Tender For Repair/ Maintenance Of Mechanical Transport Vehicle Tata Yodha, Tata 207Di, Maruti Swift, Motorcycle Under Ge Samba
Tender Overview
Project Description
Tender for Repair/ Maintenance Of Mechanical Transport Vehicle Tata Yodha, Tata 207Di, Maruti Swift, Motorcycle Under Ge Samba
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Sep-2026 | corrigendum1 | BOQ | 26-Sep-2026 |
| 2 | 26-Sep-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 03-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Labour charge for door Lh glass machine and lock removing and refitting. Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh blue, reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 2 | LHS Door Glass channel |
| 3 | LHS Glass machine and regulator |
| 4 | Door lock set |
| 5 | Door handle |
| 6 | Door beeding rubber |
| 7 | Door hinges for 2 doors |
| 8 | Cost of labour for front and rear suspension OH and steering bush replacement. |
| 9 | Suspension arm ball joint and stablizer bush set |
| 10 | Pivot bush set & Steering bush set |
| 11 | Fly wheel ring |
| 12 | Tie rod end with lock nut |
| 13 | Steering column bush |
| 14 | shock absorber and bush set |
| 15 | steering box assy. Complete |
| 16 | Cost of labour for removing & refitting of engine alternator assy, leth work & electrical checkup Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 17 | Alternator Brush, bushing set |
| 18 | Alternator relay and diot plate |
| 19 | Head lamp bulb with holder |
| 20 | Alternator bearing set |
| 21 | Front side indicator Assy |
| 22 | Cost of labour for servicing of veh with replacement of cables and transmission and Engine Oil Tata Mobile 207 (Model of 2008,2009), Tata Yodha Josh blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 23 | Fuel filter and oil filter |
| 24 | Speedo meter cable |
| 25 | Accelarator cable set |
| 26 | Gear lever base plate set and boot set |
| 27 | Air filter |
| 28 | Transmission oil |
| 29 | Silencer rubber and packing |
| 30 | Engine Oil |
| 31 | Cost of labour for clutch overhauling and smooth shifting of gears Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 32 | Clutch release bearing |
| 33 | Clutch assembly set |
| 34 | Clutch cylinder assembly lower |
| 35 | Timing belt |
| 36 | Timing chain oil pump |
| 37 | Oil sump with gasket |
| 38 | Connecting bearing set |
| 39 | Flywheel ring |
| 40 | Engine mounting |
| 41 | Cost of labour for removing , overhauling & refitting of Gear box assy. Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 42 | Gear wheel 3rd |
| 43 | Syncronizer ring 3rd gear |
| 44 | Oil seal set |
| 45 | Packing / gasket set |
| 46 | Check nut |
| 47 | 2nd Gear wheel |
| 48 | Syncronizer ring 2nd gear |
| 49 | Cost of labour for wheel alignment and washing of veh. With greasing nipples. Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh Blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 50 | Cost of labour for replacement of front door assembly RHS with all accesiories & duly painted. Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 51 | Glass Machine assembly |
| 52 | RHS door glass |
| 53 | Front RHS Door assembly |
| 54 | Cost of Labour for overhauling of Rear, differential Assy Complete |
| 55 | Crown Wheel pinion Assy |
| 56 | Crown Bearings |
| 57 | Pinion Bearing |
| 58 | Piston |
| 59 | Checknut |
| 60 | Differential Oil |
| 61 | Cost of labour for brakes front and rear OH, rear both side brake drum cuting or leveling in leth machine, wheel greasing and suspension overhaul work with replacement of the following parts. Tata Mobile 207 (Model of 2004, 2009), Tata 407( Model of 1999) reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 62 | Brake Shoe Set |
| 63 | Brake pad set |
| 64 | Ball Joint & wheel joint set |
| 65 | Pivot bush set& Steering bush set |
| 66 | Tie rod end with lock nut |
| 67 | Wiper linkage and blade set |
| 68 | shock absorber and bush set |
| 69 | Wheel cyl. Kit, Wheel cyl. Assy.& W. Oil seal |
| 70 | wheel weight for wheel |
| 71 | Brake oil 250ml |
| 72 | Master Cyl. Assy. Brake |
| 73 | Lock washers |
| 74 | Brake booster assy. |
| 75 | Grease |
| 76 | wheel bearing rear with oil seal |
| 77 | Oil seal set front |
| 78 | wheel studs |
| 79 | Wheel bearing front with oil seal |
| 80 | Dismentaling of FIP pump nozzles and fuel line, fuel tank assembly from the Veh Washing and cleaning with pressure and refiting the same Tata Mobile 207 (Model of 2008, 2009), Tata Yodha Josh blue reinstalling after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge. |
| 81 | Diesel tank lock |
| 82 | Diesel gauge |
| 83 | Cost of labour for, cooling system & mountings replacements radiator chokeup |
| 84 | Radiator mounting |
| 85 | Water Seprator |
| 86 | Coolant |
| 87 | Coolant hose pipe |
| 88 | Water pump assy. |
| 89 | Drain out Low Viscosity engine oil, cleaning of Oil Pan pouring fresh engine Oil, replacing the following items reassembling, fixing in position testing complete including tappet setting and Engine tuning MOTOR CYCLE model 2004, 2009, 2021 for item nos from 193 to 215 |
| 90 | Oil filter |
| 91 | Engine Oil |
| 92 | Air filter |
| 93 | Labor for servicing the veh with replacement of following new parts for making vehicle with smooth functioning :- |
| 94 | Sparking plug |
| 95 | Indicator assemble |
| 96 | Head and tail lamp bulb |
| 97 | Shoe liner |
| 98 | Gasket secondary |
| 99 | Accerator Cable |
| 100 | carburator |
| 101 | Clutch cable |
| 102 | Dismantling of front and rear wheels for alignment, and replacement of following items and make it serviceable |
| 103 | Wheel bearing Make - XKF |
| 104 | Opening of Chain sprocket Assembly and replacement of following unserviceable parts |
| 105 | Chain Sprocket |
| 106 | seat cover |
| 107 | Chain |
| 108 | Labor for servicing the veh with replacement of following new parts for making vehicle with smooth functioning |
| 109 | Front shock Absorbers Assy |
| 110 | Rear Shock Absorbers Assy |
| 111 | Dismantling and disconnecting of unserviceable parts of Suzuki Dzire and re-installing after repair/ replacement of unserviceable parts complete to entire satisfaction of Engr-in-Charge |
| 112 | Engine Oil |
| 113 | Oil filter element |
| 114 | Fuel filter element |
| 115 | Coolant |
| 116 | Carpet mat |
| 117 | Mud flap |
| 118 | Stearing cover |
| 119 | Dismantling the load springs and refitting after repair and giving suitable tensioning complete all as directed for TATA DI 207 vehicle |
| 120 | Denting and painting of vehicle, including welding wherever required for Maruti Suzuki Dzire |
| 121 | Supply and fixing in replacement of maintenance free battery 12 volt 80 Ah including battery leads and initial charging of battery. Make:- Exide/ Amron. |
| 122 | Supply and fixing of stickers for Command sign,Rafter number, unit name on front and back side and maintenance day. Note- Size and design will be as per direction of Engineer in charge. |
| 123 | Supply and fixing of PVC acrylic sheet duly stickered vehicle BA Number. Note- Size and design will be as per direction of Engineer in charge. |
| 124 | Repair to gear by replacing main gear shaft, counter shaft, 2/3rd gear, syncronising ring etc work complete all as directed. |
| 125 | Repair of seat complete including replacement of best quality Rexign seat cover,foot mating , U foam & spring complete all as directed.for TATA DI 207 Vehicle |
| 126 | Denting and painting of vehicle, including welding wherever required complete all as directed.TATA 207, |
| 127 | Note:- The contract sum arrived after deduction of amount of Sch of credit as listed in tender Documents. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender