Tender For Construction Of Subeha Chakaura Road To Dhafalpur Link Road.
Tender Value
1.09 Crore
Estimated cost
Bid Submission
15 Sep 2026
2 days left
EMD
7.45 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Barabanki → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Subeha Chakaura Road To Dhafalpur Link Road.
BOQ
| Sl. No. | Item Description |
| 1 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with a all lifts and leads, transporting to site. Spreading, grading to required slpoe and compacting to meet required of table 300.1 and 300.2 as per Technical specification clause 303.1 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405 |
| 5 | Construction of un-reinforced, dowel jointed, at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.20 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plats including leveling the formwork as drawing), spreading the concrete with shovels, rakes, compacted using needls, screed and plate vibrators and finshed in contunuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approadch to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14days curing compound(where specified) and water finishing to lines and grades as per drawing and Techincal specification clause 1501. |
| 6 | Excavation in foundation in ordinary soil including lift up to 1.50 m. lead upto 30 m. and including filling ,watering and ramming of excavated earth in to the trenches of foundation and disposal of surplus earth as directed by Engineer in charge. BBK SOR CH.-4, Item no. 251 |
| 7 | Providing and laying cement concrete in 1:4:8 (1 cement: 4 fine sand : 8 graded brick aggregate of 40 mm nominal size ) and curing complete, including supply of materials , T & P required for proper completion of work as per direction of Engineer in char |
| 8 | First class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of materials T & P required for proper completion of work as per direction of Engineer in charge. BBK SOR CH.-6, Item no. 307a |
| 9 | Providing and laying of 600mm dia hume pipe with collar in position including supply of materials , T & P required for proper completion of work as per direction of Engineer in charge. |
| 10 | Providing and laying of 350mm dia hume pipe with collar in position including supply of materials , T & P required for proper completion of work as per direction of Engineer in charge. |
| 11 | Struck cement pointing on brick work with 1 :3 cement mortar ( 1 cement : 3 fine sand ) including supply of materials , T & P required for proper completion of work as per direction of Engineer in charge. LKO SOR CH.-15, Item no. 13.31.1 |
| 12 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% |
| 13 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% |
| 14 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% |
| 15 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% |
| 16 | The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.0% Item No. 1 to 11 Cost of work (Item No.12 to 16, 5 Year Maintenance work) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 08, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 15, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysSep 15, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender