Tender For Provision Of Ground Mounted Solar Power Plant At Mbb Airport, Agartala.
Tender Value
14.85 Crore
Estimated cost
Bid Submission
26 Sep 2026
15 days left
EMD
29.72 Lakhs
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
tripura → Tripura
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Provision Of Ground Mounted Solar Power Plant At Mbb Airport, Agartala.
BOQ
| Sl. No. | Item Description |
| 1 | SH- I: DSITC WorkDesign, Detailed Engineering, Supply, Installation, Testing and Commissioning (DSITC) of Grid Connected ground mounted Solar PV Power Generation Plant of 1600 kWp capacity with structure made up of aesthetically appealing hot dip GaIvanised MS structure with PV modules of minimum 560Wp, Half-Cut Mono Crystalline TopCon, Minimum Efficiency: 21% at STC, suitable for maximum 1500 VDC, fixed in anodized aluminium frame complete as required including elevated structural support systems, foundation for all components after proper soil investigation/treatment as per site conditions, proper Communication, Data, Control, Power Cables & Safety System for reverse power protection, min. IP65 rated DC DB/JB for connection of modules to inverters through DC copper cables of suitable capacity laid in HDPE pipes, Power Conditioning Units, String Monitoring Units, Meters, Surge & Lightning Protection System (as per NBC 2016), Earthing of modules & structures, extraction of groundwater through borewell and further suitable treatment, Water cleaning system with proper drainage, 33 kV HT evacuation & injection at suitable injection point as per site conditions through cables, switchgears, power transformers of suitable capacity for minimal voltage drop/losses, End terminations at 33 kV HT panel and cable laying for connection to existing electrical installations (cable laying should be in HDPE pipes of suitable size as per site conditions, MNRE guidelines & relevant IEC 62548 & IEC 61215 ,62804), Auxiliary & Control Supply System, Data Acquisition system (complete with Hardware, Software, Switchgear, Cabling, Air Conditioning of room etc.) for local & remote monitoring, communication & control cabling alongwith providing Fire Extinguishers of required numbers & capacity, LED type Internal and External Lighting for general illumination in Solar Plant, Control Room, Inverter/Transformer Room etc. i/c wiring / cabling, MCBs, DBs, Switches etc, Plant Solar Radiation & Environment Monitoring System, Shadow Analysis, Glare Analysis for safe flight operations, Clearance from DISCOM and approvals from other Statutory Agencies, Transportation & Insurance of material etc. and any other items/accessories/clearances/services required for successful commissioning of power plant on \\"Turnkey basis\\" complete in all respects as per the technical specifications, terms & conditions specified in the tender document and handing over the Solar PV Power Generation System to AAI. The complete system shall be under Defect Liability Period (DLP) of 02 years.Scope of work also includes the following: 1) Supply, Installation, Testing and Commissioning (SITC) of 33 kV HT Panel comprising of 03 nos HT breaker at Evacuation Point.2) Supply and laying of 33 kV power cable of suitable cross section in ground by using HDPE pipe through Horizontal Directional Drilling (HDD) from Solar Power Plant to HT Evacuation point. |
| 2 | SH-II: Operation and routine maintenance after DSITC.Operation and routine maintenance viz regular cleaning, servicing, daily monitoring of system, compilation of solar generation and serviceability reports, minor troubleshooting etc of solar power plant for 12 years after completion of DSITC work (including DLP of 02 years) by deploying following manpower at site along with providing required tool and consumables for 6 days a week (including Saturday & Gazetted Holidays but excluding Sunday) to keep the system in healthy, serviceable state as per OEM recommendation, good engineering practices and as tender terms & conditions etc.complete as required and to the satisfaction of Engineer-in- Charge.a) Skilled - 1 No. in General Shift.b) Unskilled - 1 No. in General Shift. |
| 3 | 1st year |
| 4 | 2nd year |
| 5 | 3rd year |
| 6 | 4th year |
| 7 | 5th year |
| 8 | 6th year |
| 9 | 7th year |
| 10 | 8th year |
| 11 | 9th year |
| 12 | 10th year |
| 13 | 11th year |
| 14 | 12th year |
| 15 | SH-III: AICMC after DLPAll-inclusive comprehensive maintenance contract (AICMC) for 10 years (after completion of DLP of 02 years) of the above installed solar power plant including preventive & breakdown maintenance,monthly visit by specialized person / Technician for AICMC including all spares, consumables etc. as per OEM recommendation, good engineering practices and as provided under tender specifications, terms & conditions etc. to keep the system in healthy, serviceable state etc. complete as required and as per the directions of Engineer-in-Charge. |
| 16 | 1st year after DLP |
| 17 | 2nd year after DLP |
| 18 | 3rd year after DLP |
| 19 | 4th year after DLP |
| 20 | 5th year after DLP |
| 21 | 6th year after DLP |
| 22 | 7th year after DLP |
| 23 | 8th year after DLP |
| 24 | 9th year after DLP |
| 25 | 10th year after DLP 23 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 04, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysOct 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender