Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 18 days TDR #57385958

Bids Are invited for Custom Bid For Services - Cleaning Disposal Of Strom Water Drainage System Inside Smelter Plant For 2026-2028 - Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within

Issued by Boards / Undertakings / PSU · Anugul, Odisha
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Sep 2026
18 days left
EMD
40000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Anugul → Odisha
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Cleaning Disposal Of Strom Water Drainage System Inside Smelter Plant For 2026-2028 - Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width Up To 500Mm And Depth Variable.) , Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width 501Mm To 750Mm And Depth Variable.) , Cleaning Of Silt, Slush, Earth,Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width 751 And Above With Depth Variable.) , Cleaning Of Silt, Slush, Earth,Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Trapezoidal Drain Bottom Width 300 To 950Mm, Top Width And Height Variable.) , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 230 Mm To 450Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 500Mm To 800Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 850Mm To 1200Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris And Grasses/Bushes Etc. From Storm Water Rcc Box Culverts And Stacking Of The Same By Manual / Mechanical Means Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris, Grasses/Bushes And Gunny Bags Etc. From Storm Water Catch Basin Including Stacking Of The Same Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris, Grasses/Bushes And Gunny Bags Etc. From Storm Water Catch Basin Including Stacking Of The Same Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Surface Dressing Of The Ground In All Kinds Of Soil Including Cutting, Filling And Removing Of Vegetation/Debris And In Equalities Not Exceeding 30Cm Deep & Disposal Of The Debris/Earth Within 50 Mtr Lead By Manual / Mechanical Means, Dressed And Levelled As Per Specification And Direction Of Eic For All Drains. , Disposal Of Drain Cleaned Debris, Slush, Heap Of Earth, Heap Of Debris And Dismantling Materials From Various Units And Buildings Of Smelter Plant Beyond 1Km And Up To 3 Km From The Loading Point Including Cutting, Loading, Unloading By Manual / Mechanical Transport Within Plant All Complete As Per The Specifications And Direction Of The Eic. (Mode Of Measurement Will Be Followed As Mentioned In Special Condition Of Contract) , Cleaning Of Boundary Jalli Including Removal Of Vegetation Slushy Soil, Garbage, Loose Boulder, Bags, Polythenes, Grass, Construction Rubbishes, Earth Etc. Disposal And Levelling Of Materials In The Low Laying Area With 100M Lead Etc. All Complete As Per The Specification & Directions Of The Eic. , Cleaning And Lifting Of Rejected Anode, Butts From Storm Water Drain By Mechanical Mean (Hydra) Carefully And Stacking The Same Within 100M Lead As Per Direction Of Eic. , Cleaning Of Floors, Road Berms, Adjoining Area On Both Side Of Drain, Rcc Roof Tops At All Level In Smelter Plant Including Collection Of Wooden, Steel & Scrap Materials & Stacking Of Debris, Chipping Of Floors If Required, Bagging Of Sand And Earth Up To 100Mm Depth & Final Disposal Beyond A Lead Of 100Mtr As Per The Direction Of Eic. (Measurement Will Be Taken On The Basis Of Area Cleaned)

BOQ

Sl. No. Item TitleItem Description
1Cleaning of silt, slush, earth, debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Rectangular section width up to 500mm and depth variable.)Cleaning of silt, slush, earth, debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Rectangular section width up to 500mm and depth variable.)
2Cleaning of silt, slush, earth, debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Rectangular section width 501mm to 750mm and depth variable.)Cleaning of silt, slush, earth, debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Rectangular section width 501mm to 750mm and depth variable.)
3Cleaning of silt, slush, earth,debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Rectangular section width 751 and above with depth variable.)Cleaning of silt, slush, earth,debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Rectangular section width 751 and above with depth variable.)
4Cleaning of silt, slush, earth,debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Trapezoidal drain bottom width 300 to 950mm, top width and height variable.)Cleaning of silt, slush, earth,debris, grasses / bushes etc. from open pucca drains and stacking of the same within 50 mtr lead by manual / mechanical means including all tools, tackles, labours etc. all complete as per the specification and direction of the EIC including removal & refixing of drain covers if any. (Trapezoidal drain bottom width 300 to 950mm, top width and height variable.)
5Cleaning of silt, slush, earth, debris etc. from storm water RCC pipe 230 mm to 450mm dia culverts and stacking / disposal of the same within 50 mtr lead by manual/ mechanical menas including all tools, tackles, labours etc. all complete as per the specification and direction of EIC.Cleaning of silt, slush, earth, debris etc. from storm water RCC pipe 230 mm to 450mm dia culverts and stacking / disposal of the same within 50 mtr lead by manual/ mechanical menas including all tools, tackles, labours etc. all complete as per the specification and direction of EIC.
6Cleaning of silt, slush, earth, debris etc. from storm water RCC pipe 500mm to 800mm dia culverts and stacking / disposal of the same within 50 mtr lead by manual/ mechanical menas including all tools, tackles, labours etc. all complete as per the specification and direction of EICCleaning of silt, slush, earth, debris etc. from storm water RCC pipe 500mm to 800mm dia culverts and stacking / disposal of the same within 50 mtr lead by manual/ mechanical menas including all tools, tackles, labours etc. all complete as per the specification and direction of EIC
7Cleaning of silt, slush, earth, debris etc. from storm water RCC pipe 850mm to 1200mm dia culverts and stacking / disposal of the same within 50 mtr lead by manual/ mechanical menas including all tools, tackles, labours etc. all complete as per the specification and direction of EIC.Cleaning of silt, slush, earth, debris etc. from storm water RCC pipe 850mm to 1200mm dia culverts and stacking / disposal of the same within 50 mtr lead by manual/ mechanical menas including all tools, tackles, labours etc. all complete as per the specification and direction of EIC.
8Cleaning of silt, slush, earth, debris and grasses/bushes etc. from storm water RCC box culverts and stacking of the same by manual / mechanical means within 50 mtr lead inside the smelter plant including all tools, tackles, labours etc. all complete as per the specifications and direction of EIC.Cleaning of silt, slush, earth, debris and grasses/bushes etc. from storm water RCC box culverts and stacking of the same by manual / mechanical means within 50 mtr lead inside the smelter plant including all tools, tackles, labours etc. all complete as per the specifications and direction of EIC.
9Cleaning of silt, slush, earth, debris, grasses/bushes and gunny bags etc. from storm water catch basin including stacking of the same within 50 mtr lead inside the smelter plant including all tools, tackles, labours etc. all complete as per the specifications and direction of EIC.Cleaning of silt, slush, earth, debris, grasses/bushes and gunny bags etc. from storm water catch basin including stacking of the same within 50 mtr lead inside the smelter plant including all tools, tackles, labours etc. all complete as per the specifications and direction of EIC.
10Cleaning of silt, slush, earth, debris, grasses/bushes and gunny bags etc. from storm water catch basin including stacking of the same within 50 mtr lead inside the smelter plant including all tools, tackles, labours etc. all complete as per the specifications and direction of EIC.Cleaning of silt, slush, earth, debris, grasses/bushes and gunny bags etc. from storm water catch basin including stacking of the same within 50 mtr lead inside the smelter plant including all tools, tackles, labours etc. all complete as per the specifications and direction of EIC.
11Surface dressing of the ground in all kinds of soil including cutting, filling and removing of vegetation/debris and in equalities not exceeding 30cm deep & disposal of the debris/earth within 50 mtr lead by manual / mechanical means, dressed and levelled as per specification and direction of EIC for all drains.Surface dressing of the ground in all kinds of soil including cutting, filling and removing of vegetation/debris and in equalities not exceeding 30cm deep & disposal of the debris/earth within 50 mtr lead by manual / mechanical means, dressed and levelled as per specification and direction of EIC for all drains.
12Disposal of drain cleaned debris, slush, heap of earth, heap of debris and dismantling materials from various units and buildings of smelter plant beyond 1KM and up to 3 KM from the loading point including cutting, loading, unloading by manual / mechanical transport within plant all complete as per the specifications and direction of the EIC. (Mode of Measurement will be followed as mentioned in Special condition of contract)Disposal of drain cleaned debris, slush, heap of earth, heap of debris and dismantling materials from various units and buildings of smelter plant beyond 1KM and up to 3 KM from the loading point including cutting, loading, unloading by manual / mechanical transport within plant all complete as per the specifications and direction of the EIC. (Mode of Measurement will be followed as mentioned in Special condition of contract)
13Cleaning of boundary jalli including removal of vegetation slushy soil, garbage, loose boulder, bags, polythenes, grass, construction rubbishes, earth etc. disposal and levelling of materials in the low laying area with 100m lead etc. all complete as per the specification & directions of the EIC.Cleaning of boundary jalli including removal of vegetation slushy soil, garbage, loose boulder, bags, polythenes, grass, construction rubbishes, earth etc. disposal and levelling of materials in the low laying area with 100m lead etc. all complete as per the specification & directions of the EIC.
14Cleaning and lifting of rejected anode, butts from storm water drain by mechanical mean (hydra) carefully and stacking the same within 100m lead as per direction of EIC.Cleaning and lifting of rejected anode, butts from storm water drain by mechanical mean (hydra) carefully and stacking the same within 100m lead as per direction of EIC.
15Cleaning of floors, road berms, adjoining area on both side of drain, RCC roof tops at all level in smelter plant including collection of wooden, steel & scrap materials & stacking of debris, chipping of floors if required, bagging of sand and earth up to 100mm depth & final disposal beyond a lead of 100mtr as per the direction of EIC. (Measurement will be taken on the basis of area cleaned)Cleaning of floors, road berms, adjoining area on both side of drain, RCC roof tops at all level in smelter plant including collection of wooden, steel & scrap materials & stacking of debris, chipping of floors if required, bagging of sand and earth up to 100mm depth & final disposal beyond a lead of 100mtr as per the direction of EIC. (Measurement will be taken on the basis of area cleaned)

AI Tender Summary

OUR REF NO 57385958
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 28-09-2026
Authority
Authority Name National Aluminium Company Limited
Work Description Bids Are invited for Custom Bid For Services - Cleaning Disposal Of Strom Water Drainage System Inside Smelter Plant For 2026-2028 - Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width Up To 500Mm And Depth Variable.) , Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width 501Mm To 750Mm And Depth Variable.) , Cleaning Of Silt, Slush, Earth,Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width 751 And Above With Depth Variable.) , Cleaning Of Silt, Slush, Earth,Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Trapezoidal Drain Bottom Width 300 To 950Mm, Top Width And Height Variable.) , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 230 Mm To 450Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 500Mm To 800Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 850Mm To 1200Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris And Grasses/Bushes Etc. From Storm Water Rcc Box Culverts And Stacking Of The Same By Manual / Mechanical Means Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris, Grasses/Bushes And Gunny Bags Etc. From Storm Water Catch Basin Including Stacking Of The Same Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris, Grasses/Bushes And Gunny Bags Etc. From Storm Water Catch Basin Including Stacking Of The Same Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Surface Dressing Of The Ground In All Kinds Of Soil Including Cutting, Filling And Removing Of Vegetation/Debris And In Equalities Not Exceeding 30Cm Deep & Disposal Of The Debris/Earth Within 50 Mtr Lead By Manual / Mechanical Means, Dressed And Levelled As Per Specification And Direction Of Eic For All Drains. , Disposal Of Drain Cleaned Debris, Slush, Heap Of Earth, Heap Of Debris And Dismantling Materials From Various Units And Buildings Of Smelter Plant Beyond 1Km And Up To 3 Km From The Loading Point Including Cutting, Loading, Unloading By Manual / Mechanical Transport Within Plant All Complete As Per The Specifications And Direction Of The Eic. (Mode Of Measurement Will Be Followed As Mentioned In Special Condition Of Contract) , Cleaning Of Boundary Jalli Including Removal Of Vegetation Slushy Soil, Garbage, Loose Boulder, Bags, Polythenes, Grass, Construction Rubbishes, Earth Etc. Disposal And Levelling Of Materials In The Low Laying Area With 100M Lead Etc. All Complete As Per The Specification & Directions Of The Eic. , Cleaning And Lifting Of Rejected Anode, Butts From Storm Water Drain By Mechanical Mean (Hydra) Carefully And Stacking The Same Within 100M Lead As Per Direction Of Eic. , Cleaning Of Floors, Road Berms, Adjoining Area On Both Side Of Drain, Rcc Roof Tops At All Level In Smelter Plant Including Collection Of Wooden, Steel & Scrap Materials & Stacking Of Debris, Chipping Of Floors If Required, Bagging Of Sand And Earth Up To 100Mm Depth & Final Disposal Beyond A Lead Of 100Mtr As Per The Direction Of Eic. (Measurement Will Be Taken On The Basis Of Area Cleaned)
Basic Detail
Tender No GEM/2026/B/8005658
Bidding Type Tender
Location
City Anugul
State Odisha
Key Dates
Publish Date 07 Sep 2026
Submission Date 28 Sep 2026
Open Date 29 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 40000
Exemption Not Available
Document List
ce83af25-faa1-44ac-b263-fdfb49db82d3.pdf
1788774660.xlsx
1788774759.pdf
1788774772.pdf
1788774780.pdf
1788774790.pdf
1788774804.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Sep 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
pdf

ce83af25-faa1-44ac-b263-fdfb49db82d3.pdf

xlsx

1788774660.xlsx

pdf

1788774759.pdf

pdf

1788774772.pdf

pdf

1788774780.pdf

pdf

1788774790.pdf

pdf

1788774804.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders