Tender For Setting Up Of A Surface Coal Gasification Facility For The Coal-To-Synthetic Natural Gas (Sng) Project At Juna Kunada Ocm, Majri Area In Wcl Coalfields, Maharashtra Under Lepc Basis.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Dec 2026
84 days left
EMD
50 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chandrapur → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Setting Up Of A Surface Coal Gasification Facility For The Coal-To-Synthetic Natural Gas (Sng) Project At Juna Kunada Ocm, Majri Area In Wcl Coalfields, Maharashtra Under Lepc Basis.
BOQ
| Sl. No. | Item Description |
| 1 | SP-0:LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS:Development of complete Surface Coal Gasification Facility including integration of process technology licensors, preparation of basic and detailed engineering, procurement, inspection, transportation, erection and installation of all equipment and systems, construction, commissioning, start-up, and performance testing as per tender document. |
| 2 | 2.0 BREAK UP OF SUPPLY PRICE |
| 3 | Indigenous Items (Quoted in INR) |
| 4 | Proprietary Process Equipment |
| 5 | Non-proprietary Equipment Static Equipment Rotating Equipment Packaged Equipment Other Non-proprietary Equipment Electrical Equipment |
| 6 | Other Indigenous Supply Hardwares and Panels Instrumentation and Valves Mechanical Materials Refractory Catalyst / adsorbent / proprietary chemicals / consumables Piping and Piping Materials Fabricated Items Electrical and instrumentation Materials |
| 7 | Supply not covered in 3.1 to 3.3 |
| 8 | Indigenous Commissioning Spares and Madetory Spares |
| 9 | Commissioning Spares |
| 10 | Mandatory Spares |
| 11 | Special Tools & Tackles |
| 12 | Spares not covered from 4.1 to 4.3 |
| 13 | Indigenous Construction Materials |
| 14 | Cement |
| 15 | Reinforcement Steel |
| 16 | Insulation and Building Materials |
| 17 | Other Construction Materials Break up of Local Currency (INR) part of Lumpsum price for Service items for completion of scope of work |
| 18 | Engineering/Services |
| 19 | License Fees (Technology Licensor) |
| 20 | Basic Design Engineering Package (Technology Licensor) |
| 21 | Essential Services (Technology Licensor) |
| 22 | Training Services (Technology Licensor) |
| 23 | Post-PGTR Technical Support |
| 24 | Installation & Commissioning Services |
| 25 | Civil Works |
| 26 | Structural Works |
| 27 | Mechanical Work Piping Insulation Refractory Painting Vessels All Equipment except Vessels Refractory |
| 28 | Electrical & Plant Communication Works |
| 29 | Instrumentation Works |
| 30 | Commissioning Works |
| 31 | 2.0 BREAK UP OF SUPPLY PRICE |
| 32 | Imported Item (Quoted in Foreign Currency) |
| 33 | Proprietary Process Equipment |
| 34 | Non-proprietary Equipment Static Equipment Rotating Equipment Packaged Equipment Other Non-proprietary Equipment Electrical Equipment |
| 35 | Other Imported Supply Hardwares and Panels Instrumentation and Valves Refractory Catalyst / adsorbent / proprietary chemicals / consumables |
| 36 | Supply not covered in 1.1 to 1.3 |
| 37 | Imported Commissioning Spares and Mandatory Spares |
| 38 | Commissioning Spares |
| 39 | Mandatory Spares |
| 40 | Special Tools & Tackles |
| 41 | Spares not covered from 2.1 to 2.3 Break up of Foreign Currency part of Lumpsum price for Service items for completion of scope of work |
| 42 | Engineering/Services |
| 43 | License Fees (Technology Licensor) |
| 44 | Basic Design Engineering Package (Technology Licensor) |
| 45 | Essential Services (Technology Licensor) |
| 46 | Training Services (Technology Licensor) |
| 47 | Post-PGTR Technical Support FURTHER BREAK-UP OF LUMP SUM PRICE FOR SUPPLY PORTION (AS QUOTED IN SP-1) Tender Inviting Authority: GM-Business Development (CIL), Coal India Limited Name of Work: Setting up of a Surface Coal Gasification Facility for the Coal-to-Synthetic Natural Gas (SNG) Project at Juna Kunada OCM, Majri Area in WCL Coalfields, Maharashtra under LEPC Basis. Tender No: CIL/BD/CTC/LEPC/SCG/2026/15 Date: 07/09/2026 (E-TENDER NOTICE No. 02/2026-27 ) Name of the Bidder/ Bidding Firm / Company : Please Enter The Bidder Name in BoQ1 Sheet Notes: 1) Bidder to furnish breakup of SP-1 price in this Form SP-4 in terms of % of SP-1 prices. 2) Bidder to ensure that total of percentage indicated against all the items below for supply shall be total 100% of Total Lumpsum Supply Price quoted in Form SP-1. 3) Prices are inclusive of Third Party Inspection (TPI) charges . PRICE SCHEDULE (FORM SP-4) SL. NO. DESCRIPTION Breakup of Lumpsum Supply price as per SP-1 (in %) Breakup of Lumpsum Supply price BREAK UP OF SUPPLY PRICE |
| 48 | Imported Item (Quoted in Foreign Currency) |
| 49 | Proprietary Process Equipment |
| 50 | Non-proprietary Equipment 1.2.1 Static Equipment 0.0 1.2.2 Rotating Equipment 0.0 1.2.3 Packaged Equipment 0.0 1.2.4 Other Non-proprietary Equipment 0.0 1.2.5 Electrical Equipment 0.0 |
| 51 | Other Imported Supply 1.3.1 Hardwares and Panels 0.0 1.3.2 Instrumentation and Valves 0.0 1.3.3 Refractory 0.0 1.3.4 Catalyst / adsorbent / proprietary chemicals / consumables 0.0 |
| 52 | Supply not covered in 1.1 to 1.3 |
| 53 | Imported Commissioning Spares and Mandatory Spares |
| 54 | Commissioning Spares |
| 55 | Mandatory Spares |
| 56 | Special Tools & Tackles |
| 57 | Spares not covered from 2.1 to 2.3 Total imported items (Quoted in Foreign Currency) 0.0 0.0 |
| 58 | Indigenous Items (Quoted in INR) |
| 59 | Proprietary Process Equipment |
| 60 | Non-proprietary Equipment 3.2.1 Static Equipment 0.0 3.2.2 Rotating Equipment 0.0 3.2.3 Packaged Equipment 0.0 3.2.4 Other Non-proprietary Equipment 0.0 3.2.5 Electrical Equipment 0.0 |
| 61 | Other Indigenous Supply 3.3.1 Hardwares and Panels 0.0 3.3.2 Instrumentation and Valves 0.0 3.3.3 Mechanical Materials 0.0 3.3.4 Refractory 0.0 3.3.5 Catalyst / adsorbent / proprietary chemicals / consumables 0.0 3.3.6 Piping and Piping Materials 0.0 3.3.7 Fabricated Items 0.0 3.3.8 Electrical and instrumentation Materials 0.0 |
| 62 | Supply not covered in 3.1 to 3.3 |
| 63 | Indigenous Commissioning Spares and Madetory Spares |
| 64 | Commissioning Spares |
| 65 | Mandatory Spares |
| 66 | Special Tools & Tackles |
| 67 | Spares not covered from 4.1 to 4.3 |
| 68 | Indigenous Construction Materials |
| 69 | Cement |
| 70 | Reinforcement Steel |
| 71 | Insulation and Building Materials |
| 72 | Other Construction Materials Total indigenous items (Quoted in INR) 0.0 0.0 Check 0 BREAKUP OF TOTAL LUMPSUM SERVICE PRICE - ENGINEERING, CONSTRUCTION / INSTALLATION, START-UP, PRE- COMMISSIONING, COMMISSIONING. (AS QUOTED IN SP-2) Tender Inviting Authority: GM-Business Development (CIL), Coal India Limited Name of Work: Setting up of a Surface Coal Gasification Facility for the Coal-to-Synthetic Natural Gas (SNG) Project at Juna Kunada OCM, Majri Area in WCL Coalfields, Maharashtra under LEPC Basis. Tender No: CIL/BD/CTC/LEPC/SCG/2026/15 Date: 07/09/2026 (E-TENDER NOTICE No. 02/2026-27 ) Name of the Bidder/ Bidding Firm / Company : Please Enter The Bidder Name in BoQ1 Sheet Notes: 1) Bidder to furnish breakup of SP-2 in Form SP-5 in terms of % of total Service Price quoted in SP-2 2) Bidder to ensure that total of percentage indicated against all the items below for services shall be total 100% for Total Lumpsum Prices for Services (Engineering + Construction) quoted in SP-2. PRICE SCHEDULE (FORM SP-5) SL. NO. DESCRIPTION Breakup of Lumpsum Engineering & Service price as per SP-2 (in %) Breakup of Lumpsum Engineering & Service price as per SP-2 Break up of Foreign Currency part of Lumpsum price for Service items for completion of scope of work |
| 73 | Engineering/Services |
| 74 | License Fees (Technology Licensor) |
| 75 | Basic Design Engineering Package (Technology Licensor) |
| 76 | Essential Services (Technology Licensor) |
| 77 | Training Services (Technology Licensor) |
| 78 | Post-PGTR Technical Support TOTAL ENGINEERING PRICE (Foreign Currency) 0.0 0.0 Break up of Local Currency (INR) part of Lumpsum price for Service items for completion of scope of work |
| 79 | Engineering/Services |
| 80 | License Fees (Technology Licensor) |
| 81 | Basic Design Engineering Package (Technology Licensor) |
| 82 | Essential Services (Technology Licensor) |
| 83 | Training Services (Technology Licensor) |
| 84 | Post-PGTR Technical Support TOTAL ENGINEERING PRICE (Local Currency) 0.0 0.0 |
| 85 | Installation & Commissioning Services |
| 86 | Civil Works |
| 87 | Structural Works |
| 88 | Mechanical Work 3.3.1 Piping 0.0 3.3.2 Insulation 0.0 3.3.3 Refractory 0.0 3.3.4 Painting 0.0 3.3.5 Vessels 0.0 3.3.6 All Equipment except Vessels 0.0 3.3.7 Refractory 0.0 |
| 89 | Electrical & Plant Communication Works |
| 90 | Instrumentation Works |
| 91 | Commissioning Works Total Installation & Commissioning Price (Local Currency) 0.0 0.0 TOTAL ENGINEERING & SERVICE PRICE (Local Currency) 0.0 0.0 Check 0 |
| 92 | SP-0:LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS:Development of complete Surface Coal Gasification Facility including integration of process technology licensors, preparation of basic and detailed engineering, procurement, inspection, transportation, erection and installation of all equipment and systems, construction, commissioning, start-up, and performance testing as per tender document. |
| 93 | SP-1: (Supply portion):Lumpsum price for supply portion for completion of scope of work as |
| 94 | Foreign Currency part of Lumpsum price for supply items for completion of scope of work (CIF basis) |
| 95 | Local Currency (INR) part of Lumpsum price for supply items for completion of scope of work (FOR basis) |
| 96 | SP-2: (Engineering & Services portion): |
| 97 | Foreign Currency part of Lumpsum price for Service items for completion of scope of work |
| 98 | Local Currency (INR) part of Lumpsum price for Service items for completion of scope of work |
| 99 | Operating Cost Estimate Consumption parameter for production of 336,000 Nm3/hr (CO+H2 equi.) of Raw gas |
| 100 | Beneficiated Coal (20% ash) |
| 101 | Limestone |
| 102 | Power |
| 103 | HP Gaseous Oxygen |
| 104 | HP Gaseous Nitrogen |
| 105 | LP Gaseous Nitrogen |
| 106 | HP Superheated Steam |
| 107 | HP Saturated Steam |
| 108 | MP Steam |
| 109 | LP Steam |
| 110 | Make-up water |
| 111 | Cooling water |
| 112 | Boiler feed water |
| 113 | Demineralized Water |
| 114 | Service / Drinking water |
| 115 | Instrument Air |
| 116 | Plant Air |
| 117 | Owner's Manpower Required for 3-Shift O&M Operation |
| 118 | Additional items (if required) |
| 119 | Additional items (if required) |
| 120 | Additional items (if required) |
| 121 | Credit - HP Superheated Steam generation |
| 122 | Credit - HP Saturated Steam generation |
| 123 | Credit - MP Steam generation |
| 124 | Credit - LP Steam generation |
| 125 | Revenue Raw Syngas Production Foreign Currency part, in amount Local Currency (INR) part, in amount 1.0 SP-0:LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS:Development of complete Surface Coal Gasification Facility including integration of process technology licensors, preparation of basic and detailed engineering, procurement, inspection, transportation, erection and installation of all equipment and systems, construction, commissioning, start-up, and performance testing as per tender document. Total 1.0 2.0 3.0 4.0 5.0 Rs. Crore SP-1: Supply Supply except Commissioning/Mandatory Spares & Construction materials e.g. Cement, Steel Foreign Currency part, in amount 0.0 0.1 0.35 0.35 0.20000000000000007 0.0 Local Currency (INR) part, in amount 0.0 0.1 0.35 0.35 0.20000000000000007 0.0 Commissioning Spares and Madetory Spares Foreign Currency part, in amount 0.0 0.6 0.2 0.19999999999999996 0.0 Local Currency (INR) part, in amount 0.0 0.6 0.2 0.19999999999999996 0.0 Construction materials e.g. Cement, Steel, in amount Foreign Currency part, in amount Local Currency (INR) part, in amount 0.0 0.4 0.4 0.19999999999999996 0.0 SP-2: Engineering/Services License Fees, in amount Foreign Currency part, in amount 0.0 0.5 0.5 0.0 Local Currency (INR) part, in amount 0.0 0.5 0.5 0.0 Basic Design Engineering Package (BDEP), in amount Foreign Currency part, in amount 0.0 0.5 0.5 0.0 Local Currency (INR) part, in amount 0.0 0.5 0.5 0.0 Essential Services (Technology Licensor), in amount Foreign Currency part, in amount 0.0 0.2 0.4 0.2 0.19999999999999996 0.0 Local Currency (INR) part, in amount 0.0 0.2 0.4 0.2 0.19999999999999996 0.0 Training Services (Technology Licensor), in amount Foreign Currency part, in amount 0.0 0.5 0.5 0.0 Local Currency (INR) part, in amount 0.0 0.5 0.5 0.0 Post-PGTR Technical Support Foreign Currency part, in amount 0.0 1.0 0.0 Local Currency (INR) part, in amount 0.0 1.0 0.0 SP-2: Installation & Commissioning Services Civil Works 0.0 0.4 0.4 0.19999999999999996 0.0 Structural Works 0.0 0.1 0.4 0.3 0.19999999999999996 0.0 Mechanical Work — Piping 0.0 0.2 0.4 0.3999999999999999 0.0 Mechanical Work — Insulation 0.0 0.5 0.5 0.0 Mechanical Work — Refractory 0.0 0.5 0.5 0.0 Mechanical Work — Painting 0.0 0.2 0.8 0.0 Mechanical Work — Vessels 0.0 0.35 0.4 0.25 0.0 Mechanical Work — All Equipment except Vessels 0.0 0.35 0.4 0.25 0.0 Refractory 0.0 0.35 0.4 0.25 0.0 Electrical & Plant Communication Works 0.0 0.2 0.5 0.30000000000000004 0.0 Instrumentation Works 0.0 0.5 0.5 0.0 Commissioning Works 0.0 1.0 0.0 Total Foreign Currency part, in amount 0.0 0.0 0.0 0.0 0.0 0.0 Local Currency (INR) part, in amount 0.0 0.0 0.0 0.0 0.0 0.0 4.0 Operating Cost Estimate Annual operating hours 7920.0 Parameter UoM Quantity (Guaranteed) Unit rate(Rs / UoM) Annual Cost, in Mill INR Remarks Variable Cost Feed Beneficiated Coal (20% ash) kg/hr 0.0 6.2 0.0 Limestone kg/hr 0.0 2.6 0.0 Cost above material Power kwh/hr 0.0 8.5 0.0 HP Gaseous Oxygen kg/hr 0.0 5.25 0.0 HP Gaseous Nitrogen kg/hr 0.0 1.5 0.0 LP Gaseous Nitrogen kg/hr 0.0 1.0 0.0 HP Superheated Steam kg/hr 0.0 1.25 0.0 HP Saturated Steam kg/hr 0.0 1.0 0.0 MP Steam kg/hr 0.0 1.17 0.0 LP Steam kg/hr 0.0 1.03 0.0 Make-up water m3/hr 0.0 3.0 0.0 Cooling water m3/hr 0.0 1.1 0.0 Boiler feed water m3/hr 0.0 1.1 0.0 Demineralized Water m3/hr 0.0 150.0 0.0 Service / Drinking water m3/hr 0.0 100.0 0.0 Instrument Air m3/hr 0.0 0.5 0.0 Plant Air m3/hr 0.0 0.5 0.0 Additional items (if required) 0.0 0.0 0.0 0.0 Additional items (if required) 0.0 0.0 0.0 0.0 Additional items (if required) 0.0 0.0 0.0 0.0 Credit Credit - HP Superheated Steam generation kg/hr 0.0 -1.25 0.0 Credit - HP Saturated Steam generation kg/hr 0.0 -1.0 0.0 Credit - MP Steam generation kg/hr 0.0 -1.17 0.0 Credit - LP Steam generation kg/hr 0.0 -1.03 0.0 Subtotal 0.0 Fixed Cost Owner's Manpower Required for 3-Shift O&M Operation Nos. 0.0 2000000.0 0.0 3 shift operation Subtotal 0.0 Total 0.0 5.0 Production Rampup 1st year 1.0 Percentage 2nd year 1.0 Percentage 3rd year 1.0 Percentage 4th year 1.0 Percentage 5th year onwards 1.0 Percentage NPV Calculation Inflation Year-on-year inflation on Capex 0.028 Year-on-year inflation on coal & steam 0.05 Year-on-year inflation on O&M charge 0.016 Inflation index Capex 1.0 1.028 1.056784 1.086373952 1.116792422656 1.148062610490368 1.1802083635840983 1.213254197764453 1.2472253153018578 1.2821476241303098 1.3180477576059586 1.3549530948189255 1.3928917814738555 1.4318927513551234 1.471985748393067 1.513201349348073 1.5555709871298191 1.599126974769454 1.6439025300629988 1.6899318009047628 1.7372498913300962 1.785892888287339 1.8358978891593847 1.8873030300558475 1.9401475148974112 1.9944716453145388 2.050316851383346 2.10772572322208 2.166742043472298 Coal & steam 1.0 1.05 1.1025 1.1576250000000001 1.2155062500000002 1.2762815625000004 1.3400956406250004 1.4071004226562505 1.477455443789063 1.5513282159785162 1.628894626777442 1.7103393581163142 1.79585632602213 1.8856491423232367 1.9799315994393987 2.0789281794113688 2.1828745883819374 2.2920183178010345 2.406619233691086 2.5269501953756404 2.6532977051444226 2.785962590401644 2.9252607199217264 3.071523755917813 3.225099943713704 3.386354940899389 3.5556726879443583 3.7334563223415764 3.9201291384586554 O&M Charges 1.0 1.016 1.032256 1.048772096 1.065552449536 1.082601288728576 1.0999229093482332 1.117521675897805 1.13540202271217 1.1535684550755647 1.1720255503567738 1.1907779591624823 1.2098304065090821 1.2291876930132275 1.248854696101439 1.268836371239062 1.289137753178887 1.3097639572297493 1.3307201805454252 1.3520117034341521 1.3736438906890986 1.3956221929401242 1.4179521480271662 1.440639382395601 1.4636896125139307 1.4871086463141536 1.5109023846551801 1.535076822809663 1.5596380519746176 (in crore) Project Development/Construction Project Operations O &M Period (LEPC) Cashflow Particulars 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 25.0 26.0 27.0 28.0 29.0 Capex outflow Foreign Currency part, in amount 0.0 0.0 0.0 0.0 0.0 Local Currency (INR) part, in amount 0.0 0.0 0.0 0.0 0.0 Annual Operating Cost Coal & steam 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Other cost 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Net Cashflow Foreign Currency part, in amount 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Local Currency (INR) part, in amount 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Net Present Value Foreign Currency part, in amount 0.0 Local Currency (INR) part, in amount 0.0 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 08, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 04, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 84 daysDec 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 85 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender