Tender For Tender For Sop Work Of Augmentation Of Existing 11/0.4 Kv, 25 Kva Distribution Sub-Station To 63 Kva Along With Providing 3-Phase Lt Line From Berdain To Hp Shiva Cluster At Gandharv Under Electrical Section Dramman, Esd Hpsebl, Shahpur. (
Tender Overview
Project Description
Tender for Tender For Sop Work Of Augmentation Of Existing 11/0.4 Kv, 25 Kva Distribution Sub-Station To 63 Kva Along With Providing 3-Phase Lt Line From Berdain To Hp Shiva Cluster At Gandharv Under Electrical Section Dramman, Esd Hpsebl, Shahpur. (T/S No. 55/2026-27 & Scheme Deposit).
BOQ
| Sl. No. | Item Description |
| 1 | 11/0.4 kV, 25 kVA to 63 kVA |
| 2 | Prov. 11/0.4KV 63KVA Transformer new (Outdoor type) |
| 3 | Prov. LT XLPE Cable Unarmoured 3.5X95mm² |
| 4 | Prov. LT panel(Distribution box LT) 63KVA |
| 5 | Prov. Aluminium Thimble |
| 6 | Prov. Danger Plate |
| 7 | Prov. Aluminium Paint. |
| 8 | Prov. Copper Thimble 95 mm2 |
| 9 | Prov. Earthing Set Complete |
| 10 | Prov. Conductor AAAC 7/3.15 mm2 for earthing |
| 11 | Prov. Upgradation of existing infrastructure |
| 12 | Prov. Chain Link fencing , Angle Iron ,Gate etc for transformer fencing |
| 13 | Erection Part |
| 14 | Erection Charges for 63kVA DTR |
| 15 | Erection Charges for Earthing Set |
| 16 | Erection Charges for dismantled |
| 17 | Transportation Charges |
| 18 | LT line |
| 19 | Prov. S/T Poles 8mtr long |
| 20 | Prov. S/T Poles 9mtr long |
| 21 | Prov. Muff with Concrete filling |
| 22 | Prov. AAAC 7/3.15mm (55mm²)mm |
| 23 | Prov. Shackle Insulator |
| 24 | Prov. D-Iron with nut and bolts |
| 25 | Prov. LT Stay Set complete in all respect |
| 26 | Prov. Stay wire7/3.15mm 7.0 Kg per Stay Set |
| 27 | Prov. G.I.wire 8SWG |
| 28 | Prov. Earth Knob |
| 29 | Prov. Egg insulator |
| 30 | Prov. Danger plate |
| 31 | Prov. Full Clamp for stay |
| 32 | Prov. Red Oxide |
| 33 | Prov. Aluminium Paint |
| 34 | Prov. Nuts & Bolts off size |
| 35 | Erection Part |
| 36 | Add Erection Charges of Conductor AAAC 7/3.15 mm2 |
| 37 | Add Erection Charges of steel tubular pole |
| 38 | Add Erection Charges of Stay set (LT) complete |
| 39 | Add Erection Charges of G.I.wire 8SWG |
| 40 | Add Transportation Charges Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender