Communications and Information Technology Government Departments Closing in 20 days TDR #57399475

Bids Are invited for Renovation

Issued by Government Departments · Mumbai Suburban, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
29 Sep 2026
20 days left
EMD
5 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai Suburban → Maharashtra
EMD Exemption
Available
Quantity
2981

Project Description

Bids Are invited for Renovation A. Dismantling Disposal And Civil Works - Dismantling And Disposal Of Existing Facility , Civil Work - Wall Repair And Repainting , B. Clean Room Panel System Walls Ceiling And Flooring - Wall Cladding - Partition Panel System , Coving At Wall-To-Wall Wall-To-Ceiling And Floor-To-Wall Junctions , Ra Return Air Riser At Partition Base , Rcc Beam And Ceiling Cladding - Return Air Plenum Areas , False Ceiling , Esd Anti-Static Pvc Vinyl Flooring , Double-Glazed Vision - View Panels , Double-Glazed Vision - View Panels - Count , C. Doors - Clean-Room Compatible Doors General - Equipment Movement , Emergency Exit Door , Face-Biometric Access Control System At Main Entry , D. Lighting And Fixtures - Clean-Room Grade Led Light Fixtures , E. Hvac System - Ahu - Treated Fresh Air Tfa Unit - Supply Installation Testing And Commissioning , Ductwork - Gi-Aluminium- Insulated- Clean- Room Compatible , Terminal Hepa Fan Filter Units -Ffu , Exhaust Air System - Chemical Room , F. Electrical- Power- Gas And Plumbing Services - Electrical Switches - 16-5A- Wall-Mounted , Three-Phase Power Connection Points , Wiring And Fixtures , Power Backup - Dedicated Ups Port , Grounding System - Copper Strip , Gas Line - Commercial Nitrogen -N2 , Gas Line - Compressed Air , Gas Line - Blank- Spare Line , Water Chiller Inlet And Outlet Piping , Process Chilled Water -Pcw- Piping Network , Ss316 Ep Tubing For Gases With Fittings , User Utility Points -Water- Gas- Air- With Fittings , G. Building Management System -Bms- Bms - Central Monitoring Station , Direct Digital Control -Ddc- Panel , Field And Room Sensors With Cabling , Bms Integration- Programming And Validation , H. Electrification -Distribution And Luminaires- Distribution Boards -Lighting- Power- Ups-Emergency , Cable Management System , Wires- Cables- Lighting- Power- Lan And Communication , Switch-Sockets And Mcbs , Clean-Room Bottom-Accessible Led Luminaires , Led Luminaires - Grey- Plenum Areas , I. Safety And Surveillance Systems - Smoke Detection System , Electronic Surveillance -Cctv- System , Biometric Access Control System , J. Furniture And Fixtures - Air Shower -If Required , Cross-Over Bench With Shoe Rack Underneath , Dressing Cupboard , Dry Nitrogen And Water Gun , Esd-Compatible Work Table , Ss Stools , Clean-Room Compatible Chairs , Emergency Eye Wash Cum Safety Shower , Shoe Cover Dispenser , K. Utility Systems - Air Curtain At Clean Room Entry , Motion Sensor Cctv Cabling , Fire Alarm And Smoke Detector Relocation , L. Post-Installation Testing- Validation And Certification - Clean Room - Hvac Validation And Performance Qualification - A. Dismantling Disposal And Civil Works - Dismantling And Disposal Of Existing Facility - The Detailed Specifications Are Mentioned In The Atc Documents. , Civil Work - Wall Repair And Repainting - The Detailed Specifications Are Mentioned In The Atc Documents. , B. Clean Room Panel System Walls Ceiling And Flooring - Wall Cladding - Partition Panel System - The Detailed Specifications Are Mentioned In The Atc Documents. , Coving At Wall-To-Wall Wall-To-Ceiling And Floor-To-Wall Junctions - The Detailed Specifications Are Mentioned In The Atc Documents. , Ra Return Air Riser At Partition Base - The Detailed Specifications Are Mentioned In The Atc Documents. , Rcc Beam And Ceiling Cladding - Return Air Plenum Areas - The Detailed Specifications Are Mentioned In The Atc Documents. , False Ceiling - The Detailed Specifications Are Mentioned In The Atc Documents. , Esd Anti-Static Pvc Vinyl Flooring - The Detailed Specifications Are Mentioned In The Atc Documents. , Double-Glazed Vision - View Panels - The Detailed Specifications Are Mentioned In The Atc Documents. , Double-Glazed Vision - View Panels - Count - The Detailed Specifications Are Mentioned In The Atc Documents. , C. Doors - Clean-Room Compatible Doors General - Equipment Movement - The Detailed Specifications Are Mentioned In The Atc Documents. , Emergency Exit Door - The Detailed Specifications Are Mentioned In The Atc Documents. , Face-Biometric Access Control System At Main Entry - The Detailed Specifications Are Mentioned In The Atc Documents. , D. Lighting And Fixtures - Clean-Room Grade Led Light Fixtures - The Detailed Specifications Are Mentioned In The Atc Documents. , E. Hvac System - Ahu - Treated Fresh Air Tfa Unit - Supply Installation Testing And Commissioning - The Detailed Specifications Are Mentioned In The Atc Documents. , Ductwork - Gi-Aluminium- Insulated- Clean-Room Compatible - The Detailed Specifications Are Mentioned In The Atc Documents. , Terminal Hepa Fan Filter Units -Ffu - The Detailed Specifications Are Mentioned In The Atc Documents. , Exhaust Air System - Chemical Room - The Detailed Specifications Are Mentioned In The Atc Documents. , F. Electrical- Power- Gas And Plumbing Services - Electrical Switches -16-5A- Wall-Mounted - The Detailed Specifications Are Mentioned In The Atc Documents. , Three-Phase Power Connection Points - The Detailed Specifications Are Mentioned In The Atc Documents. , Wiring And Fixtures - The Detailed Specifications Are Mentioned In The Atc Documents. , Power Backup - Dedicated Ups Port - The Detailed Specifications Are Mentioned In The Atc Documents. , Grounding System - Copper Strip - The Detailed Specifications Are Mentioned In The Atc Documents. , Gas Line - Commercial Nitrogen -N2 - The Detailed Specifications Are Mentioned In The Atc Documents. , Gas Line - Compressed Air - The Detailed Specifications Are Mentioned In The Atc Documents. , Gas Line - Blank-Spare Line - The Detailed Specifications Are Mentioned In The Atc Documents. , Water Chiller Inlet And Outlet Piping - The Detailed Specifications Are Mentioned In The Atc Documents. , Process Chilled Water -Pcw- Piping Network - The Detailed Specifications Are Mentioned In The Atc Documents. , Ss316 Ep Tubing For Gases With Fittings - The Detailed Specifications Are Mentioned In The Atc Documents. , User Utility Points -Water- Gas- Air- With Fittings - The Detailed Specifications Are Mentioned In The Atc Documents. , G. Building Management System -Bms- Bms - Central Monitoring Station - The Detailed Specifications Are Mentioned In The Atc Documents. , Direct Digital Control -Ddc- Panel - The Detailed Specifications Are Mentioned In The Atc Documents. , Field And Room Sensors With Cabling - The Detailed Specifications Are Mentioned In The Atc Documents. , Bms Integration- Programming And Validation - The Detailed Specifications Are Mentioned In The Atc Documents. , H. Electrification -Distribution And Luminaires-Distribution Boards -Lighting- Power- Ups-Emergency - The Detailed Specifications Are Mentioned In The Atc Documents. , Cable Management System - The Detailed Specifications Are Mentioned In The Atc Documents. , Wires- Cables- Lighting- Power- Lan And Communication - The Detailed Specifications Are Mentioned In The Atc Documents. , Switch-Sockets And Mcbs - The Detailed Specifications Are Mentioned In The Atc Documents. , Clean-Room Bottom-Accessible Led Luminaires - The Detailed Specifications Are Mentioned In The Atc Documents. , Led Luminaires - Grey-Plenum Areas - The Detailed Specifications Are Mentioned In The Atc Documents. , I. Safety And Surveillance Systems - Smoke Detection System - The Detailed Specifications Are Mentioned In The Atc Documents. , Electronic Surveillance -Cctv- System - The Detailed Specifications Are Mentioned In The Atc Documents. , Biometric Access Control System - The Detailed Specifications Are Mentioned In The Atc Documents. , J. Furniture And Fixtures - Air Shower -If Required - The Detailed Specifications Are Mentioned In The Atc Documents. , Cross-Over Bench With Shoe Rack Underneath - The Detailed Specifications Are Mentioned In The Atc Documents. , Dressing Cupboard - The Detailed Specifications Are Mentioned In The Atc Documents. , Dry Nitrogen And Water Gun - The Detailed Specifications Are Mentioned In The Atc Documents. , Esd-Compatible Work Table - The Detailed Specifications Are Mentioned In The Atc Documents. , Ss Stools - The Detailed Specifications Are Mentioned In The Atc Documents. , Clean-Room Compatible Chairs - The Detailed Specifications Are Mentioned In The Atc Documents. , Emergency Eye Wash Cum Safety Shower - The Detailed Specifications Are Mentioned In The Atc Documents. , Shoe Cover Dispenser - The Detailed Specifications Are Mentioned In The Atc Documents. , K. Utility Systems - Air Curtain At Clean Room Entry - The Detailed Specifications Are Mentioned In The Atc Documents. , Motion Sensor Cctv Cabling - The Detailed Specifications Are Mentioned In The Atc Documents. , Fire Alarm And Smoke Detector Relocation - The Detailed Specifications Are Mentioned In The Atc Documents. , L. Post-Installation Testing- Validation And Certification - Clean Room - Hvac Validation And Performance Qualification - The Detailed Specifications Are Mentioned In The Atc Documents.

BOQ

Sl. No. Item TitleItem Description
1A. DISMANTLING DISPOSAL AND CIVIL WORKS - Dismantling and disposal of existing facilityThe detailed specifications are mentioned in the ATC documents.
2Civil work - wall repair and repaintingThe detailed specifications are mentioned in the ATC documents.
3B. CLEAN ROOM PANEL SYSTEM WALLS CEILING AND FLOORING - Wall cladding - partition panel systemThe detailed specifications are mentioned in the ATC documents.
4Coving at wall-to-wall wall-to-ceiling and floor-to-wall junctionsThe detailed specifications are mentioned in the ATC documents.
5RA Return Air riser at partition baseThe detailed specifications are mentioned in the ATC documents.
6RCC beam and ceiling cladding - Return Air Plenum areasThe detailed specifications are mentioned in the ATC documents.
7False ceilingThe detailed specifications are mentioned in the ATC documents.
8ESD anti-static PVC vinyl flooringThe detailed specifications are mentioned in the ATC documents.
9Double-glazed vision - view panelsThe detailed specifications are mentioned in the ATC documents.
10Double-glazed vision - view panels - countThe detailed specifications are mentioned in the ATC documents.
11C. DOORS - Clean-room compatible doors general - equipment movementThe detailed specifications are mentioned in the ATC documents.
12Emergency exit doorThe detailed specifications are mentioned in the ATC documents.
13Face-biometric access control system at main entryThe detailed specifications are mentioned in the ATC documents.
14D. LIGHTING and FIXTURES - Clean-room grade LED light fixturesThe detailed specifications are mentioned in the ATC documents.
15E. HVAC SYSTEM - AHU - Treated Fresh Air TFA unit - supply installation testing and commissioningThe detailed specifications are mentioned in the ATC documents.
16Ductwork - GI-Aluminium- insulated- clean-room compatibleThe detailed specifications are mentioned in the ATC documents.
17Terminal HEPA Fan Filter Units -FFUThe detailed specifications are mentioned in the ATC documents.
18Exhaust air system - chemical roomThe detailed specifications are mentioned in the ATC documents.
19F. ELECTRICAL- POWER- GAS and PLUMBING SERVICES - Electrical switches -16-5A- wall-mountedThe detailed specifications are mentioned in the ATC documents.
20Three-phase power connection pointsThe detailed specifications are mentioned in the ATC documents.
21Wiring and fixturesThe detailed specifications are mentioned in the ATC documents.
22Power backup - dedicated UPS portThe detailed specifications are mentioned in the ATC documents.
23Grounding system - copper stripThe detailed specifications are mentioned in the ATC documents.
24Gas line - Commercial Nitrogen -N2The detailed specifications are mentioned in the ATC documents.
25Gas line - Compressed airThe detailed specifications are mentioned in the ATC documents.
26Gas line - Blank-spare lineThe detailed specifications are mentioned in the ATC documents.
27Water chiller inlet and outlet pipingThe detailed specifications are mentioned in the ATC documents.
28Process Chilled Water -PCW- piping networkThe detailed specifications are mentioned in the ATC documents.
29SS316 EP tubing for gases with fittingsThe detailed specifications are mentioned in the ATC documents.
30User utility points -water- gas- air- with fittingsThe detailed specifications are mentioned in the ATC documents.
31G. BUILDING MANAGEMENT SYSTEM -BMS- BMS - central monitoring stationThe detailed specifications are mentioned in the ATC documents.
32Direct Digital Control -DDC- panelThe detailed specifications are mentioned in the ATC documents.
33Field and room sensors with cablingThe detailed specifications are mentioned in the ATC documents.
34BMS integration- programming and validationThe detailed specifications are mentioned in the ATC documents.
35H. ELECTRIFICATION -DISTRIBUTION and LUMINAIRES-Distribution boards -lighting- power- UPS-emergencyThe detailed specifications are mentioned in the ATC documents.
36Cable management systemThe detailed specifications are mentioned in the ATC documents.
37Wires- cables- lighting- power- LAN and communicationThe detailed specifications are mentioned in the ATC documents.
38Switch-sockets and MCBsThe detailed specifications are mentioned in the ATC documents.
39Clean-room bottom-accessible LED luminairesThe detailed specifications are mentioned in the ATC documents.
40LED luminaires - grey-plenum areasThe detailed specifications are mentioned in the ATC documents.
41I. SAFETY and SURVEILLANCE SYSTEMS - Smoke detection systemThe detailed specifications are mentioned in the ATC documents.
42Electronic surveillance -CCTV- systemThe detailed specifications are mentioned in the ATC documents.
43Biometric access control systemThe detailed specifications are mentioned in the ATC documents.
44J. FURNITURE and FIXTURES - Air shower -if requiredThe detailed specifications are mentioned in the ATC documents.
45Cross-over bench with shoe rack underneathThe detailed specifications are mentioned in the ATC documents.
46Dressing cupboardThe detailed specifications are mentioned in the ATC documents.
47Dry nitrogen and water gunThe detailed specifications are mentioned in the ATC documents.
48ESD-compatible work tableThe detailed specifications are mentioned in the ATC documents.
49SS stoolsThe detailed specifications are mentioned in the ATC documents.
50Clean-room compatible chairsThe detailed specifications are mentioned in the ATC documents.
51Emergency eye wash cum safety showerThe detailed specifications are mentioned in the ATC documents.
52Shoe cover dispenserThe detailed specifications are mentioned in the ATC documents.
53K. UTILITY SYSTEMS - Air curtain at clean room entryThe detailed specifications are mentioned in the ATC documents.
54Motion sensor CCTV cablingThe detailed specifications are mentioned in the ATC documents.
55Fire alarm and smoke detector relocationThe detailed specifications are mentioned in the ATC documents.
56L. POST-INSTALLATION TESTING- VALIDATION and CERTIFICATION - Clean room - HVAC validation and performance qualificationThe detailed specifications are mentioned in the ATC documents.

AI Tender Summary

OUR REF NO 57399475
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 29-09-2026
Authority
Authority Name Department Of Electronics And Information Technology
Work Description Bids Are invited for Renovation A. Dismantling Disposal And Civil Works - Dismantling And Disposal Of Existing Facility , Civil Work - Wall Repair And Repainting , B. Clean Room Panel System Walls Ceiling And Flooring - Wall Cladding - Partition Panel System , Coving At Wall-To-Wall Wall-To-Ceiling And Floor-To-Wall Junctions , Ra Return Air Riser At Partition Base , Rcc Beam And Ceiling Cladding - Return Air Plenum Areas , False Ceiling , Esd Anti-Static Pvc Vinyl Flooring , Double-Glazed Vision - View Panels , Double-Glazed Vision - View Panels - Count , C. Doors - Clean-Room Compatible Doors General - Equipment Movement , Emergency Exit Door , Face-Biometric Access Control System At Main Entry , D. Lighting And Fixtures - Clean-Room Grade Led Light Fixtures , E. Hvac System - Ahu - Treated Fresh Air Tfa Unit - Supply Installation Testing And Commissioning , Ductwork - Gi-Aluminium- Insulated- Clean- Room Compatible , Terminal Hepa Fan Filter Units -Ffu , Exhaust Air System - Chemical Room , F. Electrical- Power- Gas And Plumbing Services - Electrical Switches - 16-5A- Wall-Mounted , Three-Phase Power Connection Points , Wiring And Fixtures , Power Backup - Dedicated Ups Port , Grounding System - Copper Strip , Gas Line - Commercial Nitrogen -N2 , Gas Line - Compressed Air , Gas Line - Blank- Spare Line , Water Chiller Inlet And Outlet Piping , Process Chilled Water -Pcw- Piping Network , Ss316 Ep Tubing For Gases With Fittings , User Utility Points -Water- Gas- Air- With Fittings , G. Building Management System -Bms- Bms - Central Monitoring Station , Direct Digital Control -Ddc- Panel , Field And Room Sensors With Cabling , Bms Integration- Programming And Validation , H. Electrification -Distribution And Luminaires- Distribution Boards -Lighting- Power- Ups-Emergency , Cable Management System , Wires- Cables- Lighting- Power- Lan And Communication , Switch-Sockets And Mcbs , Clean-Room Bottom-Accessible Led Luminaires , Led Luminaires - Grey- Plenum Areas , I. Safety And Surveillance Systems - Smoke Detection System , Electronic Surveillance -Cctv- System , Biometric Access Control System , J. Furniture And Fixtures - Air Shower -If Required , Cross-Over Bench With Shoe Rack Underneath , Dressing Cupboard , Dry Nitrogen And Water Gun , Esd-Compatible Work Table , Ss Stools , Clean-Room Compatible Chairs , Emergency Eye Wash Cum Safety Shower , Shoe Cover Dispenser , K. Utility Systems - Air Curtain At Clean Room Entry , Motion Sensor Cctv Cabling , Fire Alarm And Smoke Detector Relocation , L. Post-Installation Testing- Validation And Certification - Clean Room - Hvac Validation And Performance Qualification - A. Dismantling Disposal And Civil Works - Dismantling And Disposal Of Existing Facility - The Detailed Specifications Are Mentioned In The Atc Documents. , Civil Work - Wall Repair And Repainting - The Detailed Specifications Are Mentioned In The Atc Documents. , B. Clean Room Panel System Walls Ceiling And Flooring - Wall Cladding - Partition Panel System - The Detailed Specifications Are Mentioned In The Atc Documents. , Coving At Wall-To-Wall Wall-To-Ceiling And Floor-To-Wall Junctions - The Detailed Specifications Are Mentioned In The Atc Documents. , Ra Return Air Riser At Partition Base - The Detailed Specifications Are Mentioned In The Atc Documents. , Rcc Beam And Ceiling Cladding - Return Air Plenum Areas - The Detailed Specifications Are Mentioned In The Atc Documents. , False Ceiling - The Detailed Specifications Are Mentioned In The Atc Documents. , Esd Anti-Static Pvc Vinyl Flooring - The Detailed Specifications Are Mentioned In The Atc Documents. , Double-Glazed Vision - View Panels - The Detailed Specifications Are Mentioned In The Atc Documents. , Double-Glazed Vision - View Panels - Count - The Detailed Specifications Are Mentioned In The Atc Documents. , C. Doors - Clean-Room Compatible Doors General - Equipment Movement - The Detailed Specifications Are Mentioned In The Atc Documents. , Emergency Exit Door - The Detailed Specifications Are Mentioned In The Atc Documents. , Face-Biometric Access Control System At Main Entry - The Detailed Specifications Are Mentioned In The Atc Documents. , D. Lighting And Fixtures - Clean-Room Grade Led Light Fixtures - The Detailed Specifications Are Mentioned In The Atc Documents. , E. Hvac System - Ahu - Treated Fresh Air Tfa Unit - Supply Installation Testing And Commissioning - The Detailed Specifications Are Mentioned In The Atc Documents. , Ductwork - Gi-Aluminium- Insulated- Clean-Room Compatible - The Detailed Specifications Are Mentioned In The Atc Documents. , Terminal Hepa Fan Filter Units -Ffu - The Detailed Specifications Are Mentioned In The Atc Documents. , Exhaust Air System - Chemical Room - The Detailed Specifications Are Mentioned In The Atc Documents. , F. Electrical- Power- Gas And Plumbing Services - Electrical Switches -16-5A- Wall-Mounted - The Detailed Specifications Are Mentioned In The Atc Documents. , Three-Phase Power Connection Points - The Detailed Specifications Are Mentioned In The Atc Documents. , Wiring And Fixtures - The Detailed Specifications Are Mentioned In The Atc Documents. , Power Backup - Dedicated Ups Port - The Detailed Specifications Are Mentioned In The Atc Documents. , Grounding System - Copper Strip - The Detailed Specifications Are Mentioned In The Atc Documents. , Gas Line - Commercial Nitrogen -N2 - The Detailed Specifications Are Mentioned In The Atc Documents. , Gas Line - Compressed Air - The Detailed Specifications Are Mentioned In The Atc Documents. , Gas Line - Blank-Spare Line - The Detailed Specifications Are Mentioned In The Atc Documents. , Water Chiller Inlet And Outlet Piping - The Detailed Specifications Are Mentioned In The Atc Documents. , Process Chilled Water -Pcw- Piping Network - The Detailed Specifications Are Mentioned In The Atc Documents. , Ss316 Ep Tubing For Gases With Fittings - The Detailed Specifications Are Mentioned In The Atc Documents. , User Utility Points -Water- Gas- Air- With Fittings - The Detailed Specifications Are Mentioned In The Atc Documents. , G. Building Management System -Bms- Bms - Central Monitoring Station - The Detailed Specifications Are Mentioned In The Atc Documents. , Direct Digital Control -Ddc- Panel - The Detailed Specifications Are Mentioned In The Atc Documents. , Field And Room Sensors With Cabling - The Detailed Specifications Are Mentioned In The Atc Documents. , Bms Integration- Programming And Validation - The Detailed Specifications Are Mentioned In The Atc Documents. , H. Electrification -Distribution And Luminaires-Distribution Boards -Lighting- Power- Ups-Emergency - The Detailed Specifications Are Mentioned In The Atc Documents. , Cable Management System - The Detailed Specifications Are Mentioned In The Atc Documents. , Wires- Cables- Lighting- Power- Lan And Communication - The Detailed Specifications Are Mentioned In The Atc Documents. , Switch-Sockets And Mcbs - The Detailed Specifications Are Mentioned In The Atc Documents. , Clean-Room Bottom-Accessible Led Luminaires - The Detailed Specifications Are Mentioned In The Atc Documents. , Led Luminaires - Grey-Plenum Areas - The Detailed Specifications Are Mentioned In The Atc Documents. , I. Safety And Surveillance Systems - Smoke Detection System - The Detailed Specifications Are Mentioned In The Atc Documents. , Electronic Surveillance -Cctv- System - The Detailed Specifications Are Mentioned In The Atc Documents. , Biometric Access Control System - The Detailed Specifications Are Mentioned In The Atc Documents. , J. Furniture And Fixtures - Air Shower -If Required - The Detailed Specifications Are Mentioned In The Atc Documents. , Cross-Over Bench With Shoe Rack Underneath - The Detailed Specifications Are Mentioned In The Atc Documents. , Dressing Cupboard - The Detailed Specifications Are Mentioned In The Atc Documents. , Dry Nitrogen And Water Gun - The Detailed Specifications Are Mentioned In The Atc Documents. , Esd-Compatible Work Table - The Detailed Specifications Are Mentioned In The Atc Documents. , Ss Stools - The Detailed Specifications Are Mentioned In The Atc Documents. , Clean-Room Compatible Chairs - The Detailed Specifications Are Mentioned In The Atc Documents. , Emergency Eye Wash Cum Safety Shower - The Detailed Specifications Are Mentioned In The Atc Documents. , Shoe Cover Dispenser - The Detailed Specifications Are Mentioned In The Atc Documents. , K. Utility Systems - Air Curtain At Clean Room Entry - The Detailed Specifications Are Mentioned In The Atc Documents. , Motion Sensor Cctv Cabling - The Detailed Specifications Are Mentioned In The Atc Documents. , Fire Alarm And Smoke Detector Relocation - The Detailed Specifications Are Mentioned In The Atc Documents. , L. Post-Installation Testing- Validation And Certification - Clean Room - Hvac Validation And Performance Qualification - The Detailed Specifications Are Mentioned In The Atc Documents.
Basic Detail
Tender No GEM/2026/B/8003567
Bidding Type Tender
Location
City Mumbai Suburban
State Maharashtra
Key Dates
Publish Date 08 Sep 2026
Submission Date 29 Sep 2026
Open Date 30 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5 Lakhs
Exemption Available
Document List
74d0c9ee-0b1d-43d1-88a0-083faf23dfad.pdf
1788761103.xlsx
gn032tech_2026-09-07-11-17-22_3a9ec835e01359b4bf1f09614d3bb874.pdf
9855032_Boq_1.xlsx
GN32TECH_00ab8bb0-22c6-40e1-9ee11788849610436_msj_sam_mum.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 29, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Sep 30, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
pdf

74d0c9ee-0b1d-43d1-88a0-083faf23dfad.pdf

xlsx

1788761103.xlsx

pdf

gn032tech_2026-09-07-11-17-22_3a9ec835e01359b4bf1f09614d3bb874.pdf

xlsx

9855032_Boq_1.xlsx

pdf

GN32TECH_00ab8bb0-22c6-40e1-9ee11788849610436_msj_sam_mum.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders