Water Resources and Irrigation Government Departments Closing in 1 days TDR #57391212

Tender For Stage Contract For Annual Repairs And Maintenance And Day To Day Work Of Various Assets Viz Fpws, Office, Buildings, Quarters Etc. Of Flood Control Sub-Division Nowshera Of Irrigation And F.C. Division Nowshera Under Mh-2711 For Fy 2026-2

Issued by Government Departments · Rajouri, Jammu and Kashmir
Tender Value
6 Lakhs
Estimated cost
Bid Submission
16 Sep 2026
1 days left
EMD
12000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rajouri → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Stage Contract For Annual Repairs And Maintenance And Day To Day Work Of Various Assets Viz Fpws, Office, Buildings, Quarters Etc. Of Flood Control Sub-Division Nowshera Of Irrigation And F.C. Division Nowshera Under Mh-2711 For Fy 2026-27

BOQ

Name of Work:-
Sl. No. Item Description
1Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil)
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
4Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : (All kinds of soil)
5Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
6Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
7Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
81:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
91:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
10Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
11Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12CEMENT PLASTER; (IN FINE SAND)12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
13CEMENT PLASTER; (IN FINE SAND)12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
14Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)
15Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:4:8 leaner mix (i/c equivalent design mix)
16Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
17Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
18Dismantling old protection work including cutting of crates and stacking of stones
19Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
20Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
21Dry stone pitching (any thickness) excluding cost of stones. On slopes
22Hand-packing stones in wire-crates; excluding cost of crates and stones
23Dumping stone excluding cost of stones. in Horizontal on level
24Dumping stone excluding cost of stones. On slope (Behind pitching)
25Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
26Opening out old wire crates those and re-binding after filling.
27Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)
28Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / s]and
29Unloading sand/earth filled bags from boats placing in dry
30Unloading sand/earth filled bags from boats placing in wet
31Engagement of Labour / Bullock man with single bullock / Chowkidar / Belder/ Coolie/ Mali / sewer man / Helper (Technician) {unskilled labour}
32Mason (1st class), fitter (Grade-I),Carpenter(1st class), Black smith (1st class), Mistry, Technician etc.
33Supply of Empty cement bags
34Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms
35Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kms upto 10 Kms (per Km)
36Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kms upto 20 Kms (per Km)
37Cement & steel, G.I/C.I pipe avg. lead beyond 20 Kms per additional Km
38Sand & Agg. 20 mm avg. lead upto 05 Kms
39Sand & Agg. 20 mm avg. lead beyond 5 Kms upto 10 Kms (per Km)
40Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km)
41Sand & Agg. 20 mm avg. lead beyond 20 Kms per additional Km
4240 mm Agg. avg. lead upto 5 Kms
4340 mm Agg. avg. lead beyond 05 Kms upto 10 Kms (per Km)
4440 mm Agg. avg. lead beyond 10 Kms upto 20 Kms (per Km)
4540 mm Agg. avg. lead beyond 20 Kms per additional Km
46Stone soling avg. lead upto 5 Kms
47Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km)
48Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km)
49Stone soling avg. lead beyond 20 Kms per additional Km
50Earth avg. lead of upto 05 Km
51Earth avg. lead beyond 05 Kms upto 10 Kms (per Km)
52Earth avg. lead beyond 10 Kms upto 20 Kms (per Km)
53Earth avg. lead beyond 20 Kms per additional Km
54Carriage of material by manual from road site to actual site of work, including loading, unloading and stacking etc. complete by manual labour Cement for an avg. lead upto 50 mtr.
55Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.
56Steel for an average lead upto 50 Mtr
57Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50 Mtrs
58Soling for an avg. lead upto 50 mtr.
59Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.
60Sand & stone below 40mm Agg for an average lead upto 50Mtr
61Sand & stone below 40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.
62sand & stone agg40mm and above for an average lead upto 50Mtr
6340mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.
64Earth for an average lead upto 50Mtr
65Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.
66Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.50mx1.50m with lids (15cm x 15cm Mesh)
67Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.20mx1.20m with lids (15cm x 15cm Mesh) Please Enable Macros to View BoQ information Compatibility Report for boq 1.xls Run on 5/3/2023 10:59 The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format. Significant loss of functionality # of occurrences This workbook contains data in cells outside of the row and column limit of the selected file format. Data beyond 256 (IV) columns by 65,536 rows will not be saved. Formula references to data in this region will return a #REF! error. 2.0 'BoQ1'!L177 Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped. 3.0 'BoQ1'!A1:II179 Minor loss of fidelity Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned. 5Defined Names Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 17.0

AI Tender Summary

OUR REF NO 57391212
AUTHORITY Government Departments
TENDER VALUE 6 Lakhs
LAST DATE 16-09-2026
Authority
Authority Name Irrigation And Flood Control Department
Work Description Tender for Stage Contract For Annual Repairs And Maintenance And Day To Day Work Of Various Assets Viz Fpws, Office, Buildings, Quarters Etc. Of Flood Control Sub-Division Nowshera Of Irrigation And F.C. Division Nowshera Under Mh-2711 For Fy 2026-27
Basic Detail
Tender No e NIT No. 13 of 2026-27
Bidding Type Tender
Location
City Rajouri
State Jammu and Kashmir
Key Dates
Publish Date 08 Sep 2026
Submission Date 16 Sep 2026
Open Date 17 Sep 2026
Finance
Tender Value 6 Lakhs
Tender Fee 500
EMD 12000
Exemption Not Available
Document List
7cdd2f92-37b6-4bfe-bb75-03cd2849c22e.html
BOQ_1090822.xls
Tendernotice_1 (19).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Sep 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

7cdd2f92-37b6-4bfe-bb75-03cd2849c22e.html

xls

BOQ_1090822.xls

pdf

Tendernotice_1 (19).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders