Tender for 200 NB Double Disc Valve ASSEMBLIES with pneumatic cylinder for Buffer Hoppers in Ash handling plant KTPS- V stage
Tender Overview
Project Description
200 NB Double Disc Valve ASSEMBLIES With Pneumatic Cylinder For Buffer Hoppers In Ash Handling Plant KTPS- V Stage , DOUBLE DISC VALVE COMPLETE ASSEMBLY, 200 NB, PNEUMATICALLY OPERATED, COMPLETE WITH: 1. End Covers (Qty. 2) - Cast Iron, IS:210 Gr. FG 260. 2. Middle Ring (Qty. 1) - Cast Iron, IS:210 Gr. FG 260. 3. Disc (Qty. 2) - Wear Resistant Special Alloy, 550 BHN (Min.). 4. Seat Ring, Replaceable Type (Qty. 2) - Wear Resistant Special Alloy, 550 BHN (Min.). 5. Gland (Qty. 1) - Leaded Tin Bronze, IS:318 Gr.2. 6. Gland Packing (Qty. 1) - Kevlar Packing. 7. Pin (Qty. 1) - Stainless Steel, AISI 304. 8. Disc Drive (Qty. 1) - Carbon Steel, EN-8. 9. Spring (Qty. 1) - PH Stainless Steel. 10. Fasteners (1 Set) - Carbon Steel, Hot Dip Galvanized. 11. Gasket (Qty. 2) - CAF/PTFE. 12. Spring (Qty. 1) - Stainless Steel. 13. Double Acting Pneumatic Actuator Material Of Construction (MOC) Of All Components Shall Strictly Conform To The Approved Manufacturing Drawing. The Complete Assembly Shall Be Fully Interchangeable With The Existing Installed Valve Without Any Modification.
BOQ
| Sl. No. | Item Name |
| 1 | DOUBLE DISC VALVE COMPLETE ASSEMBLY, 200 NB, PNEUMATICALLY OPERATED, COMPLETE WITH: 1. End Covers (Qty. 2) - Cast Iron, IS:210 Gr. FG 260. 2. Middle Ring (Qty. 1) - Cast Iron, IS:210 Gr. FG 260. 3. Disc (Qty. 2) - Wear Resistant Special Alloy, 550 BHN (Min.). 4. Seat Ring, Replaceable Type (Qty. 2) - Wear Resistant Special Alloy, 550 BHN (Min.). 5. Gland (Qty. 1) - Leaded Tin Bronze, IS:318 Gr.2. 6. Gland Packing (Qty. 1) - Kevlar Packing. 7. Pin (Qty. 1) - Stainless Steel, AISI 304. 8. Disc Drive (Qty. 1) - Carbon Steel, EN-8. 9. Spring (Qty. 1) - PH Stainless Steel. 10. Fasteners (1 Set) - Carbon Steel, Hot Dip Galvanized. 11. Gasket (Qty. 2) - CAF/PTFE. 12. Spring (Qty. 1) - Stainless Steel. 13. Double Acting Pneumatic Actuator Material of Construction (MOC) of all components shall strictly conform to the approved manufacturing drawing. The complete assembly shall be fully interchangeable with the existing installed valve without any modification. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender