Bids Are invited for Repair And Overhauling Service - Removal Installation And Commissioning Of 18 Atus And 44 Hes Onboard In Ship; Any Other Suitable Brand; Yes; Buyer Premises - Removal Of Old Atus , Removal Of All Pipes Connected To Atu , Removal
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Removal Installation And Commissioning Of 18 Atus And 44 Hes Onboard In Ship; Any Other Suitable Brand; Yes; Buyer Premises - Removal Of Old Atus , Removal Of All Pipes Connected To Atu , Removal Of All Ducting Connected To Atu , Removing All Associated Cabling , Removing Of Old Control Panel , Provide Drawing For Modification Of Existing Foundation To Suit New Atu And Panel , Fitment Of Shock Mounts On Foundation , Dismantling Of Atu As Required In Rac Workshop , Shifting And Lowering Of New Atu On The Foundation , Assembly Of Atu Upon Lowering Of Atus , Installation Of Atu On The Foundation , Modification Of Ducting Piece Connected To Atu To Meet The Interface Requirements , Integration Of Ducting Pieces To Atu , Integrating Of Associated Piping With Atu , Installation Of Flexible Hoses On Chilled Water Piping Connected To Atu , Interconnection Of All Removed Power And Control Cables , Installation Of Chilled Water Side Instruments As Per P&Id , Pressure Testing Of Cooling Coils Of Atu @ 9Bar For 20Min , Removal Of Old Hes , Removal Of All Pipes Connected To He , Removal Of All Ducting Connected To He , Removing All Associated Cabling , Removing Of Old Control Panel , Provide Drawing For Modification Of Existing Foundation To Suit New He And Panel , Fitment Of Shock Mounts On Foundation , Dismantling Of He As Required In Rac Workshop , Shifting And Lowering Of New He On The Foundation , Assembly Of Atu Upon Lowering Of Hes , Installation Of He On The Foundation , Modification Of Ducting Piece Connected To He To Meet The Interface Requirements , Integration Of Ducting Pieces To He , Integration Of Associated Piping With He , Installation Of Flexible Hoses On Chilled Water Piping Connected To He , Interconnection Of All Removed Power And Control Cables , Installation Of Chilled Water Side Instruments As Per P&Id , Pressure Testing Of Cooling Coils Of He @ 9 Bar For 20Min , Mandatory Spares. 32 Nb Flexible Hoses For Atu And He , Mandatory Spares. 25 Nb Flexible Hoses For Atu And He , Mandatory Spares. 20 Nb Flexible Hoses For Atu And He , Mandatory Spares. 15 Nb Flexible Hoses For Atu And He , Mandatory Spares. Supply And Return Air Ducting Connection – Mild Steel , Mandatory Spares. Supply And Return Chilled Water Temp. Gauge
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Removal of old ATUs | Removal of old ATUs |
| 2 | Removal of all pipes connected to ATU | Removal of all pipes connected to ATU |
| 3 | Removal of all ducting connected to ATU | Removal of all ducting connected to ATU |
| 4 | Removing all associated cabling | Removing all associated cabling |
| 5 | Removing of old control panel | Removing of old control panel |
| 6 | Provide drawing for modification of existing foundation to suit new ATU and panel | Provide drawing for modification of existing foundation to suit new ATU and panel |
| 7 | Fitment of shock mounts on foundation | Fitment of shock mounts on foundation |
| 8 | Dismantling of ATU as required in RAC workshop | Dismantling of ATU as required in RAC workshop |
| 9 | Shifting and lowering of new ATU on the foundation | Shifting and lowering of new ATU on the foundation |
| 10 | Assembly of ATU upon lowering of ATUs | Assembly of ATU upon lowering of ATUs |
| 11 | Installation of ATU on the foundation | Installation of ATU on the foundation |
| 12 | Modification of ducting piece connected to ATU to meet the interface requirements | Modification of ducting piece connected to ATU to meet the interface requirements |
| 13 | Integration of ducting pieces to ATU | Integration of ducting pieces to ATU |
| 14 | Integrating of associated piping with ATU | Integrating of associated piping with ATU |
| 15 | Installation of flexible hoses on chilled water piping connected to ATU | Installation of flexible hoses on chilled water piping connected to ATU |
| 16 | Interconnection of all removed power and control cables | Interconnection of all removed power and control cables |
| 17 | Installation of chilled water side instruments as per P&ID | Installation of chilled water side instruments as per P&ID |
| 18 | Pressure testing of cooling coils of ATU @ 9bar for 20min | Pressure testing of cooling coils of ATU @ 9bar for 20min |
| 19 | Removal of old HEs | Removal of old HEs |
| 20 | Removal of all pipes connected to HE | Removal of all pipes connected to HE |
| 21 | Removal of all ducting connected to HE | Removal of all ducting connected to HE |
| 22 | Removing all associated cabling | Removing all associated cabling |
| 23 | Removing of old control panel | Removing of old control panel |
| 24 | Provide drawing for modification of existing foundation to suit new HE and panel | Provide drawing for modification of existing foundation to suit new HE and panel |
| 25 | Fitment of shock mounts on foundation | Fitment of shock mounts on foundation |
| 26 | Dismantling of HE as required in RAC workshop | Dismantling of HE as required in RAC workshop |
| 27 | Shifting and lowering of new HE on the foundation | Shifting and lowering of new HE on the foundation |
| 28 | Assembly of ATU upon lowering of HEs | Assembly of ATU upon lowering of HEs |
| 29 | Installation of HE on the foundation | Installation of HE on the foundation |
| 30 | Modification of ducting piece connected to HE to meet the interface requirements | Modification of ducting piece connected to HE to meet the interface requirements |
| 31 | Integration of ducting pieces to HE | Integration of ducting pieces to HE |
| 32 | Integration of associated piping with HE | Integration of associated piping with HE |
| 33 | Installation of flexible hoses on chilled water piping connected to HE | Installation of flexible hoses on chilled water piping connected to HE |
| 34 | Interconnection of all removed power and control cables | Interconnection of all removed power and control cables |
| 35 | Installation of chilled water side instruments as per P&ID | Installation of chilled water side instruments as per P&ID |
| 36 | Pressure testing of cooling coils of HE @ 9 bar for 20min | Pressure testing of cooling coils of HE @ 9 bar for 20min |
| 37 | Mandatory Spares. 32 NB Flexible hoses for ATU and HE | Mandatory Spares. 32 NB Flexible hoses for ATU and HE |
| 38 | Mandatory Spares. 25 NB Flexible hoses for ATU and HE | Mandatory Spares. 25 NB Flexible hoses for ATU and HE |
| 39 | Mandatory Spares. 20 NB Flexible hoses for ATU and HE | Mandatory Spares. 20 NB Flexible hoses for ATU and HE |
| 40 | Mandatory Spares. 15 NB Flexible hoses for ATU and HE | Mandatory Spares. 15 NB Flexible hoses for ATU and HE |
| 41 | Mandatory Spares. Supply and return air ducting connection – Mild steel | Mandatory Spares. Supply and return air ducting connection – Mild steel |
| 42 | Mandatory Spares. Supply and return chilled water temp. gauge | Mandatory Spares. Supply and return chilled water temp. gauge |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender