Tender For Capacity Enhancement Of 110 Kv Palakkad-Vennakkara 110Kv Dc Line From 220 Kvsubstation Palakkad To 110 Kv Substation Vennakkara By Upgradation Of Acsr Wolf To Equivalent Highperformance Conductor (Al59)
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Sep 2026
16 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
8850
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Palakkad → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Capacity Enhancement Of 110 Kv Palakkad-Vennakkara 110Kv Dc Line From 220 Kvsubstation Palakkad To 110 Kv Substation Vennakkara By Upgradation Of Acsr Wolf To Equivalent Highperformance Conductor (Al59)
BOQ
| Sl. No. | Item Description |
| 1 | Structure Material |
| 2 | Conductor AL-59 18.13 mm dia |
| 3 | S/T HARDWARE FITTING WITH ARCING HORN FOR HTLS AL59 |
| 4 | D/T HARDWARE FITTING WITH ARCING HORN FOR HTLS AL59 |
| 5 | S/S HARDWARE FITTING WITH ARCING HORN FOR HTLS AL59 |
| 6 | VIBRATION DAMPER FOR ACSR HTLS AL59 |
| 7 | ARMOUR ROD FOR HTLS AL59 |
| 8 | 110kV ,90KN SILICON RUBBER HOUSED COMPOSITE POLYMER INSULATOR |
| 9 | 110kV ,70KN SILICON RUBBER HOUSED COMPOSITE POLYMER INSULATOR |
| 10 | Structure Labour |
| 11 | Paving out, stringing and tensioning OF POWER CONDUCTORS including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at tension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers hire charges of tractor and stringing tools, etc. Complete. ( 6 Line AL59 wolf 195mm Double circuit ( Rate for 6 panther x0.5369 Kg/M /0.976 Kg/M) Required for AL59 195sqmm conductor for capacity enhancement of 110 kv palakkad-vennakkara 110kv dc line from 220 kv substation palakkad to 110 kv substation vennakkara by upgradation of acsr wolf to equivalent high performance conductor. |
| 12 | Dismanling 6 Line wolf Double circuit from the tower detaching the clamps,connectors and line accessories from the conductor,winding and stacking the same at site. Take 50% of the stringing rate vide item no 64 |
| 13 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 14 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 15 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 16 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 17 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works |
| 18 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral,for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and veyance of all materials (except poles) from stacking place. |
| 19 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 20 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place |
| 21 | Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection - By lorry for every additional km or part thereof above 10km, for Line and Earth Conductor |
| 22 | Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by head load and initial lift of 1.5m at each end etc. - Manual labour for 1km for Insulators and accessories, power conductor accessories and earth conductor accessories etc Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysSep 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.