Public Administrative Department Local Bodies Closing in 10 days TDR #57385881

Tender For Development Of Office Building At Orphangunge Market At Ward 74

Issued by Local Bodies · Kolkata, West Bengal
Tender Value
28.50 Lakhs
Estimated cost
Bid Submission
24 Sep 2026
10 days left
EMD
58000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Development Of Office Building At Orphangunge Market At Ward 74

BOQ

Name of Work:- DEVELOPMENT OF OFFICE BUILDING AT ORPHANGUNGE MARKET AT WARD 74
Sl. No. Item Description
1BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof.
2BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick
3BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof (b) above 150 mm. thick
4BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
5BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
6BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
7BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor
8BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
9SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster
10SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
11SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster
12SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (a) 25 mm thick plaster
13BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(6)Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement.(ii) 25 mm. thick.(Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A).
14BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A.(i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m (3rd Corrigenda & addenda dated 04.06.2018)
15BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 1. Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (c) Sal : Siliguri Note: Extra for Lifting Charges for each additional floor, i) Rs. 200/- per Cu.m (upto 4th floor) ii) Rs.250/-(above 4th floor)
16ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
17BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 10. Z-batten shutters of door and window as per design havings tongued and groovehalf lap jointed as per direction of the Engineer-in-Charge including fitting and fixing shutter in position, but excluding the cost of hinges and other fittings in ground floor. (B) Shutter with 19mm thick planks, 19mm thick battens (i) Sal : Local . Note: i) Lifting Charges for upper floors refer item H (2).
18ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
19BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. (10th Corrigenda & addenda dated 22.01.2020)
20BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . C. REPAIR & REHABILITATION FOR WATERPROOFING 1. Taking out old damaged tarfelt from the roof, parapet etc. preparing the roof surfaces by removing all spoils, blisters,moss etc. from the working site and disposal of the same beyond the compound and cleaning the site in all respect as per direction of Engineer-in-Charge. All floor
21BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
22BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . B. WATERPROOF TREATMENT 4. Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse)
23BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING 14. Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:- a) With 0.5 mm thick sheet
24BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 2A. M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For roof truss works a) Span up to 12 Mtr (3rd Corrigenda & addenda dated 04.06.2018)
25PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz.socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (i) CPVC Pipes Class-1, SDR-11 (Dia) 15 mm
26PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz. socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (i) CPVC Pipes Class-1, SDR-11 (Dia) 20 mm
27PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories,specials viz. socket,bend,tee,union,cross,elbo,nipple,longscrew, reducing socket,reducing tee, short piece etc.fitted with holder bats clamps, including cutting pipes,fitting, fixing etc.complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (i) CPVC Pipes Class-1, SDR-11 (Dia) 25 mm
28BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.A) UPVC Pipes: (iii) 160 mm. Dia.
29BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.A) UPVC Pipes:(ii) 110 mm. Dia.
30BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.B) UPVC Fittings:a) Plain Tee(ii) 110 mm. Dia.
31BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.B) UPVC Fittings:b) Plain Y.(ii) 110 mm. Dia.
32BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.B) UPVC Fittings:c) Bend 87.5 degree. (ii) 110 mm. Dia
33BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 3. Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly a) 3.90 metre height
34BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 3. Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly b) Extra for additional 3.6 height or part thereof
35BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
3635mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath.
37(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(4)Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing).(ii) 530 mm X 410 mm
38BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 18. Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages complete. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) In ground floor. (Payment will be made on the area of the gate covered by two guard rails and two extreme channels) (3rd Corrigenda & addenda dated 04.06.2018)
39SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(14)Supplying,fitting and fixing cast iron 'P' or 'S' trap conformimg to I.S. 3989/ 2009 and 1729/ 2002 including lead caulked joints and painting two coats to the exposed surface. (Painting to be paid seperately).(A) 'P' Trap.(iii) 100 mm.
40SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
41BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m (3rd Corrigenda & addenda dated 04.06.2018)
42SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 7 Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (a) One Coat i) Water based interior grade Acrylic Primer.[This item to be done under specific instruction of the Superintending Engineer]
43SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 10 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats
44SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
45BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
46SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
47SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
48SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (b) Two Coats [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C
49SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 17 Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) a) Normal Acrylic Emulsion N.B. The items [17 (b) & 17(c)] of subhead A are to be selected only with written permission of Superintending Engineer for very resticted and small areas of a building.
50BUILDING WORKS(L) GLAZIER'S WORK?..(A)... ORIGINAL WORKS?(7)Supplying, fitting and fixing in position fibre glass panes of approved quality with resin, nail, clip etc. as per IS:12866-1989. (In all floors for internal wall & upto 6 m height for external wall)(e) 4.0 mm thick (6.72 Kg/Sq.m)
51BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 6) Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in-charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point.
52BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
53SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(2)Supplying, fitting and fixing E.W.C. in white glazed vitreous chinaware of approved make complete in position with necessary bolts, nuts etc.(a) With 'P' trap
54SECTION (A) - PLUMBING WORKS (A)-(IV) CISTERN, G.I.TANKS WITH PARTS Item No. (a) Original Works Supplying, fitting and fixing 10 litre porcelain low-down cistern of approved make without fittings and brackets.
55SECTION(A) PLUMBINGWORKS (A)(IV) CISTERN,G.I.TANKS WITH PARTS (a) Original Works 6 Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer a) 500 litre capacity
56SECTION(A) PLUMBINGWORKS (A)(IV) CISTERN,G.I.TANKS WITH PARTS (a) Original Works 6 Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (b) 1000 litre capacity
57(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.(b) Repair Works.(2)Dismantling Indian W.C. including taking out base concrete as necessary.
58MATERIALS AND LABOUR ETC.(C)-(I) MISCELLANEOUS 17 Dismantling ball cock and refixing the same after repair including straightening lever and renewing split pin. (ii) 20 mm
59(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(6)Supplying, fitting and fixing Flat back urinal (half stall urinal) in white vitreous chinaware of approved make in position with brass screws on 75 mm X 75 mm X 75 mm wooden blocks complete.(ii) 470 mm X 280 mm X 340 mm
60SECTION(A) PLUMBINGWORKS (A)(V) BASIN AND SINKS WITH PARTS (a) Original Works 2 Supplying, fitting and fixing white vitreous china best quality approved make wash basin with C.I. brackets on 75 mm X 75 mm wooden blocks, C.P. waste fittings of 32 mm dia., one approved quality brass C.P. pillar cock of 15 mm dia., C.P. chain with rubber plug of 30 mm dia., approved quality P.V.C. waste pipe with C.P. nut 32 mm dia., 900 mm long approved quality P.V.C. connection pipe with heavy brass C.P. nut including mending good all damages and painting the brackets with two coats of approved paint. (i) 450 mm X 300 mm size
61BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 3. Supplying, fitting and fixing fibre reinforced polymer (FRP) Composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to safisfy IS: 4020 door testing performance criteria (i) 66mm x 90mm
62BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 14. Supplying, fitting & fixing fibre reinforced polymer (FRP) Composite door shutters as per approved design with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to satisfy IS:4020 door testing performance criteria. In ground floor (i) 32 mm thick. (For upper floors refer to item H(4) also)
63BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 1. Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) (ii) 40mm thick shutters with 19mm thick panel of size 30 to 45 cm (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Note: i) Lifting Charges for upper floors refer item H (2). (ii) In case of panel with Rly. Type batton the rates will be reduced by Rs.20.00 /Sq.m.)
64BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
65BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m? of concrete surface).Note: Applicable only when the full diameter of reinforcement steel is exposed.
66BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment]
67BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 26. Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium plated screws: (iii) 100mm long x 10mm dia. bolt.
68BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 10. i) Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (b) 250mm long.
69BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 5. Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark (viii) 100mm. X 75mm. X 3.50mm.. (Add Extra 30% for Oxidised Fittings)
70Sub Total
71GST 18%
72CESS 1% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57385881
AUTHORITY Local Bodies
TENDER VALUE 28.50 Lakhs
LAST DATE 24-09-2026
Authority
Authority Name Kolkata Municipal Corporation
Work Description Tender for Development Of Office Building At Orphangunge Market At Ward 74
Basic Detail
Tender No MC/MKT/ORPHANGUNGE/02/2025-26 (1st call)
Bidding Type Tender
Location
City Kolkata
State West Bengal
Key Dates
Publish Date 07 Sep 2026
Submission Date 24 Sep 2026
Open Date 26 Sep 2026
Finance
Tender Value 28.50 Lakhs
Tender Fee Ref. Documents
EMD 58000
Exemption Not Available
Document List
452ebe86-bc2a-44b2-9d17-906fb2ad8377.html
BOQ_2555953.xls
Specification.pdf
Tendernotice_1 (38).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Sep 26, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

452ebe86-bc2a-44b2-9d17-906fb2ad8377.html

xls

BOQ_2555953.xls

pdf

Specification.pdf

pdf

Tendernotice_1 (38).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders