Tender For Construction Of Bridge Over Chainpur River Near House Of Bajrang Mahtos At Balsagra Gram Panchayat, Dadi Block In District Hazaribag
Tender Value
3.13 Crore
Estimated cost
Bid Submission
29 Sep 2026
14 days left
EMD
6.28 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ramgarh → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Bridge Over Chainpur River Near House Of Bajrang Mahtos At Balsagra Gram Panchayat, Dadi Block In District Hazaribag
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Depth upto 3m |
| 2 | Depth between 3m to 6m |
| 3 | Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means |
| 4 | PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.) |
| 5 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling |
| 6 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump) |
| 7 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification |
| 8 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M25 using batching plant , transit mixer & concrete pump) Height Upto 5m |
| 9 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification. |
| 10 | Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M30 Slab (Height between 5m to 10m) |
| 11 | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications. |
| 12 | Providing drainage spout complete as per drawing and technical specification |
| 13 | Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins. |
| 14 | PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump |
| 15 | Approach Slab (M30 Grade) including reinforcement and formwork complete as per drawing and Technical specification. |
| 16 | Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification. |
| 17 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 18 | Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 19 | Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 20 | Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification |
| 21 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications |
| 22 | APPROACH ROAD PART Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.Rate per cum after adding royalty @Rs 27.48/cum |
| 23 | Construction of embankment with approved materials obtained from Borrow Pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading, to required slope and compacting to meet requirement of table 300-2. |
| 24 | Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction. |
| 25 | Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401) for Grading - I Material |
| 26 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 27 | Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting) |
| 28 | GUARD WALL PART Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 29 | Sand filling in foundation trenches as per Drawing and Technical specification |
| 30 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M10 ) PCC Grade M10 using batching plant & Concrete pump |
| 31 | Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed) |
| 32 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Random Rubble Masonry (Coursed/uncoursed) |
| 33 | Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification. |
| 34 | Pointing with cement mortar (1:3) on brickwork in substructure as per Technical specifications |
| 35 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping PCC Grade M20 using batching plant, transit mixer & concrete pump |
| 36 | RETAINING WALL Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 37 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M10 using batching plant & Concrete pump |
| 38 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, RCC Grade M25 using batching plant,transit mixer & Concrete pump |
| 39 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 using batching plant, transit mixer & concrete pump |
| 40 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 41 | Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 42 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. |
| 43 | Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification. |
| 44 | Cement |
| 45 | Boulder |
| 46 | Aggregate |
| 47 | Steel |
| 48 | Goods & Services Tax (G.S.T.) - 18% |
| 49 | Labour Cess - 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 29, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysOct 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender