Tender For Regarding Running Contract For Construction Of Jhatpat Portal, Vidhayak/Sansad Nidhi, Ht/Lt Lines, Installation New T/F., Line Shifting, Colony Electrification Work & Other Works Against Sanctioned Packages Time To Time In The Scheme Of De
Tender Overview
Project Description
Tender for Regarding Running Contract For Construction Of Jhatpat Portal, Vidhayak/Sansad Nidhi, Ht/Lt Lines, Installation New T/F., Line Shifting, Colony Electrification Work & Other Works Against Sanctioned Packages Time To Time In The Scheme Of Deposite Works Of Edsd Mawana & Edsd Phlawada Under The Area Of Edd Mawana.
BOQ
| Sl. No. | Item Description |
| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
| 2 | A) PCC Pole 8.5 mtr long. |
| 3 | B) PCC Pole 11 mtr long/PCC pole 11 mtr long. |
| 4 | C) 11 KV XLPE Cable of Different sizes |
| 5 | E) 11 KV CT/PT unit of Different size |
| 6 | F) 11 KV Jointing Kit of Different size |
| 7 | G) 11 KV Pilfer proof Cubical of Different size |
| 8 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 9 | Cartage of following material from JE Store to site including loading & unloading at both ends maximum distance up to 20 Km. :–A) PCC Pole 8.5 mtr long. |
| 10 | B) PCC Pole 11 mtr long/STP pole 11/13 mtr long. |
| 11 | C) 11 KV XLPE Cable of Different sizes |
| 12 | E) 11 KV CT/PT unit of Different size |
| 13 | F) 11 KV Jointing Kit of Different size |
| 14 | G) 11 KV Pilfer proof Cubical of Different size |
| 15 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 16 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.) 1-250 KVA to 400 KVA |
| 17 | 2-63 KVA to 100 KVA |
| 18 | 3-10 KVA to 25 KVA |
| 19 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 20 km.)1-250 KVA to 400 KVA |
| 20 | 2-63 KVA to 100 KVA |
| 21 | 3-10 KVA to 25 KVA |
| 22 | Erection of PCC 8.5 Mtr Long PCC 11 Mtr pole long. including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. |
| 23 | Erection of D/P on PCC 8.5 /Pcc Poles 11 Mtr after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. |
| 24 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 25 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 26 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Dog Conductor. |
| 27 | 1-Rabbit Conductor. |
| 28 | 2-Weasel Conductor. |
| 29 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 30 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line. 1-250 KVA to 400 KVA |
| 31 | 2-63 KVA to 100 KVA |
| 32 | 3-10 KVA to 25 KVA |
| 33 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-LT Pin Clamps with nut & bolt. |
| 34 | 2-Shackle Insulator with nut & bolt. |
| 35 | 3-Double Pole Clamps with nut & bolt. |
| 36 | Providing and fixing LT Distribution box along with Nut &Bolts. |
| 37 | Providing and fixing Piercing Clamp. |
| 38 | Providing and fixing Dead & End Clamp. |
| 39 | Providing and fixing Telless unit |
| 40 | Providing and fixing Suspension Clamp. |
| 41 | Providing and fixing Bolt and Nuts. |
| 42 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 43 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 44 | Providing & Fixing of F-Clamp for PCC Pole/STP made of MS flat of size 50X6mm with nut & bolt. |
| 45 | Providing & fixing of cross arm holding clamp for PCC Pole/STP made MS flat of size 50X6mm with nut & bolt. |
| 46 | Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories . |
| 47 | Fabrication and fixing of all 11 KV H.T/L.T. line accessories. |
| 48 | Making section T-off for 11 KV/LT Line. |
| 49 | Cutting & Chopping of tree branches. |
| 50 | Jumpering of 11 KV/LT Line at different places/T points. |
| 51 | Grouting of PCC/ST poles with Dust, Cement &Stone blast concretibg as per norms. |
| 52 | Guarding of 11 KV Line as per norms. |
| 53 | Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. |
| 54 | Fixing of Junction Box & making connection & other related works. |
| 55 | Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4\\" dia upto 30 mtr depth/water level. |
| 56 | Chemical Earthing as per Normes |
| 57 | Fixing of TPMO at D/P. |
| 58 | Fixing of Fuse Set at D/P. |
| 59 | Fabrication of cable Jointing/termination kit. |
| 60 | Laying lifting stringing of proper sagging of 11 KV XLPE Cable of different sizes with filling jointing kit different size. |
| 61 | Laying lifting & sagging of LT line with A.B. Conductor of different size including proper binding & jumpring (3x50, 3x95, 3x120, 1x16 sqmm.) |
| 62 | Making new Fencing for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). |
| 63 | Making new Plinth for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender