Tender For Special Repairs To Central Ac Plant In C & R Complex In Under Ge (I) Gos.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Oct 2026
12 days left
EMD
1.25 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ganjam → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Special Repairs To Central Ac Plant In C & R Complex In Under Ge (I) Gos.
BOQ
| Sl. No. | Item Description |
| 1 | M&L for design, supply, installation, commissioning and testing of Chilled water type Air Conditioning plant complete with all accessories all as specified for 3D Class room for Areas hatched in the drawing and marked as AC to meet design parameters given in Annexure ‘A’ having min capacity 3 X 22 TR (min) Two working and one standby comprising of the following :- (a) CHILLER UNIT- Water cooled Chillers meeting ECBC norms each having a capacity of 22 TR (min) comprising of semi hermetic/hermetic scroll type compressors of OEM make only with refrigent circuit, having automatic capacity control,HP/LP and oil pressure cutouts, nacessary insulation to chiller and refrigerant pipe and Sq cage induction motor of adequate capacity for operation on 3-phase 415 +/- 10% Volts 50 Hz A.C. Supply and drive arrangement as per manufacturer's design and standard specifications with shell and tube type water cooled Condenser with MS shell and copper tubes with integral fins complete with safety valve to match the capacity of compressor and insulated shell and tube type water cooled flooded evaporator with MS shell and seamless copper tubes ,flow switches at condenser and chiller outlet, compact refrigeration system including refrigerant piping,Refrigerant and oil ready for use on connecting electric power and cooling tower. Using zero ozone depleting potential and energy efficient as refrigerant preferably such as R-410/ R-407c with all accessories, display/guage panel of various parameters including microprocessor based control pannel for controlling various chiller operating parameters all as per manufacturer's design and specification etc complete -03 Nos ( Two working simultaneously and One Standby) and Earthing with Galvanised iron earth plate electrode 600 x 600 mm & 6 mm thick.The job also includes removal old plant along with all connected items and handover to MES |
| 2 | (b) CONDENSOR WATER STORAGE AND CIRCULATATING SYSTEM : Comprising of following based on undermentioned parameters :-(a) Condensor water inlet Temp - 32.22*C(b) Condensor water outlet Temp - 36.39*C(c) Condensor water flow - 3 gpm/Ton(d) Fouling Factor - 0.0001 Dec 'F' Sq Ft Hr/BTU(e) Maximum Permissible Pressure Drop - 10 M of Water head.(f) Digital temperature thermometer - 01 No |
| 3 | (i) Supply, installation, testing and commissioning of Horizontal split casing condenser water centrifugal pump sets with bronze impeller for condenser water recirculation complete with TEFC ,3 phase sq.cage induction motor with class \\"F\\" insulation working on 415 volts AC base plate,coupling guard,vibration isolators,SSshaft,factory fitted mechanical seal,flexible pipe connector at inlet and outlet etc.conforming to techenical specification and Campatible with above chiller unit of suitable H.P considering flow rate nearly 3 gpm/ton & min efficiency 80 %)-02 No. (each of 100% capacity, two working).(ii) The pipe size of 150 mm and below should be M.S 'C' class as per IS-1239 and above 150 mm shall be ERW pipe confirming to IS-3589-2001 with necessary insulation as applicable of appropriate dia for recirculation of water from condenser to cooling tower and return including connection from make up water tank and water circulating pumps complete with all pipe fittings, like valves tees,elbows flanges including Y strainer in main pipe line,non return valves,Butterfly valve,Gate valve and sluice valve etc all as required at site as per standard practice SSR Part-I and IS - One Lot ( Sizes of pipe selected should be in accordance with optimized system design and specified by the manufacturer). |
| 4 | (iii) Supply, installation, testing and commissioning of Electro static type non chemical scale preventor of suitable capacity having stainless steel shall Sl 304 as Negative elctrode & catalytic (copper) metal electrode with nylon plug as positive electrode including control panel for power supply (Single phase 220 V AC). Equipment shall be capable of removing hardness upto 1000 PPM and making all necessary arrangement all as per manufacturers recommendations. Qty 01 No. |
| 5 | (iv) 02 Nos. FRP Induced draft type cooling tower Cross /counter flow,twin/four cell,direct/gear driven,site erected cooling tower of 100 % capacity based on the parameters given below and complete with PVC fill/louvers,Drift eliminator,TEFC motor of suitable capacity, SPDP, 1.00 Service factor ,propeller fan,FRP sump and steel ladder FRP body to with stand sufficient wind velocity, vibrations and earth quake suitable foe Gopalpur condition. Fan and motor assembly confirming to minimum IP-55 protection for out door operation. Sprinkler head mounted on ball bearings designed to take both Radial and vertical thrust. Mechanical equipment support and all other steel components shall be HDG Steel. etc.The cooling tower shall conform to technical specification given in the tender. The max allowable sound power at a distance of one mtr from the cooling tower shall be less than 75 db. The cooling tower model shall be to suit site and design condition.-02 Nos (One working and one Stand by).Design Parameters / Guidelines :(a) Designed wet bulb temp - 26.1*C(b) Water Inlet Temp -36.39*C(c) Water Outlet Temp -32.22*C |
| 6 | (v) HDPE water tank of suitable capacity not less than 5000 ltr,ISI marked complete with inlet, outlet & overflow connection & float valves etc. Including pipe more than medium grade complete with fitting valves etc for connecting cooling tower sump & storage tank all as required and specified. -01 Nos. NOTE - Necessary platform for make up water tank and connected pipes and piping to be included in the rate quoted against above item. |
| 7 | (c) CHILLED WATER DISTRIBUTION SYSTEM : Comprising of following based on undermentioned parameters/ Guidelines(a) Chilled water inlet Temp - 12.22*C(b) Chilled water outlet Temp - 6.67*C(c) Fouling Factor - 0.0005 BTU(d) Maximum permissible pressure drop 10 Mtrs of Water head |
| 8 | (i) Horizontal split casing water centrifugal pump sets with bronze impeller for chilled water recirculation complete with TEFC 3 phase sq.cage induction motor with class \\"F\\" insulation working on 415 volts AC base plate,coupling guard,vibration isolators,SS shaft,factory fitted mechanical seal, flexible pipe connector at inlet and outlet etc.conforming to technical specification and campatible with above chiller unit of suitable H.P considering suitable flow rate & min efficiency 80 %) -02 Nos. (each of 100% capacity, 01 No. working ).The Chilled water pumps shall also include the cost of thermal insulation.(ii) The pipe size of 150 mm and below should be M.S 'C' class as per IS-1239 and above 150 mm shall be ERW pipe confirming to IS-3589-2001. Rigid section of fibre glass wool uniform density (80 Kgsm Cub Mtr Minimum) and with a 'K' value of not more than 0.034 Kal/h²-m²- C/ 10 Metre at 10°C mean temparature shall be used. |
| 9 | (iii)- Supply installation testing and commissioning of chilled water expansion tank of suitable duly pressurised complete with piping connections, safety relif valve, drain valve, pressure gauge etc complete as per specification. Tank construction as per ASME, Shall Material - Carbon steel, Blader - Heavy duty Butyl Rubber, System Connection - Forged steel with proper insulation as per requirement with safety working pressure of 3.5 Bar minimum.(iv) Supply and install NRV of suitable size and capacity on discharge side of each chiller pump.(v) Condensate drain piping made up of minimum Grade 'B' GI pipe with suitable for the system as proper insulation as per IS and NBC staindards. |
| 10 | (d) HOT WATER DISTRIBUTION SYSTEM : Comprising of following : (i) Supply, installation, testing and commissioning of electricalley operated Hot water generator of suitable capacity having 1 mm thick stainless steel lining with heaters arranged in banks and controlled by electronic controller and thermo stat so that required quantity of hot water at designed temparature and with nominal variations could be supplied including 75 mm thick fibre glass mineral wool insulation finished with 1.25 mm thick G.I sheet clading painted with heat resistant paint.The Hot water generator cylindrical in shape fabricated and of minimum 10 mm thickness in robus welded construction. It shall be completing with necessary supports for free standing floor, such that the bottom of the shell is 300 mm above the floor level.(ii) Supply ,installation,testing and commissioning of Monoblock hot water centrifugal pump sets with bronze impeller for hot water recirculation complete with TEFC Sq .Cage induction motor with class \\"F\\" insulation,base plate,vibration isolators etc. conforming to standard techanical specification . The Hot water pumps shall include thermal insulation.The Capacity of motor shall be decided as per design conditions - 02 Nos of 100 % capacity(both working). |
| 11 | (iii) Supply,Installation testing and commissioning hot water piping the pipe size of 150 mm and below shall be M.S 'C' class as per IS 1239 and above 150 mm shall be ERW pipes confirming to IS- 3589 - 2001. Rigid section of fibre glass wool uniform density (of 80 Kg per Cub Mtr Minimum) and with a 'K' Value of not more than 0.034 K Cal/Hr- Sq Mtr- Dec 'C' / 10 Meter at 10 Dec 'C' meen temparature shall be used, complete with fitting like elbows, tees, reducers, bents, MS flanges, Supports, welding, painting etc including insulation with Rigid performed sections of expended polysterene of uniform density of 24 Kg/m³, 50 mm thick finished with chiken wire mess and 10 mm thick cement sand plaster for interconnection and recirculating water in Hot water circuit - One lot of different sizes and lenghts all required at site.(iv) Supply installation testing and commissioning of expansion tank for hot water circuit of size mimimum 1.0 m x 1.0 m x1.0 m made out of 5 mm M S Sheet duly epoxy coated and insulated with EPS/Fibre glass wool 50 mm thick (min) covered with chiken wire mess and 10 mm cement sand plaster complete with suitable inlet,outlet fitting,over flow connection and control valve etc -01 No. |
| 12 | (e) Double Skin floor mounted AHU with fine filters and heating coil : Supply ,installation, testing and commissioning Factory made Double Skin chilled water Air Handling Unit floor mounted febricated out of extruded aluminium section with 0.6 mm pre-plasticized /pre-coated galvanized steel sheet outside and 0.6 mm galvanized steel sheet inside with DIDW forward curved centrifugal blower in MS Construction, blower section, fan and fan section, fan motor TEFC/SPDP (TEFC for capacity below 15 HP & SPDP for capacity above 15 HP) type suitable for operation on 415 volts ,50 Hz +5% AC supply 4/6 row cooling coil and 2 row heating coil made of aluminium finned copper tube copper header with coil section,pre filter section with non woven synthetic media of 10 micron particle size with an efficiency of 90 % polished stainless steel drain pan made out of 22 G sheet duly insulated complete with motor ,belt drive packaged,guard etc. without face and bypass dampers. The AHU Panels shall be insulated with 25 mm thick and 40 kg/m³ denisity PU foam. The motor and blower assembly shall be mounted on Aluminium extruded section only.The complete AHU Shall conform to standard specification .The face velocity across cooling/heating coil shall be limited to 152 MPM max face velocity across pre filters 100 MPM,max fan outlet velocity- 1800 FPM.The capacity of air handlers shall be decided corresponding to volume of air to be handled for achieving the desired inside condition. Qty of AHU will be as per site requirement based on capacity selected. |
| 13 | Note : (i) All above AHUs shall be provided with proportional cooling digital display type thermostate and snub acting digital display type humidistate and pan type humidifier.(ii) The AHU room are at different levels. The sizes of AHU rooms are clearly marked on drg. Vendors may use all the rooms or less but catering to full dehumidified air qty. In case AHU rooms are not sufficient, ceiling suspended/outdoor type AHUs may be considered to meet the desired condition.(iii) Only pan humidifier are acceptable. Hmidity pump and spray nozzeles not acceptable.(iv) Heating and dehumidification to be carried out with Hot water only. No strip heaters are acceptable.(v) The air flow and coil capacity shall be based air conditioned space load. |
| 14 | (vi) Chilled / Hot water coil shall have 12.5 mm to 15 mm dia copper tube minimum 24 gauge thick with aluminium fins firmly.(vii) Each unit shall be provided with factory assembled filter section containing washable synthetic air filters having anodised frame of suitable capacity.(viii) Maximum pressure drop for clean filter shall be 4 mm WG and 12 mm WG when dirty.(ix) The gauge shall be made from 11 gauge Aluminium.(x) The entire fan with casing will be certified by reputed party acclaimed certifying body like EUROVENT or AHRI and AMCA |
| 15 | (f) AIR CIRCULATING SYSTEM : Entire work for air circulation from AHUs to entire space to be air conditioned shall be done as under :(i) GI DUCTING WORK ( FACTORY MADE/SITE FABRICATED) : Designing supplying,fabrication installation and testing of GSS with zinc coating (Minimum 275 gm/Sq Mtr total on both sides) sheet metal ducting complete with spliter damper,duct damper,vanes etc fabricated out of galvanised sheet class VIII conforming to IS 277- 2003 all as required and as per IS specification and as per approved drawings for supply and return air based on following parameters :(a) Max flow velocity (SA duct) - 400 m/min (Main Duct & 250 m/min Branch Duct)(b) Max flow velocity (RA duct) - 243 m/min(c) Max Friction drop - 1 cm wg/100 m run |
| 16 | The duct fabrication and installation shall confirm to IS 655-1963 (Revised)all dampers,splitters shall be fabricated out of GS sheet of two gauges higher than the duct piece having these fittings - 01 lot as required at site. |
| 17 | (ii) Supplying and fixing of external thermal insulation on ducts with Nitrile Foam insulation in metalized finish,tape and adhesive (pidilite SR-998) of suitable thickness min 25 mm thick with class O fire rating when tested under BS 476 Part 6 & BS 476 Part 7 all as required at site for supply air duct passing through conditioned/ unconditioned space and for return air duct passing through unconditioned space all as per standard practice -01 lot as required at site. Note : The thickness of insulation shall be sufficient to prevent condensation under specified condition. The material shall be CFC & HCFC free. The material shall incorporate microban anti microbial protection to actively inbuilt the growth or mould. The exposed ducts shall be insulated with elastomeric nitrile rubber with an aluminium tail facing. |
| 18 | (iii) Supply installation and testing of powder coated aluminium extruded grills/diffusers ceilling/wall mounting type of size as required at site as per standard norms. The supply air grills/diffusers shall be provided with screw operated opposed blade volume control device made of extruded aluminium in black anodized finish, all grills/diffusers shall have soft continious rubber/foam gasket between the periphery of the grills/diffusers and surface on which it has to be mounted. The return air grills shall have fixed horizontal bars. The thickness of the fixed hole louvers shall be 5 mm in front and the flange shall be 20 mm wide with round edges .The register shall be suitable for concealed fixing and horizontal bars of the grills shall be mechanically crimb from the back to hold them .The square/rectangular cealling diffusers shall be flush fixed pattern for air flow direction - 01 lot as required at site.(a) Maximum velocity at supply air grill / diffuse - 150 M/Min |
| 19 | (iv) Supply and fix fresh/exhaust air louvers min 50 mm deep made of powder coated extruded aluminium construction with bird/insect screen having blades inclined at 45* (degree) on a 40 mm blade pitch - 01 lot as required at site.(v) Supplying and fixing of acoustic lining of duct with 50 mm thick resin bounded fiber glass having a density of 33 kg/m³ or 12 mm thick fibre glass rigid board of density 48 kg/m³ and covered with 0.5 mm thick perforted aluminium sheet all as specified and directed upto five meters of duct from the canvas connection of AHU -01 lot as required at site.Note ; Air handling units shall be connected to duct work by inserting at air inlet and air outlet a double canvas sleeve.Each sleeve shall be minimum 4\\" long securely bounded and bolted to duct and units. Each sleeve shall be made smooth and the connecting duct work rigidly held in line with unit inlet or outlet.(vi) Supplying and fixing of necessary motorised type fire damper with spring return type actuator for supply air duct and fusible link type fire damper as per UL 555 for return air path for fire protection including maping necessary electrical interlocking arrangement with fire damper and evaporation fan motor to shut down the AC fan on detection of fire. |
| 20 | (g) Instrument and various controls for refrigeration system and water line like comprising of water pressure gauge industrial stem type thermometer, dry and wet bulb thermometer humidistate,thermostate,Y stainer, non return valve, butterfly valve, ball valve, 3 way valve, balancing valve, air bent etc. as required including fixing complete. |
| 21 | (h) Complete oil and refrigerant required up to successful completion of pH-II test |
| 22 | (j) Microcomputer based Controller Controls at Plant Room as per manufacturer design consisting of following :-(i) Adoptive control Micro Processor with unit control panels to ensure and implement compressor protective system based on temperature and pressure criteria and to perform unit control functions, limit functions, sequence of operation, compressor motor control, compressor motor protection, and the starter functions. The system will have adequate pre-programmed reports for compressor, refrigerant ,chillers and should be able to accept external inputs from sensors etc. with display facility in both English and Hindi(this will be composite unit of chiller unit).(ii) Unit control module capable of sensing and controlling variables that govern the operation of chillers , motor current, evaporator temperature etc with tracer system for identification of locations all from the control having Intelligent add-ons to monitor and diagnose failures based on various parameters including its corrections and display. |
| 23 | (K) ELECTRIC WORKS COMPRISING OF :-(i) - Supply, installation, testing and commissioning of free floor mounted factory made and tested (including proto type bearing CPRI test certified) Indoor type confirming to IS-8623 Part-I 1993 factory fabricated cubical panel board made out of 2 mm thick CRCA sheet duly compartmentalized to accommodate incomer MCCB and TPN copper bus bar of rating not less than 1.5 times the rated capacity of the incomer MCCB. The TPN bus bar shall be insulated with colour coated heat shrinkable sleeve and shall be mounted on EPPOXY insulators of size not less than 50x50 mm conical type at a maximum interval of 500 mm through out the length of the TPN bus bar . The cubical incomer MCCB as well as outgoing MCCB/MCB shall have copper TPN extension links of current carrying capacity not less than 1.5 times the rated capacity of individual feeders. The extension links shall not be less than 300mm long supported on DMC/EPPOXY insulators having provision for termination of incomer and outgoing cables. All interconnections between the main bus bar as well as outgoing feeders shall be carried out with TPN copper bus bar of rating not less than 1.5 times the rated capacity of individual outgoing feeders. All bus bar should be insulated with heat shrinkable PVC sleeves. All control wires shall be with 4 sqmm multi stranded copper conductors FRLS cables IS 694 marked and shall be properly bunched,tied,ferruled for proper identification and crimped with adequate size of lugs. |
| 24 | The cubical panel shall have a bottem channel of size 75x40mm duly coated with zinc metal coating having thickness not less than 100 microns . A detachable pre-drilled gland plate of thickness not less than 3mm zinc metal coated should be used at the bottom for entry of armoured cable of adequate size with glands. The panel should be front and back open able /lockable and shall have louvers and air vent gasket for natural flow of air ,3mm XLPE adhesive gasket shall be used to make panel board completely vermin proof. The opening between the busbar chamber and the feeder section shall be shrouded with Baklite / Hylam sheet with minimum 3 mm thickness. The panel should be powder coated complete and consisting of the following items mounted in seperate compartment shelves . |
| 25 | (A) INCOMER - 4 Pole MCCB of suitable capacity breaking capacity 35 KA, with Digital energy Panel meter 4 in 1 to measure current and voltage of suitable rating 3 ph power and power factor having CT and built in selector switch phase indication light (LED type) with protection fuse ,ON/OFF trip indicating light with protection fuse -01 Set, Make-L&T/Siemens/Legrand/GE. |
| 26 | (B) OUT GOING (a) For 03 Nos water cooled chilling machine - 03 pole MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps of suitable rating with digital Amp meter with 3 CT and selector switch ,ON/OFF trip indicating light with protection fuse -03 Set.(b) For 02 Nos chilled water pump - 03P MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps. The openings between busbar chamber and the feeder section shall be with baklite/ Hylum sheet with minimum 3 mm thickness of suitable rating with motor starter contactor suitable for chilled water pump,over load relay ,start/stop push buttons, digital Amp meter with 3 CT and selector switch ,ON/OFF trip indicating light with SP MCB ,single phase preventer and auto/manual mode selector switch -02 Set. |
| 27 | (c) For 02 Nos Condensor water pump - 03P MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps of suitable rating with motor starter contactor suitable for condensor water pump,over load relay ,start/stop push buttons, digital ammeter with 3 CT and selector switch ,ON/OFF trip indicating light with SP MCB ,single phase preventer and auto/manual mode selector switch -02 Set.(d) For 01 Nos. Cooling Tower - 03 P MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps of suitable rating with motor starter contactor suitable for cooling tower over load relay, start/stop push buttons, digital ammeter with 3CT and selector switch - 01 Set |
| 28 | (e) For two Nos Hot water pump sets - 3P MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps of suitable rating with motor starter contactor suitable for Hot water pump,over load relay ,start/stop push buttons, digital ammeter with 3 CT and selector switch ,ON/OFF trip indicating light with SP MCB ,single phase preventer and auto/manual mode selector switch -02 Set.(f) For 01 No. Hot water Generator - 4 pole MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps of suitable rating with ON/OFF trip indicating lights -01 Set. |
| 29 | (g) For AHU - 03P MCCB 25 KA breaking capacity for I cs = I cu grater than 100 Amps and 16 KA for I cs = I cu less than 100 Amps of suitable rating for controlling all AHUs from central control panel in the plant room including independent control of each AHU by providing MCB of suitable rating including ON/OFF/Trip indicating light- 01 Set.(h) Control and interlocking accessories as required.(i) Provision of Electrical Sub panel for each AHUs made out of 2 mm thick CRCA sheet wall mounted type powder coated consisting of TPN MCCB with DOL starter of suitable rating ,over load relay ,start/stop push buttons ,phase indication lights with protection fuse, ON/OFF/Trip indication lights with protection fuse ,single phase preventer and auto/manual mode selector switch including Control and interlocking accessories all as required for each AHU. |
| 30 | (ii) Supplying,laying,testing and commissioning of power rating XLPE insulated ,PVC Sheathed aluminium conductor armoured cable of 1100 Volts grade including cable end termination with brass compression glands and aluminium lugs for connecting chilling machine ,Hot water generator,Condenssor,water pump,Chilled water pump,Cooling Tower, Air Handling Units etc. The size of core of cable shall be selected based on rating of electrical equipment to be connected - 01 Lot. |
| 31 | Note : Wherever required lader type 16 G, GI perforated U shaped channel 40 mm x 20 mm cable tray of required size shall be provided without any extra cost. |
| 32 | (iii) M&L for providing earthing grid including earthing work suitable for local soil conditions as per IS for acheiving desired earth resistance and marking necessary earth connections 2 Nos of each electrical eqpts with GI strip/GI wire/Aluminium Strip of suitable size all as per relevant IS - 1 Set(iv) Supplying,laying,testing and commissioning of control cabling PVC insulated copper conductor of 1100 volts grade armoured /unarmoured of suitable size and core for operation of various controls,associated with microcomputer based control of chilled water AC plant all as required at site - one lot.(v) Provision of Three phase Electric KWH meter of suitable capacity.(vi) Rubber matting of required size and sepcification as per IS for plant roomNote : The Contractor has to provide fire shunt relay contact in his panel wherever necessary along with auto/manual mode selector switch in the outgoing feeder for AHU fan to take fire input signal(potential free contact) cost shall be included in the price quoted by the firm. |
| 33 | 2- The main electric supply will be provided in A/C Plant room by the department through cable which shall be connected to the incommer MCCB of the main panel by the contractor. |
| 34 | (m) CIVIL WORKS COMPRISING OF:-(i) Foundation to equipment such as package chillers AHUS,HWG LT Panel board, Pump sets, cooling tower, pipeline, common headers etc.including any other masonery work connected with the installation of equipments.(ii) Excavation and earth work for pipe work, cable work, foundation support etc.(iii) Opening in walls for duct work, grills/diffusers/ blanking plates etc, finishing of openings including painting/whitewash work to match the interior decoration existing work all as specified. |
| 35 | (iv) Modification / refixing of false ceiling for fixing ducts/grills/diffusers and ensure no leakage of conditioned air etc as required.(v) Beadings of standard make and quality as directed by GE on all doors and windows to avoid air losses if required.(vi) Making good any surface modified or disturbed on account of laying pipe lines of all kind, cables or ducts all to the full satisfaction of GE. Please Enable Macros to View BoQ information |
| 36 | (iv) Modification / refixing of false ceiling for fixing ducts/grills/diffusers and ensure no leakage of conditioned air etc as required.(v) Beadings of standard make and quality as directed by GE on all doors and windows to avoid air losses if required.(vi) Making good any surface modified or disturbed on account of laying pipe lines of all kind, cables or ducts all to the full satisfaction of GE. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.