Tender For Shifting Of Electrical Infrastructure For Road Widening Work Of Khatkhatia-Baulasingha Road By (R&B) Division, Boudh Under Manamunda Electrical Section On 6% Deposit Norm
Tender Value
49.11 Lakhs
Estimated cost
Bid Submission
18 Sep 2026
5 days left
EMD
49200
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Boudh → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting Of Electrical Infrastructure For Road Widening Work Of Khatkhatia-Baulasingha Road By (R&B) Division, Boudh Under Manamunda Electrical Section On 6% Deposit Norm
BOQ
| Sl. No. | Item Description |
| 1 | PART -1: CONSTRUCTION OF 11 KV WIH 55 SQMM AAA CONDUCTOR OF 0.04 KM WITH 11 MTR & 13 MTR WPB POLE AS INTERPOSING POLE AT E'-F' & K'-J' & L'-M' AS IN SLD 1WPB POLE 160X152 13 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 2 | WPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 3 | EARTHING SUPPORT COIL TYPE |
| 4 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 5 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 6 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 7 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 8 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 9 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 10 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 11 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 12 | 11 KV F CLAMP (GI) |
| 13 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 14 | HT CROSS ARM V SHAPE FOR 33 KV GI-20 KG |
| 15 | 33 KV BACK CLAMP FOR V CROSS ARM |
| 16 | 33 KV F CLAMP GI |
| 17 | 33 KV POLE TOP BRACKET GI |
| 18 | 33 KV ,10 KN ,POLYMERIC PIN INSULATOR |
| 19 | 55 SQMM AAA CONDUCTOR |
| 20 | HT STAY SET COMPLETE |
| 21 | HT SATY INSULATOR |
| 22 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 23 | 7/10 GI STAY WIRE |
| 24 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 25 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 26 | DANGER BOARD |
| 27 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 28 | GI NUTS BOLTS AND WASHERS |
| 29 | BLACK PAINT |
| 30 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 31 | SUNDRIES |
| 32 | PART-2: ROAD CROSS GAURDING 02 NO FOR 11 KVGAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 33 | BACK CLAMP FOR GAURDING CROSS ARM |
| 34 | EYE HOOK FOR CRADLE GUARD |
| 35 | NO-6,N0-8,NO-10 GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 36 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 37 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 38 | GI NUTS,BOLTS ,WASHER |
| 39 | HT STAY SET COMPLETE |
| 40 | HT STAY INSULATOR |
| 41 | HT STAY CLAMP(1.95KG/MTR) |
| 42 | 7/10 SWG STAY WIRE |
| 43 | PART-3: ROAD CROSS GAURDING 01 NO FOR 33 KVGAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 2 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 44 | BACK CLAMP FOR GAURDING CROSS ARM |
| 45 | EYE HOOK FOR CRADLE GUARD |
| 46 | NO-6,N0-8 GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 47 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 48 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 49 | GI NUTS,BOLTS ,WASHER |
| 50 | HT STAY SET COMPLETE |
| 51 | HT STAY INSULATOR |
| 52 | HT STAY CLAMP(1.95KG/MTR) |
| 53 | 7/8 SWG STAY WIRE |
| 54 | PART -4: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25+1X16) SQMM AB CABLE OF 0.17 KM(a-b-c & c'-d') AS SHOWN IN SLD & (1X35+1X25) SM AB CABLE OF0.02 KM AS SHOWN IN SLD9 MTR LOG 300 KG PSC POLE |
| 55 | RCC BASE PLATE |
| 56 | EARTHING SUPPORT COIL TYPE |
| 57 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 58 | LT STAY SET COMPLETE |
| 59 | LT STAY INSULATOR |
| 60 | LT STAY CLAMP |
| 61 | 7/12 SWG STAY WIRE |
| 62 | 3X35+1X25+1X16 SQMM AB CABLE |
| 63 | 1X35+1X25 SQMM AB CABLE |
| 64 | POLE CLAMP FOR EYE HOOK |
| 65 | DEAD END CLAMP FOR EYE HOOK |
| 66 | SUSPENSION CLAMP WITH EYE HOOK |
| 67 | GI NUTS BOLTS AND WASHERS |
| 68 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 69 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 70 | DANGER BOARD |
| 71 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 72 | BLACK PAINT |
| 73 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 74 | SUNDRIES |
| 75 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 13 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.55 CUM |
| 76 | CONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 77 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 78 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 79 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 80 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 81 | DISMANTLING OF 11/13 MTR WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 82 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 83 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 84 | PART -1: CONSTRUCTION OF 11 KV WIH 55 SQMM AAA CONDUCTOR OF 0.04 KM WITH 11 MTR AS INTERPOSING POLE AT (K'-L'), (M'-M\\") AS SHOWN IN SLD 1WPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 85 | EARTHING SUPPORT COIL TYPE |
| 86 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 87 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 88 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 89 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 90 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 91 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 92 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 93 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 94 | 11 KV F CLAMP (GI) |
| 95 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 96 | 55 SQMM AAA CONDUCTOR |
| 97 | HT STAY SET COMPLETE |
| 98 | HT SATY INSULATOR |
| 99 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 100 | 7/10 GI STAY WIRE |
| 101 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 102 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 103 | DANGER BOARD |
| 104 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 105 | GI NUTS BOLTS AND WASHERS |
| 106 | BLACK PAINT |
| 107 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 108 | SUNDRIES |
| 109 | PART-2: ROAD CROSS GAURDING 02 NOSGAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 110 | BACK CLAMP FOR GAURDING CROSS ARM |
| 111 | EYE HOOK FOR CRADLE GUARD |
| 112 | NO-6,N0-8,NO-10 GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 113 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 114 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 115 | GI NUTS,BOLTS ,WASHER |
| 116 | HT STAY SET COMPLETE |
| 117 | HT STAY INSULATOR |
| 118 | HT STAY CLAMP(1.95KG/MTR) |
| 119 | 7/10 SWG STAY WIRE |
| 120 | PART -3: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25+1X16) SQMM AB CABLE OF 0.75 KM WITH 10 MTR PSC POLE 2 NOS AS INTERPOSING POLE AS SHOWN IN SLD AT POINT N'-O'150X150 MM RS JOIST 10 MTR LONG 34.6 KG/MTR EACH 346 KG |
| 121 | 9 MTR LONG 300 KG PSC POLE |
| 122 | RCC BASE PLATE |
| 123 | EARTHING SUPPORT COIL TYPE |
| 124 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 125 | POLE CLAMP FOR EYE HOOK |
| 126 | DEAD END CLAMP FOR EYE HOOK |
| 127 | SUSPENSION CLAMP WITH EYE HOOK |
| 128 | 3X35+1X25+1X16 SQMM AB CABLE |
| 129 | LT STAY SET COMPLETE |
| 130 | LT STAY INSULATOR |
| 131 | LT STAY CLAMP |
| 132 | 7/12 SWG STAY WIRE |
| 133 | GI NUTS BOLTS AND WASHERS |
| 134 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 135 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 136 | DANGER BOARD |
| 137 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 138 | BLACK PAINT |
| 139 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 140 | SUNDRIES |
| 141 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 142 | CONCRETING OF 10 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.415 CUM |
| 143 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 144 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 145 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 146 | MATERIALS FOR MASONARY WORK FOEARTH PIT CHARCOAL SALT ETC FOR EARTHING |
| 147 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 148 | DISMANTLING OF 11/13 MTR WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 149 | DISMANTLING OF 9/11 MTR JOIST WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 150 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 151 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 152 | DISMANTLE STEEL STRUCTURE O LINES &SUBSTATION |
| 153 | PART -1: CONSTRUCTION OF 11 KV WIH 55 SQMM AAA CONDUCTOR OF 0.16 KM WITH 11 MTR & 13 MTR WPB POLE AS INTERPOSING POLE AT (E'-E\\",M'-N')& (F-J'-G'-H'-I) AS SHOWN IN SLD 3WPB POLE 160X152 13 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 154 | WPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 155 | EARTHING SUPPORT COIL TYPE |
| 156 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 157 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 158 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 159 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 160 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 161 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 162 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 163 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 164 | 11 KV F CLAMP (GI) |
| 165 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 166 | 55 SQMM AAA CONDUCTOR |
| 167 | HT STAY SET COMPLETE |
| 168 | HT SATY INSULATOR |
| 169 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 170 | 7/10 GI STAY WIRE |
| 171 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 172 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 173 | DANGER BOARD |
| 174 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 175 | GI NUTS BOLTS AND WASHERS |
| 176 | BLACK PAINT |
| 177 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 178 | SUNDRIES |
| 179 | PART-2: ROAD CROSS GAURDING 04 NOSGAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 180 | BACK CLAMP FOR GAURDING CROSS ARM |
| 181 | EYE HOOK FOR CRADLE GUARD |
| 182 | NO-6,N0-8, GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 183 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 184 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 185 | GI NUTS,BOLTS ,WASHER |
| 186 | HT STAY SET COMPLETE |
| 187 | HT STAY INSULATOR |
| 188 | HT STAY CLAMP(1.95KG/MTR) |
| 189 | 7/10 SWG STAY WIRE |
| 190 | PART -3: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25+1X16) SQMM AB CABLE OF 0.025 KM(K'-L') AS SHOWN IN SLD & (1X35+1X25) SQMM AB CABLE OF 0.06 KM AS SHOWN IN SLD(O'-Q'-P')9 MTR LOG 300 KG PSC POLE |
| 191 | RCC BASE PLATE |
| 192 | EARTHING SUPPORT COIL TYPE |
| 193 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 194 | LT STAY SET COMPLETE |
| 195 | LT STAY INSULATOR |
| 196 | LT STAY CLAMP |
| 197 | 7/12 SWG STAY WIRE |
| 198 | 3X35+1X25+1X16 SQMM AB CABLE |
| 199 | 1X35+1X25 SQMM AB CABLE |
| 200 | POLE CLAMP FOR EYE HOOK |
| 201 | DEAD END CLAMP FOR EYE HOOK |
| 202 | SUSPENSION CLAMP WITH EYE HOOK |
| 203 | GI NUTS BOLTS AND WASHERS |
| 204 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 205 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 206 | DANGER BOARD |
| 207 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 208 | BLACK PAINT |
| 209 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 210 | SUNDRIES |
| 211 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 13 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.55 CUM |
| 212 | CONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 213 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 214 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 215 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 216 | MATERIALS FOR MASONARY WORK FOEARTH PIT CHARCOAL SALT ETC FOR EARTHING |
| 217 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 218 | DISMANTLING OF 11/13 MTR WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 219 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 220 | DIAMANTLING OFACSR/AAAC 3455 SQMM FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 221 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 222 | DISMANTLE STEEL STRUCTURE O LINES &SUBSTATION |
| 223 | PART -1: CONSTRUCTION OF 11 KV WIH 55 SQMM AAA CONDUCTOR OF 0.06 KM WITH 11 MTR & 13 MTR WPB POLE AS INTERPOSING POLE AT (A-B\\",C'-D',E'-E\\") AS SHOWN IN SLD 4WPB POLE 160X152 13 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 224 | WPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 225 | EARTHING SUPPORT COIL TYPE |
| 226 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 227 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 228 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 229 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 230 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 231 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 232 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 233 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 234 | 11 KV F CLAMP (GI) |
| 235 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 236 | 55 SQMM AAA CONDUCTOR |
| 237 | HT STAY SET COMPLETE |
| 238 | HT SATY INSULATOR |
| 239 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 240 | 7/10 GI STAY WIRE |
| 241 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 242 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 243 | DANGER BOARD |
| 244 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 245 | GI NUTS BOLTS AND WASHERS |
| 246 | BLACK PAINT |
| 247 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 248 | SUNDRIES |
| 249 | PART-2: ROAD CROSS GAURDING 03 NOSGAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 250 | BACK CLAMP FOR GAURDING CROSS ARM |
| 251 | EYE HOOK FOR CRADLE GUARD |
| 252 | NO-6,N0-8, GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 253 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 254 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 255 | GI NUTS,BOLTS ,WASHER |
| 256 | HT STAY SET COMPLETE |
| 257 | HT STAY INSULATOR |
| 258 | HT STAY CLAMP(1.95KG/MTR) |
| 259 | 7/10 SWG STAY WIRE |
| 260 | PART-3: CONTRUCTION OF 400 A LINE AB SWITCH 01 SETWPB 160X152 (30.44 KG/MTR) 11 MTR WITH BASE PLATE |
| 261 | EARTHING COLL SUPPORT |
| 262 | TOP PRESSURE GI CHANNEL 100X50X6 MM EACH 2.8 MTR LONG 2 NOS (@9.2 KG/MTR) |
| 263 | GI CHANNEL FOR SUPRTING DP ARM75X40X6.28 MTR LONG 2 6.8 KG/MTR |
| 264 | BRACING ANGLE 50X50X6 MM GI ANGLE 4 MTR LONG 2 NOS 4.5 KG/MTR |
| 265 | 11 KV 70 KN DISC INSULATOR (B&S) POLYMER |
| 266 | HARD WARE FITTINGS B&S TYPE 70KN (3 BOLTED) |
| 267 | PG CLAMP /WEDGE CONNECTOR FOR 55 SQMM AAA CONDUCTOR |
| 268 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .280 MTR LENGTH |
| 269 | 11 KV 5 KN PIN INSULATOR POLYMER |
| 270 | HT STAY SET COMPLETE |
| 271 | HT STAY INSULATOR |
| 272 | HT STAY CLAMP FRO PSC POLE (1.95KG/MTR) |
| 273 | 7/10 SWG STAY WIRE |
| 274 | 55 SQMM AAA CONDUCTOR |
| 275 | AB SWITCH MOUNTING CHANNEL GI ,75X40X6 MM 2.8 MTR 2 NOS 6.8 KG/MTR |
| 276 | AB SWITCH SIDE SUPPORT CHANNEL 100X50X6 MM 9.2 KG/MTR EACH CHANNEL LENGTH 0.35 MTR 2 NOS CHANNEL REQUIRED |
| 277 | CHANNEL SUPPORT FOR DOWNPIPE 75X40X6 MM 6.8 KG/MTR EACH CHANNEL NGTH 0.8 MTR 1 NO CHANNEL REQUIRED |
| 278 | 11 KV AB SWITCH 3 POLE 400A Hz |
| 279 | 12 KV 10 KA STATIO CLASS CL-II WITH OUT SURGE COUNTER |
| 280 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 281 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 282 | DANGER BOARD |
| 283 | BACK CLAMP FOR DANGER BOARD 25X3 MM FLAT 0.59 KG/MTR FLAT OF 0.510 MTR LENGTH FOR EACH BACK CLAMP |
| 284 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 285 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) 4 PC/SUPPORT |
| 286 | GI, NUTS, BOLTS & WASHER |
| 287 | BLACK PAINT |
| 288 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 289 | SUNDRIES |
| 290 | PART -4: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25+1X16) SQMM AB CABLE OF 0.62 KM(F'-G'-J\\") & (K-L'-')AS SHOWN IN SLD9 MTR LOG 300 KG PSC POLE |
| 291 | RCC BASE PLATE |
| 292 | EARTHING SUPPORT COIL TYPE |
| 293 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 294 | LT STAY SET COMPLETE |
| 295 | LT STAY INSULATOR |
| 296 | LT STAY CLAMP |
| 297 | 7/12 SWG STAY WIRE |
| 298 | 3X35+1X25+1X16 SQMM AB CABLE |
| 299 | POLE CLAMP FOR EYE HOOK |
| 300 | DEAD END CLAMP FOR EYE HOOK |
| 301 | SUSPENSION CLAMP WITH EYE HOOK |
| 302 | GI NUTS BOLTS AND WASHERS |
| 303 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 304 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 305 | DANGER BOARD |
| 306 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 307 | BLACK PAINT |
| 308 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 309 | SUNDRIES |
| 310 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 13 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.55 CUM |
| 311 | CONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 312 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 313 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 314 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 315 | MATERIALS FOR MASONARY WORK FOEARTH PIT CHARCOAL SALT ETC FOR EARTHING SIZE 2\\"X2\\" AND RCC SLAB COVER |
| 316 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 317 | DISMANTLING OF 11/13 MTR WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 318 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 319 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 320 | DISMANTLING OF 11 KV /33 KV/ GO/AB SWITCH /ISOLATOR/DD FUSE/USE SET INCLUDING REMOVAL OF ALL ELECTRIC /EARTH CONNECTIONS LOADING,TRANSPORTATION,UNLOADING AND STAKING AT A PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 321 | DISMANTLE STEEL STRUCTURE O LINES &SUBSTATION |
| 322 | PART -1: INSTALLATION OF 13 MTR WPB POLE 02 NOS AS MENTIONED IN SLD (I'&J')& 11 MTR WPB POLE AS INTERPOSING POLE 10 OS AT (C'-D',G'-H',K'-L',N'-O',P'-Q') AS SHOWN IN SLD 5WPB POLE 160X152 13 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 323 | WPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 324 | EARTHING SUPPORT COIL TYPE |
| 325 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 326 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 327 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 328 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 329 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 330 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 331 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 332 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 333 | 11 KV F CLAMP (GI) |
| 334 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 335 | 55 SQMM AAA CONDUCTOR |
| 336 | HT STAY SET COMPLETE |
| 337 | HT SATY INSULATOR |
| 338 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 339 | 7/10 GI STAY WIRE |
| 340 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 341 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 342 | DANGER BOARD |
| 343 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 344 | GI NUTS BOLTS AND WASHERS |
| 345 | BLACK PAINT |
| 346 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 347 | SUNDRIES |
| 348 | PART-2: ROAD CROSS GAURDING 06 NOSGAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 349 | BACK CLAMP FOR GAURDING CROSS ARM |
| 350 | EYE HOOK FOR CRADLE GUARD |
| 351 | NO-6,N0-8, GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 352 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 353 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 354 | GI NUTS,BOLTS ,WASHER |
| 355 | HT STAY SET COMPLETE |
| 356 | HT STAY INSULATOR |
| 357 | HT STAY CLAMP(1.95KG/MTR) |
| 358 | 7/10 SWG STAY WIRE |
| 359 | PART-3: CONTRUCTION OF 25 KVA ,11/0.4 KV DP MOUNTED SUBSTATION W/O DTR (TO BE HANDED OVER TO TPSODL)-01 NO9 MTR LOG 300 KG PSC POLE |
| 360 | RCC BASE PLATE |
| 361 | EARTHING COLL SUPPORT |
| 362 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 363 | TOP PRESSURE GI CHANNEL 100X50X6 MM EACH 2.8 MTR LONG 2 NOS (@9.2 KG/MTR) |
| 364 | TRANSFORMER MOUNTING GI CHANNEL 100X50X6 MM CHANNEL EACH 2.8 MTR LONG 2 NOS @9.2 KG/MTR |
| 365 | AB SWITCH & HG FUSE, MOUNTING GI CHANNEL 75X40X6 MM 2.8 MTR LONG 4 NOS @6.8 KG/MTR |
| 366 | CANTILEVER GI CHANNEL FOR SUPPORTING AB SWITCH ARM 75X40X6 MM 1 MTR LONG 2 NOS 6.8 KG/MTR |
| 367 | CANTILEVER ANGLE FOR SUPPORTING AB SWITCH 50X50X6 MM GI ANGLE 1 MTR LONG 2 NOS @4.5 KG/MTR |
| 368 | TRANSFORMER BELTING GI ANGLE 50X50X6 MM 2.8 MTR LONG 2 NOS @4.5 KG/MTR WITH SIDE ANGLE TOTAL 7 MTR |
| 369 | ANGLE FOR MOUNTING LT DISTRIBUTION BOX 50X50X6 MM GI ANGLE 1 MTR EACH LONG 2 NOS @4.5 KG/MTR |
| 370 | AB SWITCH SIDE SUPPORT CHANNEL 100X50X6 MM 9.2 KG/MTR EACH CHANNEL LENGTH 0.35 MTR 2 NOS CHANNEL REQUIRED |
| 371 | CHANNEL SUPPORT FOR DOWNPIPE 75X40X6 MM 6.8 KG/MTR EACH CHANNEL NGTH 0.8 MTR 1 NO CHANNEL REQUIRED |
| 372 | 11 KV 70 KN DISC INSULATOR (B&S) POLYMER |
| 373 | HARD WARE FITTINGS B&S TYPE 70KN (3 BOLTED) |
| 374 | 11 KV 200 A 3 POLE AB SWITCH |
| 375 | 11 KV 200A 3 POLE HG FUSE |
| 376 | 12 KV 10 KA STATIO CLASS CL-II WITH OUT SURGE COUNTER |
| 377 | HT STAY SET COMPLETE |
| 378 | HT STAY INSULATOR |
| 379 | HT STAY CLAMP FRO PSC POLE (1.95KG/MTR) |
| 380 | 7/10 SWG STAY WIRE |
| 381 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 382 | 25X4 MM GI FLAT OR NEUTRAL |
| 383 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 384 | 55 SQMM AAA CONDUCTOR |
| 385 | PG CLAMP /WEDGE CONNECTOR FOR 55 SQMM AAA CONDUCTOR |
| 386 | GI, NUTS, BOLTS & WASHER |
| 387 | LT DISTRIBUTION BOX GI FOR 25 KVA SUBSTATION |
| 388 | 1.1 KV AL 1CX50 SQMM XLPE UNARMOURED 4 NOS 10 MTR EACH |
| 389 | DANGER BOARD |
| 390 | BACK CLAMP FOR DANGER BOARD 25X3 MM FLAT 0.59 KG/MTR FLAT OF 0.510 MTR LENGTH FOR EACH BACK CLAMP |
| 391 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 392 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) 4 PC/SUPPORT |
| 393 | BLACK PAINT |
| 394 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 395 | SUNDRIES |
| 396 | PART -4: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25) SQMM AB CABLE OF 0.04 KM(A'-E'-F) AS SHOWN IN SLD9 MTR LOG 300 KG PSC POLE |
| 397 | RCC BASE PLATE |
| 398 | EARTHING SUPPORT COIL TYPE |
| 399 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 400 | LT STAY SET COMPLETE |
| 401 | LT STAY INSULATOR |
| 402 | LT STAY CLAMP |
| 403 | 7/12 SWG STAY WIRE |
| 404 | 3X35+1X25 SQMM AB CABLE |
| 405 | POLE CLAMP FOR EYE HOOK |
| 406 | DEAD END CLAMP FOR EYE HOOK |
| 407 | SUSPENSION CLAMP WITH EYE HOOK |
| 408 | GI NUTS BOLTS AND WASHERS |
| 409 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 410 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 411 | DANGER BOARD |
| 412 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 413 | BLACK PAINT |
| 414 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 415 | SUNDRIES |
| 416 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 13 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.55 CUM |
| 417 | CONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 418 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 419 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 420 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 421 | MATERIALS FOR MASONARY WORK FOEARTH PIT CHARCOAL SALT ETC FOR EARTHING SIZE 2\\"X2\\" AND RCC SLAB COVER |
| 422 | CONSTRUCTION F BOUDARY WALL ,BOUNDARY FOR FENCING OF DPM S/ THE SIZE OF 3X3 MTR @7300.12 /RM CONSIDERING HEIGHT ABOVE THE GROUND LEVEL -1.65 MTR & BELOW GROUND DEPTH 1.2 MTR INCLUDING THE COST OF FABRICATION,INSTALLATIONOF MS GATE (1.5X1.65) AS PER MAIL RECEIVED FROM NEP. |
| 423 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 424 | DISMANTLING OF 11/13 MTR WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 425 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 426 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 427 | DISMANTLING OF EXISTING 11/0.4 KV ,33/0.4 KV THREE PHASE DISTRIBUTION TRANSFORMER 25 KVA INCLUDING REMOVAL OF HT/LT LEADS,EARTH CONNECTIONS AND UNLOADING BY CRANE IF REQUIRED. SCOPE OF WORK ALSO INCLUDES LOADING,TRANSPORTATION,UNLOADING AND STAKING AT A PROPER PLACE IN SAFE POSITION /SITE STORE. |
| 428 | DISMANTLE STEEL STRUCTURE O LINES &SUBSTATION |
| 429 | PART -1: INSTATION OF 11 MTR WPB POLE AS INTERPOSING POLE 02 OS AT (F'-G') AS SHOWN IN SLD 6 WITH 55 SQMM AAA CONDUCTORWPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 430 | EARTHING SUPPORT COIL TYPE |
| 431 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 432 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 433 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 434 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 435 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 436 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 437 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 438 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 439 | 11 KV F CLAMP (GI) |
| 440 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 441 | 55 SQMM AAA CONDUCTOR |
| 442 | HT STAY SET COMPLETE |
| 443 | HT SATY INSULATOR |
| 444 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 445 | 7/10 GI STAY WIRE |
| 446 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 447 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 448 | DANGER BOARD |
| 449 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 450 | GI NUTS BOLTS AND WASHERS |
| 451 | BLACK PAINT |
| 452 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 453 | SUNDRIES |
| 454 | PART-2: ROAD CROSS GAURDING 01 NO AS SHOWN IN SLD 6 FROM(F'-G')GAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 455 | BACK CLAMP FOR GAURDING CROSS ARM |
| 456 | EYE HOOK FOR CRADLE GUARD |
| 457 | NO-6,N0-8, GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 458 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 459 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 460 | GI NUTS,BOLTS ,WASHER |
| 461 | HT STAY SET COMPLETE |
| 462 | HT STAY INSULATOR |
| 463 | HT STAY CLAMP(1.95KG/MTR) |
| 464 | 7/10 SWG STAY WIRE |
| 465 | PART -4: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25+1X16) SQMM AB CABLE OF 0.65 KM(I'-J'-K'-L'-N'-O') & (1X35+1X25) SQMM AB CABLE OF 0.12 KM (A-B'-C'-D'-E)AS SHOWN IN SLD 69 MTR LOG 300 KG PSC POLE |
| 466 | RCC BASE PLATE |
| 467 | EARTHING SUPPORT COIL TYPE |
| 468 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 469 | LT STAY SET COMPLETE |
| 470 | LT STAY INSULATOR |
| 471 | LT STAY CLAMP |
| 472 | 7/12 SWG STAY WIRE |
| 473 | (3X35+1X25+1X16) SQMM XLPE AB CABLE |
| 474 | 3X35+1X25 SQMM XLPE AB CABLE |
| 475 | POLE CLAMP FOR EYE HOOK |
| 476 | DEAD END CLAMP FOR EYE HOOK |
| 477 | SUSPENSION CLAMP WITH EYE HOOK |
| 478 | GI NUTS BOLTS AND WASHERS |
| 479 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 480 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 481 | DANGER BOARD |
| 482 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 483 | BLACK PAINT |
| 484 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 485 | SUNDRIES |
| 486 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 487 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 488 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 489 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 490 | MATERIALS FOR MASONARY WORK FOEARTH PIT CHARCOAL SALT ETC FOR EARTHING SIZE 2\\"X2\\" AND RCC SLAB COVER |
| 491 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 492 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 493 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 494 | PART -1: INSTATION OF 13 MTR WPB POLE 04 NOS AS MENTIONED IN SLD (A',B' & C',D') & 11 MTR WPB POLE AS INTERPOSING POLE 02 OS AT (L'-M') AS SHOWN IN SLD 7WPB POLE 160X152 13 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 495 | WPB POLE 160X152 11 MTR LONG (30.44 KG/MT) GI WITH BASE PLATE & STIFFNER (10.74 KG) |
| 496 | EARTHING SUPPORT COIL TYPE |
| 497 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 498 | 100X50X6 MM CHANNEL FOR STRAIGHT CROSS ARM 1.2 MTR EACH 6 NOS & 0.2 MTR LONG 6 NOS 02 NOS CP |
| 499 | DISC INSULATOR (B&S) 70 KN POLYMER |
| 500 | HW FITTING (B&S) 70 KN 3 BOLTED |
| 501 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 502 | FISH PLATE 50X8 MM 3.14 KG/MTR EACH .28 MTR LENGTH |
| 503 | HT CROSS ARM V SHAPE FOR 11 KV GI-10.5KG |
| 504 | 11 KV BACK CLAMP FOR V CROSS ARM (GI) |
| 505 | 11 KV F CLAMP (GI) |
| 506 | 11 KV 5KN POLYMERIC PIN INSULATOR |
| 507 | 55 SQMM AAA CONDUCTOR |
| 508 | HT STAY SET COMPLETE |
| 509 | HT SATY INSULATOR |
| 510 | HT STAY CLAMP GI(1.9 KG/PAIR) |
| 511 | 7/10 GI STAY WIRE |
| 512 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 513 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 514 | DANGER BOARD |
| 515 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 516 | GI NUTS BOLTS AND WASHERS |
| 517 | BLACK PAINT |
| 518 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 519 | SUNDRIES |
| 520 | PART-2: ROAD CROSS GAURDING 03 NO AS SHOWN IN SLD7GAURDING CROSS ARM OF 75X40X6 MM GI CHANNEL 1.5 MTR LONG 2 NOS @ 6.8 KG/MTR FOR SP ROAD CROSS GAURDING |
| 521 | BACK CLAMP FOR GAURDING CROSS ARM |
| 522 | EYE HOOK FOR CRADLE GUARD |
| 523 | NO-6,N0-8, GI WIRE (DIA 4.8 MM) FOR GAURDING |
| 524 | 25X6 MM GI FLAT FOR EARTHING 1.2 KG/MTR |
| 525 | 40 MM NOMINAL BORE GI PIPE (MEDIUM GAUGE) EARTHING DEVICE WITH 3 MTR LONG |
| 526 | GI NUTS,BOLTS ,WASHER |
| 527 | HT STAY SET COMPLETE |
| 528 | HT STAY INSULATOR |
| 529 | HT STAY CLAMP(1.95KG/MTR) |
| 530 | 7/10 SWG STAY WIRE |
| 531 | PART -3: CONSTRUCTION OF LT OH LINE WITH (3X35+1X25+1X16) SQMM AB CABLE OF 0.36 KM(G'-H'-I'-J'-K') ON 9 MTR PSC POLE SUPPORT AS SHOWN IN SLD 79 MTR LOG 300 KG PSC POLE |
| 532 | RCC BASE PLATE |
| 533 | EARTHING SUPPORT COIL TYPE |
| 534 | NO-8 GI WIRE (DIA 4.6MM) 0.131 KG/MTR 2 MTR FOR CONNECTING POLE WITH COIL EARTHING |
| 535 | LT STAY SET COMPLETE |
| 536 | LT STAY INSULATOR |
| 537 | LT STAY CLAMP |
| 538 | 7/12 SWG STAY WIRE |
| 539 | (3X35+1X25+1X16) SQMM XLPE AB CABLE |
| 540 | POLE CLAMP FOR EYE HOOK |
| 541 | DEAD END CLAMP FOR EYE HOOK |
| 542 | SUSPENSION CLAMP WITH EYE HOOK |
| 543 | GI NUTS BOLTS AND WASHERS |
| 544 | ANTICLIMBING DEVICE (GI BARBED WIRE 3 KG PER SUPPORT) |
| 545 | BACK CLAMP FOR ACD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 546 | DANGER BOARD |
| 547 | BACK CLAMP FOR DANGER BOARD (25X3 MM GI EARTH FLAT 0.59 KG/MTR & 0.51 MTR FOR EACH BACK CLAMP) |
| 548 | BLACK PAINT |
| 549 | YELLOW COLOUR PAINT FOR BACKGROUND |
| 550 | SUNDRIES |
| 551 | CIVIL WORK & DISMANTLING OF SERVICESCONCRETING OF 13 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.55 CUM |
| 552 | CONCRETING OF 11 MTR WPB POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.45 CUM |
| 553 | CONCRETING OF 9/8 MTR PSC POLE IN RATIO 1:1.5:3 =500MMX500MMX1500MM=0.375 CUM |
| 554 | COUPING OF POLES IN RATI 1:1.5:3=0.1125 CUM @6648.85 =0.1125X6648.85=RS 748.00 |
| 555 | STAY/STUD CONCRETING IN RATIO 1:2:4 AS PER TPSODL SPECIFICATION AND DRAWING =0.2 CUM @6648.85=0.2X6648.85=RS.1329.77 |
| 556 | MATERIALS FOR MASONARY WORK FOEARTH PIT CHARCOAL SALT ETC FOR EARTHING SIZE 2\\"X2\\" AND RCC SLAB COVER |
| 557 | SURVEY OF INCREMENTAL/DELTA NETWORK AND ASSETS CHANGES OF 11 KV & LT NETWORK AND UPDATION IN GESW DATABASE |
| 558 | DISMANTLING OF 11/13 MTR WPB POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 559 | DISMANTLING OF 9/8 MTR PSC POLE (SERVICABLE POLE AFTER DIGGING THE PIT AND TAKING OUT THE POLE ,TRANSPORTATION AND STACKING THE POLE AT A PROPER PLACE IN SAFE POSITION WITH IN 10 KM /SITE STORE AND REFILLING THE PIT WITH LOOSE EARTH AND RAMMING INCLUDING REMOVAL AND DISPOSAL OF MALBA AT PROPER LOCATION AS PER INSTRUCTION OF EIC |
| 560 | DIAMANTLING OF VARIOUS SIZE OF LT AB CABLE FROM OVER HEAD LINE ,RECOILING,LOADING TRANSPORTATION,UNLOADING AND STAKING AT PROPER PLACE IN SAFE POSITION/BA SITE STORE |
| 561 | DISMANTLE STEEL STRUCTURE O LINES &SUBSTATIONN:B : Salvage value @8% to be deducted from the contractor's bill. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 08, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysSep 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender