Tender For K: Annual Rate Contract For Work Of Repair Of Pipeline, Tubewells, Pumpset In Jjy Schemes Of Sub Division Neem Ka Thana Under The Jurisdiction Of Phed Division Neem Ka Thana.
Tender Overview
Project Description
Tender for K: Annual Rate Contract For Work Of Repair Of Pipeline, Tubewells, Pumpset In Jjy Schemes Of Sub Division Neem Ka Thana Under The Jurisdiction Of Phed Division Neem Ka Thana.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 14-Sep-2026 | Time Extend | Date | 16-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Maintenance of tubewells which includes round the clockmonitoring of tubewells of all sizes, complete repairs /rewinding of submersible pump sets including cost ofmaterial components required to repair pumpsets, starters,meters etc. of electric panel of tube wells, Lowering andunlowering of pumpsets complete in all respect,maintenance of log-books & Histroy sheet as directed byEngineer-in-charge for tubewell per month. |
| 2 | 11 HP to 12.5 HP (56 X 12 Months) |
| 3 | 13 HP to 15 HP (20 X 12 Months) |
| 4 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department. |
| 5 | Minimum labor for a following KMs pipelines to be deployed. |
| 6 | (71 km X 12 Months) 51 km to 100 km- one fitter-II & Two beldar Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender