250/ 500 KVA DT including transporting & single pole DT also
57Erection of transformer should be always done by board staff only, if done by contractor (W/O Crane upto 100 KVA)
58Erection of transformer should be always done by board staff onlly, if done by contractor (W/O Crane abvoe 100 KVA)
59Painting 2 coats of aluminum paint for ABS and DP structure iron material but excluding cost of paint
60Labour charges for conversion of existing L.T Pin point into cut point in LT 3 Phase line for removing rewinding, restringing, resagging and temporary stay etc., complete as per TNEB standard
61Labour charges for conversion of existing H.T Pin point into cut point including restringing, resagging and temporary stay etc., complete as per TNEB standard
62Erection of D.P. structural iron materials such as top channel, cross bracing and earthing but excluding pole and ABS complete including welding and fabrication
63Labour charges for split neutral guarding including earthing
64Labour charges for the cradle guarding, including fixing cross arm, lacing etc., complete., etc.,
65Labour charges for fixing up of 1 earthing device
66Fabrication/ Alteration of all classes of back clamps
67Fabrication/ Alteration of all classes of stay clamp
68Fabrication / Alteration of Special type of back clamp/V Clamp
69Labour charges for loading 7.5m/8.0 PSC/RCC poles to the vehicle including stacking
70Labour charges for Unloading 7.5m/8.0 PSC/RCC poles to the vehicle including stacking
71Labour charges for loading 9 m PSC/RSJ 30ft poles to the vehicle
72Labour charges for Unloading 9 m PSC/RSJ 30ft poles to the vehicle
73Labour charges for loading RSJ poles above 30ft / 9m Square pole to the vehicle
74Labour charges for Unloading RSJ poles above 30ft / 9m Square pole to the vehicle
75Breaking of concrete in the damaged RCC pole and transporting the grill to the road side
76Replacement of stay rod in existing stays
77Replacement of guy shackle in existing stays
78Clearing of tree branches( cocount trees)
79Cutting Branches (other type of tree )
80Jungle clearance such as \\"Seemal Karuvel\\" etc. including up rooting
81Set right the leaned poles with stay
82Set right the leaned poles without stay
83Providing new earth in lieu of deteriorated earth pipe including earth wire connection
84Drilling of holes all size
85Cutting of Rs joists, rail poles using gas welding
86Cutting of channels
87Cutting of angles
88Erection of Metering set complete
89Dismantling of metering set
90Transporting charges of DT /Line materials using Private Vehicle upto 20 Km
91Transporting charges of DT /Line materials using Private Vehicle (BEYOND 20 KM FOR EVERY KM)
92Erection of Single pole mounted structure material, AB Switch, HG fuse set, seating channel, LAS, HT jumbering, LT open type & jumbering complete
93Excavation of earth bit , Erection of earth pipes and structure earthing complete (earth troughs should be supplied by the contractor) for Single pole mounted transformer structure
94Construction of plinth for 250 KVA /500 KVA DT in single pole structure system of size 1.2mx1.2m with earth work excavation upto 0.9m depth and PCC filling upto ground level and providing brickwork all round of 0.23m width, with 1:3 cement mortar upto 1.2m height,
95Replacement of existing 33 KV conventional Insulator into polymer Insulator including binding etc complete (pin point)
96Replacement of existing 11 KV conventional Insulator into polymer Insulator including binding etc complete (pin point)
97Disconnection and re connection of 3 phase service connection wire
98Disconnection and recollection of 1 phase service connection wire
99Labour charge for replacement of existing 33 KV porcelain discs with polymer discs including restringing, resagging etc
100Labour charge for replacement of existing 11 KV porcelain discs with polymer discs including restringing, resagging etc
101Labour charge for carried out pole to pole inspection in HT/LT lines maintenace including insulator,Disc, shackle healthiness checking and renewal of pin insulator jumpering if required
102Labour charge for erection of Side arm stud arrangement including pin insulator, jumpering etc.,
103Labour charge for erection of single pole mounted Vertical type AB switch with Excavation of earth pit and erection of earth pipe with salt, coal and earth refilling, etc., complete (Cost of coal and salt)
104Labour charge for carried out of maintenance in all type of Distribution Transformers including yard cleaning, tightness of earthing, HT/LT bushing, cleaning of DT, Repalcement of Silica gel, renewal of LT/HT side fuse, renewal of jumpering in DT bushing, LT open type, LT Bus bar complete., etc.,)
105Labour charge for carried out maintenance of 11KV/33KV AB switch in HT lines including replacement of Pin insulator & Post type insulator with jumpering and greasing complete etc.,
106Loading / unloading of all type of Distribution Transformers by Using Private crane
107Dismantling of 7.5m/8m pole for HT/LT lines complete
108Dismantling of 9.14/ 9.00m RCC/PSC pole for HT/LT lines, complete
109Dismantling of RSJ/ 9m Square pole for HT/LT lines complete
110Dismantling of stay set complete including refilling of excavated earth fixing clamp stay rod, guy, binding etc., complete.
111Dismantling of conductor, stringing, binding and jumpering etc., complete ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm
112Dismantling of conductor, stringing, binding and jumpering etc., complete ACSR 7/132sqmm/ AAAC 7/3.15sqmm
113Dismantling of conductor, stringing, sagging, binding and jumpering of conductor of size ACSR 7/4.09mm
114Dismantling of conductor, sagging, binding and jumpering of conductor Leopard,Dog etc.,
115Dismantling of single phase cross arm/with pin insulator/LT shackles, etc.,complete
116Dismantling of T.I fittings with pin insulator/LT shackles, etc., complete
117Dismantling of 3 phase cross arm without T.I Fittings with pin insulator/LT shackels etc., complete
118Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines pin point location
119Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV/22 KV lines pin point location
120Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV/22 KV lines Cut point location
121Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV/22 KV lines Cut point location
122Dismantling of Tapping channel cross arm
123Dismantling of Double pole structure materials such as top channel, transformer seating channel, belting angle etc, complete
124Dismantling of HG fuse unit
125Dismantling of Double pole structure AB switch
126Dismantling of Transformer structure grounding and earthing of structure complete Double pole
127Dismantling of Transformer LT cable wiring/LT bus bar
128Dismantling of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (single side)
129Dismantling of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (double side)
130Dismantling of HT Jumpering
131Dismantling of transformer should be always done by board staff onlly, if done by contractor (W/O Crane upto 100 KVA)
132Dismantling of transformer should be always done by board staff onlly, if done by contractor (W/O Crane abvoe 100 KVA)
133Dismantling of D.P. structural iron materials such as top channel bracing and earthing but excluding pole and ABS complete including welding and fabrication
134Applicable SGST has to be quoted as numbers
135Applicable CGST has to be quoted as numbers
136Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \\"0\\" only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57405617
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 15 Lakhs
LAST DATE 23-09-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Running Contract For Carrying Out The O And M Works, Improvement Works And Capital Works, Maintenance Works And Dcw Works In Respect Of Assistant Executive Engineer / Distribution / Thirumangalam Sub Division In Thirumangalam Division Of Medc/Madurai
Basic Detail
Tender No SE/MEDC/ET/RUNNING CONTRACT/026/26-27
Bidding Type Tender
Location
City Madurai
State Tamil Nadu
Key Dates
Publish Date 08 Sep 2026
Submission Date 23 Sep 2026
Open Date 24 Sep 2026
Finance
Tender Value 15 Lakhs
Tender Fee Ref. Documents
EMD 15000
Exemption Available
Document List
7ab87405-c89f-4b62-ac89-b78c804f090f.html
BOQ_844474.xls
Tendernotice_1 (19).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Sep 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
html

7ab87405-c89f-4b62-ac89-b78c804f090f.html

xls

BOQ_844474.xls

pdf

Tendernotice_1 (19).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders