Bids Are invited for Custom Bid For Services - Upkeeping, Painting And Monitoring Of Caaqms Room And Its Equipment Inside And Top Of Roof 24X7 Under Gondegaon Sub Area 2Nd Call - Taking Out Existing Cc Interlocking Paver Blocks From Footpath/ Central
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Upkeeping, Painting And Monitoring Of Caaqms Room And Its Equipment Inside And Top Of Roof 24X7 Under Gondegaon Sub Area 2Nd Call - Taking Out Existing Cc Interlocking Paver Blocks From Footpath/ Centralverge, Including Removal Of Rubbish Etc. Disposal Of Unserviceable Material To The Dumping Ground, For Which Payment Shall Be Made Separately And Stacking Of Serviceable Material Within 50 Metre Lead As Per Direction Of Engineer-In-Charge. , Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan), Including Dressing Of Sides And Ramming Of Bottoms, For All Lift, Including Getting Out The Excavated Soil Nd Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. All Kinds Of Soil. , Supplying And Filling In Plinth With Sand Under Floors, Including Watering, Ramming, Consolidating And Dressing Complete , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:3:6 (1 Cement : 3 Coarse Sand (Zone-Iii) Derived From Natural Sources : 6 Graded Stone Aggregate 20 Mm Nominal Size Derived From Natural Sources) , Providing And Laying Non-Pressure Np2 Class (Light Duty) R.C.C. Pipes With Collars Jointed With Stiff Mixture Of Cement Mortar In The Proportion Of 1:2 (1 Cement : 2 Fine Sand) Including Testing Of Joints Etc. Complete : 300 Mm Dia. R.C.C. Pipe , Filling Available Excavated Earth (Excluding Rock) In Trenches, Plinth. Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And For All Lift , Laying Old Cement Concrete Interlocking Paver Blocks Of Any Design/Shape Laid In Required Line, Level, Curvature, Colour And Pattern Over And Including 50 Mm Thick Compacted Bed Of Coarse Sand, Filling The Joints With Fine Sand Etc. All Complete As Per The Direction Of Engineer-Incharge. (Old Cc Paver Blocks Shall Be Supplied By The Department Free Of Cost) , Supplying And Applying Bituminous Solution Primer On Roof And / Or Wall Surface At 0.24 Litre Per Sqm. , Distempering With 1St Quality Acrylic Distemper (Ready Mixed) Having Voc Content Less Than 50 Gram/Litre, Of Approved Manufacturer, Of Required Shade And Colour All Complete: New Work (Two Or More Coats) Over And Including Water Thinnable Priming Coat With Cement Primer Having Voc Content Less Than 50 Pram/Litre , Finishing Walls With Premium Acrylic Smooth Exterior Paint With Silicone Additives Of Required Shade New Work (Two Or More Coats Applied @ 1.43 Itr/10 Sqm Over And Including Priming Coat Of Exterior Primer Applied @ 0.90 Litre/10 Sqm) , Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture Of Required Colour To Give An Even Shade One Or More Coats On Old Work , Clearing Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of Girth Up To 30 Cm Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Up To A Distance Of 50 M Outside The Periphery Of The Area , Monitoring Of Caaqms Room And All The Equipments Inside And On Top Of Roof By Providing Required Manpower Including Cleaning Of Surrounding Area Of Room, Etc. All As Per Direction Of Enginer In Charge In Three Shifts Daily.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Taking out existing CC interlocking paver blocks from footpath/ centralverge, including removal of rubbish etc. disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | Taking out existing CC interlocking paver blocks from footpath/ centralverge, including removal of rubbish etc. disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil nd disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil nd disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 300 mm dia. R.C.C. pipe | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 300 mm dia. R.C.C. pipe |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift |
| 7 | Laying old cement concrete interlocking paver blocks of any design/shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of engineer-incharge. (Old CC paver blocks shall be supplied by the department free of cost) | Laying old cement concrete interlocking paver blocks of any design/shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of engineer-incharge. (Old CC paver blocks shall be supplied by the department free of cost) |
| 8 | Supplying and applying bituminous solution primer on roof and / or wall surface at 0.24 litre per sqm. | Supplying and applying bituminous solution primer on roof and / or wall surface at 0.24 litre per sqm. |
| 9 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer, of required shade and colour all complete: New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 pram/litre | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer, of required shade and colour all complete: New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 pram/litre |
| 10 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 Itr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 Itr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade One or more coats on old work | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade One or more coats on old work |
| 12 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area |
| 13 | Monitoring of CAAQMS Room and all the equipments inside and on top of roof by providing required manpower including cleaning of surrounding area of room, etc. all as per direction of Enginer In charge in three shifts daily. | Monitoring of CAAQMS Room and all the equipments inside and on top of roof by providing required manpower including cleaning of surrounding area of room, etc. all as per direction of Enginer In charge in three shifts daily. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.