Bids Are invited for Custom Bid For Services - ---- - Clearing Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of Girth Up To 30 Cm Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Up To A Dis
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Clearing Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of Girth Up To 30 Cm Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Up To A Distance Of 50 M Outside The Periphery Of The Area Cleared. , Earth Work In Excavation By Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan), Including Dressing Of Sides And Ramming Of Bottoms, For All Lift, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level With 1:2:4 (1 Cement: 2 Coarse Sand (Zone-Iii) Derived From Natural Sources: 4 Graded Stone Aggregate 20 Mm Nominal Size Derived From Natural Sources) , Random Rubble Masonry With Granite Stone In Foundation Including Levelling Up With Cement Concrete 1:6:12 (1 Cement: 6 Coarse Sand: 12 Graded Stone Aggregate 20 Mm Nominal Size) Up To Plinth Level , Random Rubble Masonry Granite Stone For Second Step In Foundation And Plinth Including Levelling Up With Cement Concrete 1:6:12 (1 Cement: 6 Coarse Sand: 12 Graded Stone Aggregate 20 Mm Nominal Size) Up To Plinth Level , Coursed Rubble Masonry With Dressed Hard Stone In Superstructure Above Plinth Level With Cement Mortar 1:6 With Vertical Cavity Of 15 X 15 X 30 Cm At Predefined Intervals For Grill Post Insertion , Providing And Laying Plain Cement Concrete 1:1.5:3... For Core Grouting Around Grill Posts , Providing, Fabricating, Hoisting, And Fixing In Position M.S. Ornamental Grating/Fence As Per Drawing, Including Cutting, Welding, Grinding, And Finishing Joints. The Structural Composition Per 2-Meter Bay Length Includes: Vertical Posts: Built-Up Columns Using Ismc 100X100x6 Mm Channels (2 Nos.), Length 1.6M, Weighing 9.20 Kg/M, Horizontal Rails: Top/Bottom Runners Using Isa 50X50x6 Mm Equal Angles (2 Nos.), Length 2.0M, Weighing 4.50 Kg/M, .Side Framing: Vertical Borders Using Isa 50X6 Mm Equal Angles (2 Nos.), Length 1.2M, Weighing 2.40 Kg/M, .Vertical Infill Bars: Pickets Made Of 12 Mm M.S. Square Bars (19 Nos.), Length 1.2M With Spiked Tops, Spaced At 100 Mm Center -To- Center, Weighing 1.13 Kg/M. Includes Surface Preparation, Scaffolding, And Hardware Etc. Complete , Providing And Laying Stone Coping Of Specified Thickness Over A Finished Wet Volume Bedding Of 20Mm Average Thickness Consisting Of Cement Mortar 1:4 (1 Part Cement: 4 Parts Coarse Sand) , Pointing On Stone Work With Cement Mortar 1:3 (1 Cement: 3 Fine Sand) , Provision For Apply Enamel Painting For Grills 2 Coats Over One Coat Of Metal Primer.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 2 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level with 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level with 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 4 | Random rubble masonry with granite stone in foundation including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth level | Random rubble masonry with granite stone in foundation including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth level |
| 5 | Random rubble masonry granite stone for second step in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth level | Random rubble masonry granite stone for second step in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth level |
| 6 | Coursed rubble masonry with dressed hard stone in superstructure above plinth level with cement mortar 1:6 with vertical cavity of 15 x 15 x 30 cm at predefined intervals for grill post insertion | Coursed rubble masonry with dressed hard stone in superstructure above plinth level with cement mortar 1:6 with vertical cavity of 15 x 15 x 30 cm at predefined intervals for grill post insertion |
| 7 | Providing and laying Plain Cement Concrete 1:1.5:3... for core grouting around grill posts | Providing and laying Plain Cement Concrete 1:1.5:3... for core grouting around grill posts |
| 8 | Providing, fabricating, hoisting, and fixing in position M.S. Ornamental Grating/Fence as per drawing, including cutting, welding, grinding, and finishing joints. The structural composition per 2-meter bay length includes: Vertical Posts: Built-up columns using ISMC 100x100x6 mm channels (2 Nos.), length 1.6m, weighing 9.20 kg/m, Horizontal Rails: Top/bottom runners using ISA 50x50x6 mm equal angles (2 Nos.), length 2.0m, weighing 4.50 kg/m, .Side Framing: Vertical borders using ISA 50x6 mm equal angles (2 Nos.), length 1.2m, weighing 2.40 kg/m, .Vertical Infill Bars: Pickets made of 12 mm M.S. square bars (19 Nos.), length 1.2m with spiked tops, spaced at 100 mm center -to- center, weighing 1.13 kg/m. includes surface preparation, scaffolding, and hardware etc. complete | Providing, fabricating, hoisting, and fixing in position M.S. Ornamental Grating/Fence as per drawing, including cutting, welding, grinding, and finishing joints. The structural composition per 2-meter bay length includes: Vertical Posts: Built-up columns using ISMC 100x100x6 mm channels (2 Nos.), length 1.6m, weighing 9.20 kg/m, Horizontal Rails: Top/bottom runners using ISA 50x50x6 mm equal angles (2 Nos.), length 2.0m, weighing 4.50 kg/m, .Side Framing: Vertical borders using ISA 50x6 mm equal angles (2 Nos.), length 1.2m, weighing 2.40 kg/m, .Vertical Infill Bars: Pickets made of 12 mm M.S. square bars (19 Nos.), length 1.2m with spiked tops, spaced at 100 mm center -to- center, weighing 1.13 kg/m. includes surface preparation, scaffolding, and hardware etc. complete |
| 9 | Providing and laying stone coping of specified thickness over a finished wet volume bedding of 20mm average thickness consisting of Cement Mortar 1:4 (1 part cement: 4 parts coarse sand) | Providing and laying stone coping of specified thickness over a finished wet volume bedding of 20mm average thickness consisting of Cement Mortar 1:4 (1 part cement: 4 parts coarse sand) |
| 10 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) |
| 11 | Provision for apply enamel painting for Grills 2 coats over one coat of metal primer. | Provision for apply enamel painting for Grills 2 coats over one coat of metal primer. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender