Tender For Strengthening Of Two Nos Psc Joint 900Mm Ss Line Near Banshi Dhaba And Other 750Mm Dia Sludge Line Near Gate No-02 Of Clear Water Complex And Alsow Repairing Of 03 Nos Airvalves 4 Ci Line With Other Allied Works.
Tender Overview
Project Description
Tender for Strengthening Of Two Nos Psc Joint 900Mm Ss Line Near Banshi Dhaba And Other 750Mm Dia Sludge Line Near Gate No-02 Of Clear Water Complex And Alsow Repairing Of 03 Nos Airvalves 4 Ci Line With Other Allied Works.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing andramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing andramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depthbeyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. |
| 4 | Hire and labour charges for shoringwork (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact withsupported earth is to be measured.) (This item should be executed on specific direction of the Enginner incharge).(a) Depth upto 1.5 m. |
| 5 | Hire and labour charges for shoringwork (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact withsupported earth is to be measured.) (This item should be executed on specific direction of the Enginner incharge)(b) For additional depthbeyond 1.5 m. and upto 3.00 m |
| 6 | Hire and labour charges for shoringwork (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact withsupported earth is to be measured.) (This item should be executed on specific direction of the Enginner incharge)(c) For additional depth beyond 3.00 m. |
| 7 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. |
| 8 | Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing(AMP-32) including supplying. Fitting and fixing all complete.. |
| 9 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage andmaking wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shallbe executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied inabsolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] |
| 10 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. |
| 11 | Lead jointing to C.I pipes and specials excluding cost of lead and spun yarnall complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge,[Lead shall be supplied departmentally to the Agency at free of cost as per availability]Diameter in mm 100mm dia |
| 12 | Supply of G. I. pipes of TATA make including necessary sockets (d)32 mm dia. (i) Light quality |
| 13 | Supply of G. I. pipes of TATA make including necessary sockets (b)20 mm dia. (i) Light quality |
| 14 | Repair of Air valve by supplying ebonite and- rubber ball. gasket. nuts and bolts with washers and labour all complete Diameter in mm 200 |
| 15 | Sub Total |
| 16 | GST 9% |
| 17 | GST 9% |
| 18 | CESS 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender