Metro Rail Boards / Undertakings / PSU Closing in 35 days TDR #57381499

Tender For Design, Supply, Installation, Testing & Commissioning Of Interoperable Signalling System For Lajpat Nagar - Saket G-Block Corridor (Line-11) Of Delhi Metro Phase-Iv Mrts

Issued by Boards / Undertakings / PSU · New Delhi, Delhi
Tender Value
78.64 Crore
Estimated cost
Bid Submission
19 Oct 2026
35 days left
EMD
39.32 Lakhs
Bank guarantee accepted
Document Fee
23600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
New Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Design, Supply, Installation, Testing & Commissioning Of Interoperable Signalling System For Lajpat Nagar - Saket G-Block Corridor (Line-11) Of Delhi Metro Phase-Iv Mrts

BOQ

Name of Work:- Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS
Sl. No. Item Description
1Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS Preamble (1) The Bill of Quantity (BOQ) shall be read in conjunction with Instructions to Tenderer (ITT), General condition of contract, Special Condition of contract, and Employer’s Requirements (General Specifications & Particular Specifications). 2) Bidder shall note that prices shall be quoted against each item in the Bill of Quantity (BOQ). The contract price i.e. ‘Tender Total Lumpsum Price’ shall be inclusive of all central/State/Local Taxes, GST, IGST on Reverse Charge Mechanism(RCM), tax under reverse charge mechanism, Custom duty, Duties, Levies, Cess and all other incidental charges required to fulfil the tender conditions including statutory deductions viz., TDS towards Income Tax/GST/Labour Cess and any other taxes etc. For further details , bidder is required to take note of Clause 34 of Special Condition of contract (SCC). The bidders are advised to quote the price inclusive of all central/state/local taxes (except GST), duties, levies, cess and all other incidental charges required to fulfil the tender conditions including statutory deduction viz., TDS towards Income Tax / GST/ Labour cess etc. after considering clause C2.4, C2.5 & C2.6 of ITT. The GST amount as per the applicable GST rate quoted will be added in the quoted Price to arrive at the total Contract price inclusive of GST. 3) Errors will be corrected by the employer for any arithmetic errors in computation or summation as per contract conditions. 4) Bidder shall note that total price mentioned in Bid Total of Appendix-A of Pricing Document and BOQ total price must be equal. In case of discrepancies, Lump-Sum Price stated in BOQ Sheet in Figures shall prevail. 5) The rates and prices to be quoted in the Pricing Document are for completed and finished items of work and complete in all respect. It will be deemed to include cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, contractor’s profit and establishment/overheads, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. 6) In accordance with SCC clause 52(para no. 2), The bidder shall submit unpriced list of spares for maintenance of supplied system in the format as per Appendix-32 of FOT in Technical Bid and priced list for the same in the Price Bid. The Employer may, during a period of ten years from the date of taking over of the whole works, purchase as many spare parts as required by him, at the rates indicated in ‘Format as per Appendix-32 of FOT’ submitted with the price bid. However, due to any reason(s), if the bidder is not able to submit unpriced list of spares for maintenance of supplied system in the format as per Appendix-32 of FOT in Technical Bid and priced list for the same in the Price Bid, tenderer shall submit an undertaking as per Appendix 33 that the list of spares for Ten (10) years of system operation will be submitted within 180 days from the date of issue of Letter of Acceptance (LOA) (both days inclusive i.e. the date of submission of List of spares for 10 years of operation and the date of issue of LOA). The rates of these spares (Appendix-32 of FOT) will not be considered for Bid evaluation while assessing the L1 bidder. For detailed information Additional clause 1 of SCC 52(para 2) may be referred. The bidder shall also submit list of interoperable/interchangable spares/hardware list in accordance with SCC clause 52(para 1) and as per employer requirement- Particular specification. 7) Minor Deviation- Price of Minor Deviation if any shall be submitted in format as per Appendix-13 & 13A of FOT or Appendix-N of Price Bid. This price should neither be added nor subtracted in the offer of Bidder for evaluation. This shall be dealt with as per ITT clause C15. Tender inviting authority: Sr GM/Contracts Name of the work: \\"Contract D2S06 – Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS\\" Contract: D2S06 Appendix- A BID TOTAL This fixed lum sum price(including all taxes and duties) and GST(IGST/SGST/CGST/UTGST) of Contract D2S06 is (in accordance with SCC clause 34): TOTAL for Contract D2S06 – Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS Indian Rupees(INR) Total amount including all taxes(including GST) and duties in figures:- Total amount including all taxes(including GST) and duties in words:- ` Taxes and Duties Details of Taxes/Duties (GST only) which are included in the quoted fixed lump-sum price: GST amount (in INR) Appendix B- SECTION SUMMARIES Tender D2S06 Section:- Lajpat Nagar To Saket G Block Cost Centres Description of Cost Centre Price including all taxes and duties Rupee Amount INR A Preliminaries and General Requirements 0.0 B Detailed Design 0.0 C Manufacture and Delivery 0.0 D Installation and Site testing 0.0 E System Acceptance test, Integrated Testing and commissioning 0.0 SECTION TOTAL CARRIED TO BID TOTAL 0.0 Section : Miscellaneous Cost Centres Description of Cost Centre Price including all taxes and duties Rupee Amount INR MS A Spares 0.0 MS B Supervision of maintenance 0.0 MS C Manuals 0.0 SECTION TOTAL CARRIED TO BID TOTAL 0.0 Appendix-C- Brief Description of Sections Section Brief Description of Activities Section:- Lajpat Nagar To Saket G Block Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor in stations/trackside/OCC/BCC/Train etc Section MS Miscellaneous Spares, ManualsSupervision of Maintenanceetc. SECTION:- Lajpat Nagar To Saket G Block COST CENTRE A – PRELIMINARIES AND GENERAL REQUIREMENTS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to: •Contractor’s Project Plan, Document Submission Programme, Designated system for documents submission, Health, Safety & Environment Plans,Interface management plan with designated contractors. •Works Programme, Document Submission Programme for Complete D2S06 contract. •EMC management plan•RAMS plan•Software Quality Assurance Plan•Quality plan•Setting up site office and related activities•Preliminary System Design for Train Control & Signalling Systems, consisting of: -System and Sub-system Overview, -System requirement specification, -System traceability specification, -System safety plan, -System Verification & Validation Plan -System Assurance Plans consisting of: EMC Management Plan, RAMS Plans, Software Quality Assurance Plan, Quality Plan -Preliminary design documents for subsequent stations need not be re submitted. However, design documents specific to relevant section shall be submitted. •CBTC interface with Rolling Stock , including design of drive's MMI for ATP etc.•CBTC interface with PSD including desing for different provision to be used by PSD system.•Software and system verification and validation standards, complete verification and validation documents for each generic product- CBI, CBTC(Trackside ATP, Onboard ATP, ATO/UTO/Radio Based Communication system, ATS) and Axle Counters, Track Side PSD interface equipment. •Signalling Plan and system block diagram.•Earthing and lightening protection plan.•Specification for indoor and line side equipments including the requirement for power, space and preliminary mounting details for main line. •Layout plan for equipment and cables in OCC. •Any other item(s) considered necessary to comply with the Scope of Work Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: A1 Contractor’s Project Plan, DocumentSubmission Procedure, Designated System for Documents Submission, Health, Safety & Environment Plans for complete D2S06 contract. Interface Management Plan with Designated Contractors for this section A2 Works Programme, Document SubmissionProgramme for complete D2S06 Contract. A3 Preliminary System design for Train Control & Signalling System for complete D2S06 contract. System Block Diagram for this section. A4 Software and System Verification and Validation Standards. Complete Verification and Validation Documents for each Generic Product – CBI, CBTC, (Trackside ATP, Onboard ATP/ ATO/UTO Mode, Radio based Communication System, ATS) and Axle Counters, Track side PSD interface equipment A5 Signalling Plan for Main Line for this section Train to wayside bidirectional communication scheme plan for main line and depot for this section. A6 Earthing, Lightening and Surge Protection Plan for complete D2S06 contract. A7 Layout plan for equipment and cables in OCC for this section A8 Any other item(s) considered necessary to comply with the scope of Works Cost Centre Total carried to section at summary 0.0 Note: The sum of the amounts apportioned to Cost Centres 'A' and 'B' of a Section except Section MS shall not exceed 15% of the apportioned amount for that Section SECTION:- Lajpat Nagar To Saket G Block COST CENTRE B- DETAILED DESIGN This Cost Centre comprises all those obligations and ongoing activities through out of the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to:Train Control & Signalling System•Delivery Schedules for Materials •Detailed Interface Documents with the Designated Contractors•Final Design of Signalling and Train control system consisting of:•Specifications of all Sub-systems: CBI including wayside equipment (Axle Counters, Signals, Point Machines), Access Point, Radio based communication system, (Onboard ATP, Trackside ATP including wayside equipment), ATO, UTO/, ATS, Cables, Communication network, Track side PSD interface equipment•Design of MMIs viz. ATS, Onboard ATP, CBI Control Workstation•Verification and Validation Plans of all sub-systems•Design Verification Table•Train performance curves, run time calculations and simulation of required headway•Hazard Analysis•Preliminary Hazard analysis, •System Hazard analysis, •Sub system hazard analysis, •Interface hazard analysis•Operating & Support Hazard Analysis•Final System Assurance PlansApplication/ Configuration Documents – •Train Movement Specification•Control/ Route Table •CBTC Configuration Document,•ATO/ATP/ UTO configuration document. •ATS Configuration document. •Object controller configuration document.•Radio System configuration document. •System Configuration drawing/ Document. Track side PSD interface equipment•Initial submission of OMPD for Employer’s review.•Factory Acceptance Test Plans and Type Test Plans including planning, methodology and checklists •Equipment installation methods for all indoor and outdoor equipment.•Application drawings including Bonding Plan, Axle Counter Layout Drawing, Radio system/ Access Point layout Drawing, Track side PSD interface equipment Cable Layout Drawing, Cable Termination and Distribution Drawing, Beacon Layout Plan, Room Layout Plans, Circuit Diagrams including interconnection details of all subsystems, detailed layout plan of OCC equipment including OCC display panel, Layout plan of Onboard ATP equipments, Equipment Installation Drawings. Train to Wayside Bi-directional communication layout including interconnection details of all network components. Any other item(s)considered necessary to comply with Scope of Work Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: B1* List of Materials required for this section and Delivery Schedule thereof B2(a) Detailed Interface Documents with the Designated Contractors for ATP/ATO for this section. B2(b) Detailed Interface Documents with the Designated Contractors for UTO for this section. B3 Final Design of Train control and signalling System for this section B4 Application/ Configuration Documents for Mainline for this section B5 Factory Acceptance Test Plans and Type Test Plans including planning, methodology and checklists for complete D2S06 contract. B6 Equipment installation methods for all indoor and outdoor equipment for complete D2S06 contract. B7 Application Drawings for Mainline, Trains and OCC for this section B8 Initial submission of OMPD for Employer’s review. B9 Any other item(s)considered necessary to comply with Scope of Work COST CENTRE TOTAL CARRIED TO SECTION ATSUMMARY 0.0 Note: The sum of the amounts apportioned to Cost Centres 'A' and 'B' of a Section except Section MS shall not exceed 15% of the apportioned amount for that Section. SECTION:- Lajpat Nagar To Saket G Block COST CENTRE C- MANUFACTURE AND DELIVERY This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:Receipt /delivery of following equipment for this Section after type test, factory acceptance test, and proof of insurance:Train Control & Signalling System•Receipt of Onboard ATP equipment, Beacon antenna, Speed detection devices, DCS Antenna with DCS modem and power supply, Driver's CBTC DMI, Onboard UTO/ATO equipment with all software, connectors, switch repeaters, switch user, train wake up module, relays, connecting cables etc, and associated accessories by Rolling Stock Contractor.•Delivery of CBI equipment for interlocking with all software and associated accessories, Cable termination rack, ESPs, EKTs and associated accessories at Contractor’s premises in Delhi.•Delivery of Access Point with associated accessories like edge switches etc at Contractor’s premises in Delhi.•Delivery of T-ATC, Bidirectional TWC equipment, Radio Zone Controller Passive Eurobalise(s), Beacons and associated accessories at Contractor’s premises in Delhi.•Delivery of Power Distribution Cubicle at Contractor’s premises in Delhi.•Delivery of ATS equipment for station, and other SCR equipment and associated accessories at Contractor’s premises in Delhi. •Delivery of ATS Equipment and associated accessories for OCC at Contractor’s premises in Delhi.•Delivery of signalling and power cable at Contractor’s premises in Delhi.•Delivery of line side signals and associated accessories at Contractor’s premises in Delhi.•Delivery of Axle Counters and associated accessories at Contractor’s premises in Delhi. •Delivery of point machines and associated accessories at Contractor’s premises in Delhi.•Delivery of Track side PSD interface equipment at contractor premises in Delhi.•Delivery of Overview Display System (ODS)/Large Video Screen (LVS) and associated accessories for OCC at Contractor’s premises in Delhi.•Any other item(s) considered necessary to comply with Scope of Work. Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the employer’s Representative for each of the following milestone after provision of bank guarantee, proof of insurance: C1 Receipt of onboard ATP/ ATO / UTO equipment, beacon antenna, Speed detection devices, DCS Antenna, driver’s MMI equipment and associated accessories for all cabs by Rolling Stock Contractor. C2 Delivery of T-ATC equipment,Radio zone controller, Access Point, Beacons,TWC along with trackside modules and associated accessories for Mainline at Contractor’s premises in Delhi for this section. C3 Delivery of CBI equipment, Cable termination rack, ESPs, EKTs with all associated accessories for Mainline at Contractor’s premises in Delhi for this section. C4 Delivery of ATS Equipment and associated accessories for stations, and OCC except Overview Display System (ODS)/Large Video Screen (LVS)at Contractor’s premises in Delhi For this section. C5 Delivery of OCC Overview Display System (ODS)/Large Video Screen (LVS) at Contractor’s premises in Delhi for this section. C6 Delivery of signalling and power cable for Mainline at Contractor’s premises in Delhi for this section. C7 Delivery of Line side signals, Axle Counters, Point Machines, Power Distribution Cubicles, and all associated accessories for Mainline at Contractor’s premises in Delhi for this section. C8 Delivery of Track side PSD interface equipment at contractor premises in Delhi for this section. C9 Any other item(s) considered necessary to comply with the scope of works COST CENTRE TOTAL CARRIED TO SECTION ATSUMMARY 0.0 Note: Total of Supply milestone(Cost Centre C) should match with total cost of supply schedules i.e. Schedule 3 & Schedule 5 of BOQ. SECTION:- Lajpat Nagar To Saket G Block COST CENTRE D- INSTALLATION AND SITE TESTING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:Indoor & Outdoor Equipment: •Shifting to Site from Contractor’s premises in Delhi, installation and testing of all indoor equipment such as CBI, CBTC, ATP/ ATO /UTO, axle counters, ATS, Bidirectional TWC network including switch, access points, rack, wiring and terminations etc. and outdoor equipment such as Line side equipment, Passive ballises, Access Points, line side signals, Axle Counters, point machines, Beacons, Loops including erection of junction boxes, wiring and terminations, etc.•shifting to site, installation and testing of Track side PSD interface equipment.•Receipt of equipment at Site, pre-installation tests, inspection of equipment and Site preparations.•Complete fixing and wiring of equipment in accordance with circuit and installation diagrams.•Post installation tests including: Pre-power up checking, power up, customisation and configuration of equipment.OCC – Equipment:•shifting to Site from Contractor’s premises in Delhi, installation and testing of all equipment including ATS computers, Overview Display System (ODS)/Large Video Screen (LVS) and associated accessories•Receipt of equipment at Site, pre-installation tests, inspection of equipment and Site preparations•Complete fixing and wiring of indoor equipment in accordance with circuit and installation diagrams.•Post installation tests including pre-power up checking, power up, customisation and configuration of equipment.Onboard Equipment:•Completion of Installation and testing of all on-board equipment for ATP/ ATO/ UTO/ and their associated accessories in 12 cabs, as certified jointly in writing, by the D2S06 Contractor and Rolling Stock Contractor for the satisfactory installation and testing of the on-board equipment for this section.Perform Partial Acceptance Tests in accordance with the accepted Train Control & Signalling PAT Plan Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: D1 Shifting to Site from Contractor’s premises in Delhi, installation and installation testing (includes pre-installation tests, post installation tests for all sub-system) of all station indoor and outdoor equipment such as CBI, Line side equipment, Passive ballises, Access Points, CBTC (ATP/ ATO/ UTO), TWC, LATS, Signals, Axle Counters, Track side PSD interface equipment. point machines, Beacons, DLR etc. for Mainline. D2 Shifting to Site from Contractor’s premises in Delhi, installation and installation testing (includes pre-installation tests, post installation tests for all sub-system) of OCC including ATS and ODS/LVS. D3 Completion of Installation and testing of on-board equipment for ATP/ATO, and their associated accessories in all cabs, as certified jointly in writing, by the D2S06 Contractor and Rolling Stock Contractor for the satisfactory installation and testing of the on-board equipment D4 Completion of Installation And testing of on-board equipment for UTO, and their associated accessories in all cabs, as certified jointly in writing, by the D2S06 Contractor and Rolling Stock Contractor for the satisfactory installation and testing of the onboard equipment. D5 Completion of Installation and testing of trackside UTO equipment and their associated accessories for mainline. D6 Completion of Partial Acceptance Tests for Train Control & Signalling system for this Section. COST CENTRE TOTAL CARRIED TO SECTION ATSUMMARY 0.0 Note:The sum of the amounts apportioned to Cost Centres 'D' and 'E' of a Section except Section MS shall not be less than 30% of the apportioned amount for that Section. Cost centre E shall not be less than 10% of the section total. SECTION:- Lajpat Nagar To Saket G Block COST CENTRE E- SYSTEM ACCEPTANCE TEST, INTEGRATED TESTING AND COMMISSIONING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:•Testing & Commissioning Documents including Interface Testing Plans•Integrated testing and commissioning documents•System Acceptance Tests in accordance with accepted System Acceptance Plan•Integrated Testing and Commissioning•Service Trials•System Safety Case of the Train Control & Signalling Systems and Assessment Report of Independent Safety Assessor.•Complete configuration software backup data for all subsystems including section, trains and OCC•As built Drawings.•Final OMPD submission•Any other item(s) considered necessary to comply with the Scope of Work.Stage 1 here means implementation upto ATO and Stage 2 here means implementation upto UTO. Bidder is required to pay attention to Appendix V of Particular specification in this regard. Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: E1 Testing & Commissioning Documents including Interface Testing Plans, System Acceptance Test Plan, Integrated Testing & CommissioningPlan and Service Trials Plan for complete D2S06 contract. E2 Completion of System Acceptance Test for stage 1 of commissioning for this section E3 Completion of System Acceptance Test for stage 2 of commissioning for this section E4 Completion of Integrated Testing & Commissioning for stage 1 of commissioning for this section E5 Completion of Integrated Testing & Commissioning for stage 2 of commissioning for this section E6 Completion of Service Trials for stage 1 of commissioning for this section E7 Completion of Service Trials for stage 2 of commissioning for this section E8 Completion of integration of ATS with system of other Designated contractors including maintenance management system for stage 1 of commissioning. E9 Completion of integration of ATS with system of other Designated contractors including maintenance management system for stage 2 of commissioning.Final submission of operating modes and principle documents for this section. E10 Complete configuration software backup data for all subsystems including section, trains and OCC for this section for stage 1commissioning. E11 Complete configuration software backup data for all subsystems including section, trains and OCC for this section for stage 2 ofcommissioning. E12 As built drawings for this section for this section including Train borne ATP/ ATO/ UTO System Indoor and outdoor equipment of all subsystems OCC E13 Final OMPD submission E14 System Safety Case and Assessment Report of Independent Safety Assessor for stage 1 of commissioning for this section E15 System Safety Case and Assessment Report of Independent Safety Assessor for stage 2 of commissioning for this section E16 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION ATSUMMARY 0.0 Note:The sum of the amounts apportioned to Cost Centres 'D' and 'E' of a Section except Section MS shall not be less than 30% of the apportioned amount for that Section. Cost centre E shall not be less than 10% of the section total. SECTION: MISCELLANEOUS COST CENTRE MS A- SPARES This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:•Supply of Contract Spares to Employer as per contract provisions for Train Control & Signalling systems for the Contract D2S06 and Submission of List of Spares(inlcuding spares having interchangeable/interoperable arrangement) for 10 Years of system operation from the last date of Taking over of whole works as per Additional clause-52 of Special Conditions of Contract •Any other item(s) considered necessary by the Contractor to comply with the Scope of Work. Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: MS A1 Delivery of Contract spares to employer as perprovisions of contract in Employer requirements MS A2 Submission of List of Spares (inlcuding spares having interchangeable/interoperable arrangement) for 10 Years of system operation from thelast date of Taking over of whole works and undertaking for interchangeable handware as perAdditional clause-52 of Special conditions of Contract MSA3 Any other item(s) considered necessary to comply with the scope of works COST CENTRE TOTAL CARRIED TO SECTIONMS SUMMARY 0.0 SECTION: MISCELLANEOUS COST CENTRE MS B : SUPERVISION OF MAINTENANCE This Cost Centre comprises supervision of maintenance of Train Control & Signalling systems. •The Contractor shall provide experts for supervision of maintenance* in accordance with the Employer’s Requirements* This excludes Contractor’s obligations and responsibilities during the Defects Liability Period.Notes:1.The deployment of the experts under this Cost Centre may not be continuous and they may be required to supervise the maintenance in short periods at a time. The number of man days of experts shall, however, not exceed 200 days. Payment for this Cost Centre will be made on man-days basis. Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: MS B1 Supervision of maintainence for this section MS B2 Any other item(s) considered necessary to comply with the scope of works Cost Centre Total 0.0 Note: Supervision of maintainence excludes Contractor’s obligations and responsibilities during the Defects Liability Period. SECTION: MISCELLANEOUS COST CENTRE MS C : MANUALS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:Sub system/system spare parts catalogue as per employer requirement•Any other item(s) considered necessary to comply with the Scope of Work. Milestone No. Work Description Apportioned Amount inclusive of all taxes and duties Weeks for completion of Milestone from commencement date Milestone Activity INR Obtain the “Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: MSC1 Sub-systems/ Systems spare parts catalogue (hardcopy and electronic format) MSC2 Any other item(s)/manual considered necessary to comply with the scope of works Cost Centre Total 0.0 Appendix J: SUMMARY OF BILL OF QUANTITIES Name of work : Contract D2S06: Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS CONTRACT:- D2S06 Name of the Bidder/Bidding firm/company Schedule Schedule Description Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price Including GST INR
22.0 Schedule 1 Project Management and interface management 0.0 0.0 0.0 Schedule 2 Design 0.0 0.0 0.0 Schedule 3 Manufacture,Supply, Delivery of Trainborne ATC system 0.0 0.0 0.0 Schedule 4 NOT USED Schedule 5 Manufacture, Supply, Delivery of Trackside and Station Equipment 0.0 0.0 0.0 Schedule 6 Manufacture, Supply, Delivery of OCC Equipment (including BCC) 0.0 0.0 0.0 Schedule 7 Installation Trackside, Stations and Depot and Onboard 0.0 0.0 0.0 Schedule 8 Testing and Commissioning 0.0 0.0 0.0 Schedule 9 Integrated Testing and Commissioning (Including Service Trials) 0.0 0.0 0.0 Schedule 10 Miscellaneous 0.0 0.0 0.0 Bill of Quantities total 0.0 0.0 0.0 Schedule 1 - Project Management and Interface Management Item No. Description Unit Qty. Unit Price excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST Mainline Trains OCC Price INR Price INR Price INR Price INR Price INR
3Project Management and Interface Management
4Any other item required to meet the scope of work i) 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 SCHEDULE TOTAL CARRIED TO SUMMARY 0.0 0.0 0.0 Schedule 2 - Design Item No. Description Unit Qty. Unit price excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST Mainline OCC Price INR Price INR Price INR Price INR
5Preliminary Design
6Final Design
7Application Design
8Any other item required to meet the scope of work i) 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 SCHEDULE TOTAL CARRIED TO SUMMARY 0.0 0.0 0.0 Schedule 3 - Manufacture, Supply, Delivery of Train-borne ATC system Item no. Description Unit Quantity Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR Price INR
9Onboard ATP/ATO/UTO equipment with all software, connectors, relays, connecting cables and other associated accessories
10Beacon antenna with associated accessories
11Speed detection devices with associated accessories.
12Bidirectional TWC system including antenna, modem, power supply and associated accessories
13DMI with associated accessories
14Any other item required to meet the scope of work i) 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 Schedule 4 - NOT USED Schedule 5 - Manufacture, Supply, Delivery of Trackside and Station Equipment Item no. Description Unit Qty Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR INR
15Supply of High Frequency Axle counter multi section type complete system.
16Non trailable point machines with other accessories
17Signal with accessories a 3 aspect Nos 8.0 0.0 0.0 b Buffer LS 2.0 0.0 0.0 c Route indicator LS 8.0 0.0 0.0
18Power distribution cubicle with accessories a Station with Interlocking logic master units Nos 1.0 0.0 0.0 b Other stations LS 6.0 0.0 0.0
19CBI equipment with all software and associated accessories
20Object controller with all software and associated accessories
21Cable termination rack, Boxes, ESPs, EKTs with associated accessories a Cable Termination Rack LS 7.0 0.0 0.0 b ESPs LS 7.0 0.0 0.0 c EKTs LS 2.0 0.0 0.0
22Control terminal with VDU display and associated accessories
23ATS server with all software and associated accessories
24ATS work stations with accessories
25Wayside ATC sector computer with all software and accessories
26Bidirectional TWC system including Radio zone controller, access points, switches, junction boxes, wires and other associated accessories (CBTC and CCTV) a CBTC Antennas, Junction Box and associated wayside accessories Set 37.0 0.0 0.0 b CCTV Antenna, Access Points and associated wayside accessories Set 37.0 0.0 0.0
27Balises with all associated accessories
28Sign and markers boards with associated accessories
29Cables of all types and other accessories a Cables of all core & types LS 1.0 0.0 0.0 b Cable trays LS 1.0 0.0 0.0 c Miscellaneous of Mainline (HDPE pipes, Conduits, Cable Glands etc) LS 1.0 0.0 0.0
30Any other item required to meet the scope of work a Any other item required to meet the scope of work (Maintenance monitor for CBI) LS 1.0 0.0 0.0 b Cost of GI pipe required for Track crossing of Signalling Cable) 50 mm dia LS 1.0 0.0 0.0 c Any other item required to meet the scope of work i) Connectors, Terminals and installation accessories LS 1.0 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 Schedule 6 - Manufacture, Supply, Delivery of OCC Equipment (including BCC) Item no. Description Unit Qty Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR INR
31ATS server and accessories at OCC
32Traffic controller's workstation, printer and accessories at OCC (as per list in Appendix C of PS)
33Bidirectional TWC system including switches, junction boxes, wires and other associated accessories.
34CER Maintenance Management system including software and accessories
35OCC Overview Display System (ODS)/Large Video Screen (LVS)
36Any other item required to meet the scope of work i) CCTV & Cyber Security Set 1.0 0.0 0.0 ii) Power Distribution Cubicle Set 1.0 0.0 0.0 iii) Signalling & Power Cables- Indoor & Outdoor, Cable trays ,Cable Sealing,etc Set 1.0 0.0 0.0 iv) Connectors, Terminals, Furniture & Misc Indoor & Outdoor installation accessories Set 1.0 0.0 0.0 v) 0.0 0.0 vi) 0.0 0.0 vii) 0.0 0.0 viii) 0.0 0.0 ix) 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 Schedule 7 - Installation Trackside & Stations, OCC/BCC and onboard Item no. Description Unit Qty Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR INR
37Installation of high frequency Axle counter multi-section type complete system.
38Point machine with associated accessories
39Main signals
40Buffer Signal
41Cables and core of all types
42OFC cable & HDPE Pipe
43Installation of equipment at OCC including Overview Display System (ODS)/Large Video Screen (LVS)
44Installation of on-board ATC equipment with all accessories
45Installation of Lineside Balise(s) along with associated accessories
46Installation of Radio Access Points with associated accessories
47All outdoor equipments including associated accessories except 7.1 – 7.10 above for a Stations with Interlocking logic master units LS 1.0 0.0 0.0 b Other stations LS 1.0 0.0 0.0
48All indoor equipments including associated accessories for a Stations with Interlocking logic master units LS 1.0 0.0 0.0 b Other stations LS 1.0 0.0 0.0
49Any other item required to meet the scope of work i) 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 Schedule 8 - Testing and Commissioning Item no. Description Unit Qty Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR INR
50Testing and commissioning of all indoor equipments at stations
51Testing and commissioning of all outdoor equipments at stations
52Testing and commissioning of all equipments at OCC & BCC Stage 1
53Testing and commissioning of all equipments at OCC & BCC Stage 2
54Testing and commissioning of all trainborne equipment Stage 1
55Testing and commissioning of all trainborne equipment Stage 2
56Testing & Commissioning of PSD Interface
57Any other item required to meet the scope of work i) 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 Schedule 9 - Integrated Testing and Commissioning (Including Service Trials) Item no. Description Unit Qty Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR INR
58Integrated Testing and commissioning of all trackside indoor and outdoor train control and signalling system with Rolling stock, track, telecommunication traction and other designated contractors for Stage 1
59Integrated Testing and commissioning of all trackside indoor and outdoor train control and signalling system with Rolling stock, track, telecommunication traction and other designated contractors for Stage 2
60Integrated Testing and commissioning of onboard ATC system with rolling stock, track, traction and other designated contractors for Stage 1
61Integrated Testing and commissioning of onboard ATC system with rolling stock, track, traction and other designated contractors for Stage 2
62Any other item required to meet the scope of work i 0.0 0.0 ii 0.0 0.0 iii 0.0 0.0 iv 0.0 0.0 v 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 Schedule 10- Miscellaneous Item no. Description Unit QTY Unit rate excluding GST Total Price excluding GST GST (IGST/SGST/CGST/UTGST) in INR Total Price including GST INR INR INR
63Supply of contract spares as per appendix P of PS
64As built drawing
65Supervised maintenance
66Defect liability period support for Train control and signalling
67False Flooring of Signalling Equipment Room (SER)
68Any other item required to meet the scope of work i) 0.0 0.0 ii) 0.0 0.0 iii) 0.0 0.0 iv) 0.0 0.0 v) 0.0 0.0 Schedule total carried to summary 0.0 0.0 0.0 CONTRACT-D2S06 APPENDIX K MANDAY RATES (THIS DOCUMENT IS TO BE COMPLETED BY THE BIDDER AND TO BE SUBMITTED AS PART OF PRICING DOCUMENT) Item No. Job Title Rate proposed by the Bidder in Maximum daily rates fixed by employer INR INR
69Indian/Local Staff – Rates for Works Carried Out in Delhi
70Project Manager
71Engineer
72Assistant Engineer NOTE: The above rates will not be considered for bid-evaluation. Bidder cannot exceed the Maximum rates fixed by the employer. APPENDIX- N PRICING OF UNQUALIFIED WITHDRAWAL OF CONDITIONS, QUALIFICATIONS, DEVIATIONS ETC. SUBMITTED IN FORMAT APPENDIX 13 of FORM OF TENDER Name of Work: Contract D2S06 – Design, Supply, Installation, Testing & Commissioning of Interoperable Signalling System for Lajpat Nagar – Saket G-Block Corridor (Line-11) of Delhi Metro Phase-IV MRTS APPENDIX- N PROFORMA FOR COST OF EACH OF MINOR DEVIATIONS / NONMATERIAL NONCONFORMITY (Refer ITT Clause C15.1) Name of Bidder: The following are the particulars of minor deviations / nonmaterial nonconformity from the requirements of the Bidding Documents: Sr. No Clause Deviations Price adjustment for each deviation/s INR Note:1. The Bidder shall indicate price adjustment against each minor deviation/ non material nonconformity in Form as per Appendix-N of Price Bid. This price is the price which the bidder shall reduce from their Bid Price if deviation(s) is/are accepted by the Employer.2. Where there is no deviation, please indicate ‘No Deviations’. In case, Performa of deviations is left as blank, it will be construed that the bidder has not proposed any deviations from the Bidding Documents.3. If the bidder proposes deviations in Bidding Documents, and/or any other terms and conditions of the Bid, other than in this Form, it will have no effect.4. All deviations have been listed and priced in the Price Bid and deviations not priced will be treated as null and void and stand withdrawn. Appendix-32 of FOT:- Proforma for List of Spare for 10 years of system Operation from the last date of taking over of whole works {Refer Clause 52(para 2) of Special Conditions of Contract (SCC)} Name of the Bidder: S. No Description of Items Equipments/ subsystem details Part No. Drawing No. Lead time (in week) Shelf Life No. of Units Principal source of supply (Phone No. & E-mail Id's) Secondary source of supply (Phone No. & E-mail Id's) Unit Cost INR Notes: 1. The bidder shall submit unpriced list of spares for maintenance of supplied system in the format given at Appendix-32 with the technical bid and a corresponding priced list in the Financial Bid. 2. However, due to any reason(s), if the Tenderer is not able to submit unpriced list of spares for maintenance of supplied system in the format given at Appendix-32 in Technical Bid and priced list for the same in the Financial Bid, Tenderer shall submit an undertaking in the format given at Appendix-33 of FOT in the Technical Bid. 3. The rates of these spares (format given at Appendix-32 in FOT) will not be considered for Bid evaluation while assessing the L1 bidder. 4. The schedule of spare parts duly indicating, for each item of spares, its description, part number, drawing number, lead time, shelf life and number of units required for the system after taking over of whole of the works, principal as well as secondary sources of supply, and also the unit price with escalation/de-escalation clause shall be submitted in the format. In addition, contact details like phone number and email id’s for principal source and secondary source may also be provided. 5. Sum of Unit price of sub assembly/card/part of a Sub system should match with the price of complete unit indicated in the BOQ (Pricing Document). All parts of the complete unit should be covered in the list of spares. 6. Proposed methodology of Escalation / De-escalation for Prices / Rates of the Spares shall be provided in price/financial bid. Methodology of Escalation / De-escalation for the Spares Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57381499
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 78.64 Crore
LAST DATE 19-10-2026
Authority
Authority Name Delhi Metro Rail Corporation Limited
Work Description Tender for Design, Supply, Installation, Testing & Commissioning Of Interoperable Signalling System For Lajpat Nagar - Saket G-Block Corridor (Line-11) Of Delhi Metro Phase-Iv Mrts
Basic Detail
Tender No D2S06
Bidding Type Tender
Location
City New Delhi
State Delhi
Key Dates
Publish Date 07 Sep 2026
Submission Date 19 Oct 2026
Open Date 21 Oct 2026
Finance
Tender Value 78.64 Crore
Tender Fee 23600
EMD 39.32 Lakhs
Exemption Not Available
Document List
4fa7bf01-0e69-491b-a32b-6164cff19374.html
BOQ_972155.xls
Tendernotice_1 (10).pdf
Vol-01.pdf
Vol-02.pdf
Vol-03.pdf
Vol-04.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 35 days
Oct 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 37 days

Tender Documents

Download All (ZIP) ↓
html

4fa7bf01-0e69-491b-a32b-6164cff19374.html

xls

BOQ_972155.xls

pdf

Tendernotice_1 (10).pdf

pdf

Vol-01.pdf

pdf

Vol-02.pdf

pdf

Vol-03.pdf

pdf

Vol-04.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders