Defence Government Departments Closing in 18 days TDR #57355995

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Ferry Craft Vihar; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleane

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Sep 2026
18 days left
EMD
32.77 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Ferry Craft Vihar; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Service Cost , U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Material Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Inter Guard 269: Dft 150 Micron, 2 Fc Inter Shield 300: Dft 2*150 Micron, 1 Fc Inter Guard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Inter Guard 269; Dft 1*50 M, 2 Fc Inter Shield 300; Dft 2*150 M, 1 Fc Inter Guard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Inter Guard 269: Dft 150 Micron, 2 Fc Inter Shield 300: Dft 2*150 Micron, 1 Fc Inter Guard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Inter Guard 269; Dft 1*50 M, 2 Fc Inter Shield 300; Dft 2*150 M, 1 Fc Inter Guard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Material Cost , Utg Readings At Under Water, Above Water And Deck Area To Be Caried Out. Detailed Hull Survey Report To Be Provided To The Customer Post Renewal And Certification Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Material Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Service Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Material Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Service Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Material Cost , General Dry Compartments To Be Cleaned And Painit Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Service Cost , General Dry Compartments To Be Cleaned And Painit Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Material Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Service Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Material Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Service Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Material Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Service Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Material Cost , F/W Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Service Cost , F/W Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Material Cost , All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken Service Cost , All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken Material Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Service Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Material Cost , Following Rubber/Ss Expansion Bellows Found Leakage And Damaged Needs To Be Replace Service Cost1. 25 Nb - 1 Nos Lo System2. 40 Nb - 5 Nos Fire Pump And Fw System3. 40 Nb (Ss) - 4 Nos Fo System4. 50 Nb - 1 Nos Bilge Ballast System5. 65 Nb - 3 Nos Ac And Gs Pump , Following Rubber/Ss Expansion Bellows Found Leakage And Damaged Needs To Be Replace Material Cost1. 25 Nb - 1 Nos Lo System2. 40 Nb - 5 Nos Fire Pump And Fw System3. 40 Nb (Ss) - 4 Nos Fo System4. 50 Nb - 1 Nos Bilge Ballast System5. 65 Nb - 3 Nos Ac And Gs Pump , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Service Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Material Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Service Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Material Cost , Sea Chest Manifold 200 Nb Needs To Remove Refit And Cleaning Service Cost , Sea Chest Manifold 200 Nb Needs To Remove Refit And Cleaning Material Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Service Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Material Cost , Steel Renewal- Steel Plate Is 2062 Grade E250,Material Quality Br And Thickness Ranging 4Mm To 12 Mm Including Bulwark. Service Cost , Steel Renewal- Steel Plate Is 2062 Grade E250,Material Quality Br And Thickness Ranging 4Mm To 12 Mm Including Bulwark. Material Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat- Is 2062 Grade E250,Material Quality Br . Service Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat-2062 Grade E250,Material Quality Br . Material Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm. 2062 Grade E250,Material Quality Br. Service Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm. Mat - Is 2062 Grade E250,Material Quality Br . Material Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is 2062 Grade E250,Material Quality Br. Service Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is2062 Grade E250,Material Quality Br . Material Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Service Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Material Cost , Renew Sacrificial Anodes As Per Anode Plan. Service Cost , Renew Sacrificial Anodes As Per Anode Plan. Material Cost , Ships Name Board On Either Side Of Bridge Wing To Be Repaired As Per Existing Arrangement. Service Cost , Ships Name Board On Either Side Of Bridge Wing To Be Repaired As Per Existing Arrangement. Material Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Service Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Material Cost , Ac Compressor No 1 Is Non Operational Service Cost , Ac Compressor No 1 Is Non Operational Material Cost , Glass Gauge May Be Provided For Both Service Tank Diesel Service Cost , Glass Gauge May Be Provided For Both Service Tank Diesel Material Cost , Steering Angle Is Mismatched About To 5 Degree Service Cost , Steering Angle Is Mismatched About To 5 Degree Material Cost , Rubber Coaming Of All Door To Be Change Service Cost , Rubber Coaming Of All Door To Be Change Material Cost , Stretcher Bed In Passenger Cabin Is To Be Change Service Cost , Stretcher Bed In Passenger Cabin Is To Be Change Material Cost , Provisioning Of Ro Water Cooler Purifier Service Cost , Provisioning Of Ro Water Cooler Purifier Material Cost , Replacement Of Life Buoys And Mob Markers With Line Service Cost , Replacement Of Life Buoys And Mob Markers With Line Material Cost , Replacement Of Hru Units Of Life Rafts Service Cost , Replacement Of Hru Units Of Life Rafts Material Cost , Replacement Of Life Rafts Securing Arrangements Service Cost , Replacement Of Life Rafts Securing Arrangements Material Cost , Water Tight Hatches Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Service Cost , Water Tight Hatches Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Material Cost , Port Hole Rubber Coaming Beading To Be Renewed. Chalk Test To Be Carried Out And Proved. Service Cost , Port Hole Rubber Coaming Beading To Be Renewed. Chalk Test To Be Carried Out And Proved. Material Cost , Forward Windlass Along With Motors To Be Overhauled. Load Trials With Chain Cable To Be Undertaken In Presence Of Class Surveyor Certificates For The Same To Be Provided Service Cost , Forward Windlass Along With Motors To Be Overhauled. Load Trials With Chain Cable To Be Undertaken In Presence Of Class Surveyor Certificates For The Same To Be Provided Material Cost , Damaged Breather Pipes Along With Wire Mesh And Drain Pipes On Weather Deck To Be Renewed As Per Existing Arrangement. Service Cost , Damaged Breather Pipes Along With Wire Mesh And Drain Pipes On Weather Deck To Be Renewed As Per Existing Arrangement. Material Cost , Renewed Of Guardrail Arrangement (3 Pipes Of 50 Mtrs). Damaged Guard Rails Including Stanchions/Guard Rail Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Service Cost , Renewed Of Guardrail Arrangement (3 Pipes Of 50 Mtrs). Damaged Guard Rails Including Stanchions/Guard Rail Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Material Cost , Dismantle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Eliminate Leakages, Repair Defective Pipes And Paint As Per Colour Coding. Service Cost , Dismantle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Eliminate Leakages, Repair Defective Pipes And Paint As Per Colour Coding. Material Cost , Removal Of Both Anchor And Entire Chain Cable Along With All Accessories. Blasting And Survey By Class Surveyor To Be Carried Out Defective Parts To Be Renewed/Lubricated And Paint Schemce To Be Resorted As Per Approved No 53/16. A Detailed Report To Be Provided For Records Service Cost , Removal Of Both Anchor And Entire Chain Cable Along With All Accessories. Blasting And Survey By Class Surveyor To Be Carried Out Defective Parts To Be Renewed/Lubricated And Paint Schemce To Be Resorted As Per Approved No 53/16. A Detailed Report To Be Provided For Records Material Cost , Painting Of All The Internal Compartment Including Accommodation Area Service Cost , Painting Of All The Internal Compartment Including Accommodation Area Material Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved. Service Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved. Material Cost , Fire Hose Box To Be Renewed With Large Size. Matl: Frp. Service Cost , Fire Hose Box To Be Renewed With Large Size. Matl: Frp. Material Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Service Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Material Cost , Ms Vent Flaps To Be Repaired. Service Cost , Ms Vent Flaps To Be Repaired. Material Cost , Twin Bollards On Main Deck To Be Renewed Size 200 Nb Dia, Thickness- 10 Mm Mat Ms Service Cost , Twin Bollards On Main Deck To Be Renewed Size 200 Nb Dia, Thickness- 10 Mm Mat Ms Material Cost , Renew All Scuppers Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Service Cost , Renew All Scuppers Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Material Cost , Undertake Complete Overhauling Of Boat Davit Along With Rewinding Of Motor. Load Test To Be Undertaken In Presence Of Inspection Authority Certificate For The Same To Be Provided. Service Cost , Undertake Complete Overhauling Of Boat Davit Along With Rewinding Of Motor. Load Test To Be Undertaken In Presence Of Inspection Authority Certificate For The Same To Be Provided. Material Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia: 32 Inch. Service Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia: 32 Inch. Material Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. Service Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. Material Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall. Service Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall. Material Cost , Nwt Marine Plywood With Lamination Wooden Doors Having In Built Locks, Handles/ Knobs/ Door Closer Of Officer Toilet & Crew Toilet Door.(Approx Size 2.5 Ft X 6 Ft). Service Cost , Nwt Marine Plywood With Lamination Wooden Doors Having In Built Locks, Handles/ Knobs/ Door Closer Of Officer Toilet & Crew Toilet Door.(Approx Size 2.5 Ft X 6 Ft). Material Cost , Crew Toilet Fresh Water Line To Be Renewed. Mat: Gi. Service Cost , Crew Toilet Fresh Water Line To Be Renewed. Mat: Gi. Material Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Service Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Material Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Service Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Material Cost , Renew Ss Gents Urinal Pan With Porcel In Urinal Pan. Make: Jaquar. Service Cost , Renew Ss Gents Urinal Pan With Porcel In Urinal Pan. Make: Jaquar. Material Cost , Western Commodes Of Chief Cabin, Master Cabin, Crew, Gents And Ladies Passenger Toilets With Jet Assembly. Make:Jaquar Are To Be Renewed Service Cost , Western Commodes Of Chief Cabin, Master Cabin, Crew, Gents And Ladies Passenger Toilets With Jet Assembly. Make:Jaquar Are To Be Renewed Material Cost , All Chairs In Vip Cabin, Officers Cabin, Passengers Cabin, Master Cabin, Chief Cabin, Dining Hall, Wheel House To Be Repair Or Renewed Service Cost , All Chairs In Vip Cabin, Officers Cabin, Passengers Cabin, Master Cabin, Chief Cabin, Dining Hall, Wheel House To Be Repair Or Renewed Material Cost , Provide A Seat Cover For All Commode Toilet Service Cost , Provide A Seat Cover For All Commode Toilet Material Cost , Bib Cocks In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Bib Cocks In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Isolating Valves In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Isolating Valves In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet Water Taps, Showers And Flush Taps To Be Repair And Renewed. Service Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet Water Taps, Showers And Flush Taps To Be Repair And Renewed. Material Cost , Renewal Of Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Service Cost , Renewal Of Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Material Cost , Macrotek Deck Covering Of Bridge, All Wcs, Engineers And Master Cabin ,Cabin Lobby, Mess/Rec Room, Pantry, Crew Bathroom To Be Renewed (Damaged Area Only). Service Cost , Macrotek Deck Covering Of Bridge, All Wcs, Engineers And Master Cabin ,Cabin Lobby, Mess/Rec Room, Pantry, Crew Bathroom To Be Renewed (Damaged Area Only). Material Cost , Water Cooler To Be Overhauled/ Repaired/ Routines To Be Undertaken & Cleaned. Make: Blue Star. Service Cost , Water Cooler To Be Overhauled/ Repaired/ Routines To Be Undertaken & Cleaned. Make: Blue Star. Material Cost , Nr Routines Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers, Renew Bearing If Required. (C) Clean Internal Surface Of Trunking, Grease Filters, Ball Valves Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line. (D) Renew Air Filters/ Pads. Service Cost , Nr Routines Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers, Renew Bearing If Required. (C) Clean Internal Surface Of Trunking, Grease Filters, Ball Valves Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line. (D) Renew Air Filters/ Pads. Material Cost , Replace Hru And Coat Hanger With 32 In Nos Safety Belts For 16 In Nos Life Raft. Service Cost , Replace Hru And Coat Hanger With 32 In Nos Safety Belts For 16 In Nos Life Raft. Material Cost , Carry Out Major Overhauling Of Both Main Engine. Routines To Be Carried Out By Oem. Make: Cummins, Model: Kta19m4. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Both Main Engine. Routines To Be Carried Out By Oem. Make: Cummins, Model: Kta19m4. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Carry Out Major Overhauling Of Both Dg. Routines To Be Carried Out By Oem. Make: Koel, Model: 6Sl 1500Ta. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Both Dg. Routines To Be Carried Out By Oem. Make: Koel, Model: 6Sl 1500Ta. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Both Dg Sea Water Pump Needs To Be Overhaul Service Cost , Both Dg Sea Water Pump Needs To Be Overhaul Material Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water Cooler, After Air, Lub Oilcoolers Found Leaking During Pressure Testing . Service Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water Cooler, After Air, Lub Oilcoolers Found Leaking During Pressure Testing . Material Cost , Cooler Drain Line Found Jammed At Passenger Area Needs To Remove, Service And Refitting Service Cost , Cooler Drain Line Found Jammed At Passenger Area Needs To Remove, Service And Refitting Material Cost , Renewal Of Muffler Of Both Main Engine And Dg Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Service Cost , Renewal Of Muffler Of Both Main Engine And Dg Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Material Cost , All Systems Main Engine & Dg, Pressure Gauge And Vacuum Gauge Thermometer, Need To Calibration And Replace With New Gauge Service Cost , All Systems Main Engine & Dg, Pressure Gauge And Vacuum Gauge Thermometer, Need To Calibration And Replace With New Gauge Material Cost , M E & Dg Control Panel Is Need To Calibrate Service Cost , M E & Dg Control Panel Is Need To Calibrate Material Cost , Undertake Functional Checks Of Main Engine Local Control Panel And Remote Control Panel At Wheel House. Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Service Cost , Undertake Functional Checks Of Main Engine Local Control Panel And Remote Control Panel At Wheel House. Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Material Cost , Undertake Complete Rewinding Of Stator And Rotor Winding, Renewal Of Bearings, Renewal Of Avr, Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50 Hz Alternator (Make - Kirloskar). Service Cost , Undertake Complete Rewinding Of Stator And Rotor Winding, Renewal Of Bearings, Renewal Of Avr, Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50 Hz Alternator (Make - Kirloskar). Material Cost , Undertake Functional Checks Of Da Local Control Panel And Remote Control Panel Onboard Ferry Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Service Cost , Undertake Functional Checks Of Da Local Control Panel And Remote Control Panel Onboard Ferry Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Material Cost , Renewal Of Exhuast Compensator Of Both Dgs. Mat : Ss. Dia 100Mm. Service Cost , Renewal Of Exhuast Compensator Of Both Dgs. Mat : Ss. Dia 100Mm. Material Cost , Undertake Cleaning And Pressure Testing Of Dg Fresh Water, After Cooler And Lub Oil Cooler. Service Cost , Undertake Cleaning And Pressure Testing Of Dg Fresh Water, After Cooler And Lub Oil Cooler. Material Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type Ep140, Qty 40 Ltr/Gear Box). Service Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type Ep140, Qty 40 Ltr/Gear Box). Material Cost , Undertake Cleaning And Pressure Testing Of Gear Box Lub Oil Coolers. Service Cost , Undertake Cleaning And Pressure Testing Of Gear Box Lub Oil Coolers. Material Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Fc And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timermotor And Relays Through Oem Authorised Reps. Service Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Tug And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timermotor And Relays Through Oem Authorised Reps. Material Cost , Carry Out 6000 Hourly Routine And Major Overhauling Of Both Gear Box Make - Zf Marine, Model - W650. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out 6000 Hourly Routine And Major Overhauling Of Both Gear Box Make - Zf Marine, Model - W650. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Carry Out Major Overhauling Of Ac Plant. Routines To Be Carried Out By Oem. Make - Kpcl, Model - 32Tr. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Ac Plant. Routines To Be Carried Out By Oem. Make - Kpcl, Model - 32Tr. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Replace Thordon Bearings Of A Bracket And Stern Tube Of Both Shaft Lines, Record Clearances Post Renewal. Service Cost , Replace Thordon Bearings Of A Bracket And Stern Tube Of Both Shaft Lines, Record Clearances Post Renewal. Material Cost , Overhaul Stern Tube Stuffing Boxes/Deep Sea Seal. Replace Securing Stud And Re- Assemble. Service Cost , Overhaul Stern Tube Stuffing Boxes. Replace Securing Stud And Re- Assemble. Material Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Service Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Material Cost , Major Overhaul Of Fuel Oil Centrifuge Along With Motor And Associated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Service Cost , Major Overhaul Of Fuel Oil Centrifuge Along With Motor And Associated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Material Cost , Undertake Overhauling Of Seawage Treatment Plant (Stp) And Control Panel To Be Carried Out And System To Proved Onboard Craft Post Overhauling. Routines To Be Carried Out By Oem. Make - Hamworthy, Model 9804140099. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Undertake Overhauling Of Seawage Treatment Plant (Stp) And Control Panel To Be Carried Out And System To Proved Onboard Craft Post Overhauling. Routines To Be Carried Out By Oem. Make - Hamworthy, Model 9804140099. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi ) Aong With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi ) Aong With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Service Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Material Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Service Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Material Cost , Overhauling Of Fuel Oil Transfer Pump Along With Motor And Starter, Qyt 01 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fuel Oil Transfer Pump Along With Motor And Starter, Qyt 01 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter Need To Repair And Not Run In Auto Mode,(Make: Be, Type: Ao3110 , Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter Need To Repair And Not Run In Auto Mode,(Make: Be, Type: Ao3110 , Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type- Ch/Chr/Cv Cap- 30 Tph). Service Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type- Ch/Chr/Cv Cap- 30 Tph). Material Cost , Overhauling Of Gs Pumps Along With Motor And Starter, To Be Carried Out (Make- Storck Type- Ch/Chr/Cv Cap- 45 Tph). Service Cost , Overhauling Of Gs Pumps Along With Motor And Starter, To Be Carried Out (Make- Storck Type- Ch/Chr/Cv Cap- 45 Tph). Material Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Service Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Material Cost , Renewal Of All Gauge Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Service Cost , Renewal Of All Gauge Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Material Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment. Service Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment. Material Cost , Calibration/Renewal Of All Temperature Gauges Of The Systems. Service Cost , Calibration/Renewal Of All Temperature Gauges Of The Systems. Material Cost , Cleaning & Pressure Testing Of Evaporator Coil Of Atu System And Atu Filter To Be Repair/ Renenew Defective Item & Condensor Coil. Make - Kpcl. Prove The System For Optimum Performance. Service Cost , Cleaning & Pressure Testing Of Evaporator Coil Of Atu System And Atu Filter To Be Repair/ Renenew Defective Item & Condensor Coil. Make - Kpcl. Prove The System For Optimum Performance. Material Cost

BOQ

Sl. No. Item TitleItem Description
1U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. SERVICE COSTU/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. SERVICE COST
2U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. MATERIAL COSTU/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. MATERIAL COST
3U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. SERVICE COSTU/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. SERVICE COST
4U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. MATERIAL COSTU/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. MATERIAL COST
5UTG READINGS AT UNDER WATER, ABOVE WATER AND DECK AREA TO BE CARIED OUT. DETAILED HULL SURVEY REPORT TO BE PROVIDED TO THE CUSTOMER POST RENEWAL AND CERTIFICATION SERVICE COSTUTG READINGS AT UNDER WATER, ABOVE WATER AND DECK AREA TO BE CARIED OUT. DETAILED HULL SURVEY REPORT TO BE PROVIDED TO THE CUSTOMER POST RENEWAL AND CERTIFICATION SERVICE COST
6SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. SERVICE COSTSHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. SERVICE COST
7SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. MATERIAL COSTSHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. MATERIAL COST
8SUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. SERVICE COSTSUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. SERVICE COST
9SUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. MATERIAL COSTSUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. MATERIAL COST
10WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. SERVICE COSTWEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. SERVICE COST
11WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. MATERIAL COSTWEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. MATERIAL COST
12GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. SERVICE COSTGENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. SERVICE COST
13GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. MATERIAL COSTGENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. MATERIAL COST
14BULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. SERVICE COSTBULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. SERVICE COST
15BULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. MATERIAL COSTBULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. MATERIAL COST
16E/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. SERVICE COSTE/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. SERVICE COST
17E/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. MATERIAL COSTE/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. MATERIAL COST
18FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. SERVICE COSTFO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. SERVICE COST
19FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. MATERIAL COSTFO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. MATERIAL COST
20F/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. SERVICE COSTF/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. SERVICE COST
21F/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. MATERIAL COSTF/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. MATERIAL COST
22ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN SERVICE COSTALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN SERVICE COST
23ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN MATERIAL COSTALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN MATERIAL COST
24BALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. SERVICE COSTBALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. SERVICE COST
25BALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. MATERIAL COSTBALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. MATERIAL COST
26FOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE SERVICE COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMPFOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE SERVICE COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMP
27FOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE MATERIAL COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMPFOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE MATERIAL COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMP
28SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. SERVICE COSTSURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. SERVICE COST
29SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. MATERIAL COSTSURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. MATERIAL COST
30SEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). SERVICE COSTSEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). SERVICE COST
31SEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). MATERIAL COSTSEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). MATERIAL COST
32SEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING SERVICE COSTSEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING SERVICE COST
33SEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING MATERIAL COSTSEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING MATERIAL COST
34SEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. SERVICE COSTSEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. SERVICE COST
35SEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. MATERIAL COSTSEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. MATERIAL COST
36STEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. SERVICE COSTSTEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. SERVICE COST
37STEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. MATERIAL COSTSTEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. MATERIAL COST
38RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT- IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . SERVICE COSTRENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT- IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . SERVICE COST
39RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT-2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COSTRENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT-2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST
40RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COSTRENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COST
41RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COSTRENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST
42RENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COSTRENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COST
43RENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COSTRENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST
44PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. SERVICE COSTPITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. SERVICE COST
45PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. MATERIAL COSTPITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. MATERIAL COST
46RENEW SACRIFICIAL ANODES AS PER ANODE PLAN. SERVICE COSTRENEW SACRIFICIAL ANODES AS PER ANODE PLAN. SERVICE COST
47RENEW SACRIFICIAL ANODES AS PER ANODE PLAN. MATERIAL COSTRENEW SACRIFICIAL ANODES AS PER ANODE PLAN. MATERIAL COST
48SHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. SERVICE COSTSHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. SERVICE COST
49SHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. MATERIAL COSTSHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. MATERIAL COST
50REPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. SERVICE COSTREPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. SERVICE COST
51REPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. MATERIAL COSTREPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. MATERIAL COST
52AC COMPRESSOR NO 1 IS NON OPERATIONAL SERVICE COSTAC COMPRESSOR NO 1 IS NON OPERATIONAL SERVICE COST
53AC COMPRESSOR NO 1 IS NON OPERATIONAL MATERIAL COSTAC COMPRESSOR NO 1 IS NON OPERATIONAL MATERIAL COST
54GLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL SERVICE COSTGLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL SERVICE COST
55GLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL MATERIAL COSTGLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL MATERIAL COST
56STEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE SERVICE COSTSTEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE SERVICE COST
57STEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE MATERIAL COSTSTEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE MATERIAL COST
58RUBBER COAMING OF ALL DOOR TO BE CHANGE SERVICE COSTRUBBER COAMING OF ALL DOOR TO BE CHANGE SERVICE COST
59RUBBER COAMING OF ALL DOOR TO BE CHANGE MATERIAL COSTRUBBER COAMING OF ALL DOOR TO BE CHANGE MATERIAL COST
60STRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE SERVICE COSTSTRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE SERVICE COST
61STRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE MATERIAL COSTSTRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE MATERIAL COST
62PROVISIONING OF RO WATER COOLER PURIFIER SERVICE COSTPROVISIONING OF RO WATER COOLER PURIFIER SERVICE COST
63PROVISIONING OF RO WATER COOLER PURIFIER MATERIAL COSTPROVISIONING OF RO WATER COOLER PURIFIER MATERIAL COST
64REPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE SERVICE COSTREPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE SERVICE COST
65REPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE MATERIAL COSTREPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE MATERIAL COST
66REPLACEMENT OF HRU UNITS OF LIFE RAFTS SERVICE COSTREPLACEMENT OF HRU UNITS OF LIFE RAFTS SERVICE COST
67REPLACEMENT OF HRU UNITS OF LIFE RAFTS MATERIAL COSTREPLACEMENT OF HRU UNITS OF LIFE RAFTS MATERIAL COST
68REPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS SERVICE COSTREPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS SERVICE COST
69REPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS MATERIAL COSTREPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS MATERIAL COST
70WATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. SERVICE COSTWATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. SERVICE COST
71WATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. MATERIAL COSTWATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. MATERIAL COST
72PORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. SERVICE COSTPORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. SERVICE COST
73PORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. MATERIAL COSTPORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. MATERIAL COST
74FORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED SERVICE COSTFORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED SERVICE COST
75FORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED MATERIAL COSTFORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED MATERIAL COST
76DAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. SERVICE COSTDAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. SERVICE COST
77DAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. MATERIAL COSTDAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. MATERIAL COST
78RENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. SERVICE COSTRENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. SERVICE COST
79RENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. MATERIAL COSTRENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. MATERIAL COST
80DISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. SERVICE COSTDISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. SERVICE COST
81DISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. MATERIAL COSTDISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. MATERIAL COST
82REMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS SERVICE COSTREMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS SERVICE COST
83REMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS MATERIAL COSTREMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS MATERIAL COST
84PAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA SERVICE COSTPAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA SERVICE COST
85PAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA MATERIAL COSTPAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA MATERIAL COST
86ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. SERVICE COSTROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. SERVICE COST
87ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. MATERIAL COSTROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. MATERIAL COST
88FIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. SERVICE COSTFIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. SERVICE COST
89FIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. MATERIAL COSTFIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. MATERIAL COST
90AIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. SERVICE COSTAIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. SERVICE COST
91AIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. MATERIAL COSTAIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. MATERIAL COST
92MS VENT FLAPS TO BE REPAIRED. SERVICE COSTMS VENT FLAPS TO BE REPAIRED. SERVICE COST
93MS VENT FLAPS TO BE REPAIRED. MATERIAL COSTMS VENT FLAPS TO BE REPAIRED. MATERIAL COST
94TWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS SERVICE COSTTWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS SERVICE COST
95TWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS MATERIAL COSTTWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS MATERIAL COST
96RENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. SERVICE COSTRENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. SERVICE COST
97RENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. MATERIAL COSTRENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. MATERIAL COST
98UNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. SERVICE COSTUNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. SERVICE COST
99UNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. MATERIAL COSTUNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. MATERIAL COST
100TYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. SERVICE COSTTYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. SERVICE COST
101TYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. MATERIAL COSTTYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. MATERIAL COST
102TYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. SERVICE COSTTYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. SERVICE COST
103TYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. MATERIAL COSTTYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. MATERIAL COST
104SUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. SERVICE COSTSUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. SERVICE COST
105SUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. MATERIAL COSTSUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. MATERIAL COST
106NWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). SERVICE COSTNWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). SERVICE COST
107NWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). MATERIAL COSTNWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). MATERIAL COST
108CREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. SERVICE COSTCREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. SERVICE COST
109CREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. MATERIAL COSTCREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. MATERIAL COST
110CREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. SERVICE COSTCREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. SERVICE COST
111CREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. MATERIAL COSTCREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. MATERIAL COST
112RENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. SERVICE COSTRENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. SERVICE COST
113RENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. MATERIAL COSTRENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. MATERIAL COST
114RENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. SERVICE COSTRENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. SERVICE COST
115RENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. MATERIAL COSTRENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. MATERIAL COST
116WESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED SERVICE COSTWESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED SERVICE COST
117WESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED MATERIAL COSTWESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED MATERIAL COST
118ALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED SERVICE COSTALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED SERVICE COST
119ALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED MATERIAL COSTALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED MATERIAL COST
120PROVIDE A SEAT COVER FOR ALL COMMODE TOILET SERVICE COSTPROVIDE A SEAT COVER FOR ALL COMMODE TOILET SERVICE COST
121PROVIDE A SEAT COVER FOR ALL COMMODE TOILET MATERIAL COSTPROVIDE A SEAT COVER FOR ALL COMMODE TOILET MATERIAL COST
122BIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COSTBIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST
123BIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COSTBIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST
124ISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COSTISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST
125ISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COSTISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST
126SHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COSTSHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST
127SHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COSTSHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST
128WC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. SERVICE COSTWC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. SERVICE COST
129WC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. MATERIAL COSTWC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. MATERIAL COST
130RENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. SERVICE COSTRENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. SERVICE COST
131RENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. MATERIAL COSTRENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. MATERIAL COST
132MACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). SERVICE COSTMACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). SERVICE COST
133MACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). MATERIAL COSTMACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). MATERIAL COST
134WATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. SERVICE COSTWATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. SERVICE COST
135WATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. MATERIAL COSTWATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. MATERIAL COST
136NR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. SERVICE COSTNR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. SERVICE COST
137NR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. MATERIAL COSTNR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. MATERIAL COST
138REPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. SERVICE COSTREPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. SERVICE COST
139REPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. MATERIAL COSTREPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. MATERIAL COST
140CARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COSTCARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST
141CARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COSTCARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST
142CARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COSTCARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST
143CARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COSTCARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST
144BOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL SERVICE COSTBOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL SERVICE COST
145BOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL MATERIAL COSTBOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL MATERIAL COST
146UNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . SERVICE COSTUNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . SERVICE COST
147UNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . MATERIAL COSTUNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . MATERIAL COST
148COOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING SERVICE COSTCOOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING SERVICE COST
149COOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING MATERIAL COSTCOOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING MATERIAL COST
150RENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). SERVICE COSTRENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). SERVICE COST
151RENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). MATERIAL COSTRENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). MATERIAL COST
152ALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE SERVICE COSTALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE SERVICE COST
153ALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE MATERIAL COSTALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE MATERIAL COST
154M E & DG CONTROL PANEL IS NEED TO CALIBRATE SERVICE COSTM E & DG CONTROL PANEL IS NEED TO CALIBRATE SERVICE COST
155M E & DG CONTROL PANEL IS NEED TO CALIBRATE MATERIAL COSTM E & DG CONTROL PANEL IS NEED TO CALIBRATE MATERIAL COST
156UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COSTUNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COST
157UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COSTUNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COST
158UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). SERVICE COSTUNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). SERVICE COST
159UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). MATERIAL COSTUNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). MATERIAL COST
160UNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COSTUNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COST
161UNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COSTUNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COST
162RENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. SERVICE COSTRENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. SERVICE COST
163RENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. MATERIAL COSTRENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. MATERIAL COST
164UNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. SERVICE COSTUNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. SERVICE COST
165UNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. MATERIAL COSTUNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. MATERIAL COST
166DRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). SERVICE COSTDRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). SERVICE COST
167DRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). MATERIAL COSTDRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). MATERIAL COST
168UNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. SERVICE COSTUNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. SERVICE COST
169UNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. MATERIAL COSTUNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. MATERIAL COST
170UNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD FC AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. SERVICE COSTUNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD FC AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. SERVICE COST
171UNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD TUG AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. MATERIAL COSTUNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD TUG AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. MATERIAL COST
172CARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COSTCARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST
173CARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COSTCARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST
174CARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COSTCARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST
175CARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COSTCARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST
176REPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. SERVICE COSTREPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. SERVICE COST
177REPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. MATERIAL COSTREPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. MATERIAL COST
178OVERHAUL STERN TUBE STUFFING BOXES/DEEP SEA SEAL. REPLACE SECURING STUD AND RE- ASSEMBLE. SERVICE COSTOVERHAUL STERN TUBE STUFFING BOXES/DEEP SEA SEAL. REPLACE SECURING STUD AND RE- ASSEMBLE. SERVICE COST
179OVERHAUL STERN TUBE STUFFING BOXES. REPLACE SECURING STUD AND RE- ASSEMBLE. MATERIAL COSTOVERHAUL STERN TUBE STUFFING BOXES. REPLACE SECURING STUD AND RE- ASSEMBLE. MATERIAL COST
180EXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. SERVICE COSTEXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. SERVICE COST
181EXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. MATERIAL COSTEXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. MATERIAL COST
182MAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. SERVICE COSTMAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. SERVICE COST
183MAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. MATERIAL COSTMAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. MATERIAL COST
184UNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COSTUNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST
185UNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COSTUNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST
1861000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST1000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST
1871000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST1000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST
188OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. SERVICE COSTOVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. SERVICE COST
189OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. MATERIAL COSTOVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. MATERIAL COST
190OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. SERVICE COSTOVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. SERVICE COST
191OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. MATERIAL COSTOVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. MATERIAL COST
192OVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COSTOVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COST
193OVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COSTOVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COST
194OVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COSTOVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COST
195OVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COSTOVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COST
196OVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). SERVICE COSTOVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). SERVICE COST
197OVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). MATERIAL COSTOVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). MATERIAL COST
198OVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). SERVICE COSTOVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). SERVICE COST
199OVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). MATERIAL COSTOVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). MATERIAL COST
200RENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. SERVICE COSTRENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. SERVICE COST
201RENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. MATERIAL COSTRENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. MATERIAL COST
202RENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. SERVICE COSTRENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. SERVICE COST
203RENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. MATERIAL COSTRENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. MATERIAL COST
204ALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. SERVICE COSTALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. SERVICE COST
205ALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. MATERIAL COSTALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. MATERIAL COST
206CALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. SERVICE COSTCALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. SERVICE COST
207CALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. MATERIAL COSTCALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. MATERIAL COST
208CLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. SERVICE COSTCLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. SERVICE COST
209CLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. MATERIAL COSTCLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. MATERIAL COST

AI Tender Summary

OUR REF NO 57355995
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 25-09-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Ferry Craft Vihar; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Service Cost , U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Material Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Inter Guard 269: Dft 150 Micron, 2 Fc Inter Shield 300: Dft 2*150 Micron, 1 Fc Inter Guard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Inter Guard 269; Dft 1*50 M, 2 Fc Inter Shield 300; Dft 2*150 M, 1 Fc Inter Guard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Inter Guard 269: Dft 150 Micron, 2 Fc Inter Shield 300: Dft 2*150 Micron, 1 Fc Inter Guard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Inter Guard 269; Dft 1*50 M, 2 Fc Inter Shield 300; Dft 2*150 M, 1 Fc Inter Guard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Material Cost , Utg Readings At Under Water, Above Water And Deck Area To Be Caried Out. Detailed Hull Survey Report To Be Provided To The Customer Post Renewal And Certification Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Material Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Service Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Material Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Service Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Material Cost , General Dry Compartments To Be Cleaned And Painit Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Service Cost , General Dry Compartments To Be Cleaned And Painit Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Material Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Service Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Material Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Service Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Material Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Service Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Material Cost , F/W Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Service Cost , F/W Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Material Cost , All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken Service Cost , All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken Material Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Service Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Material Cost , Following Rubber/Ss Expansion Bellows Found Leakage And Damaged Needs To Be Replace Service Cost1. 25 Nb - 1 Nos Lo System2. 40 Nb - 5 Nos Fire Pump And Fw System3. 40 Nb (Ss) - 4 Nos Fo System4. 50 Nb - 1 Nos Bilge Ballast System5. 65 Nb - 3 Nos Ac And Gs Pump , Following Rubber/Ss Expansion Bellows Found Leakage And Damaged Needs To Be Replace Material Cost1. 25 Nb - 1 Nos Lo System2. 40 Nb - 5 Nos Fire Pump And Fw System3. 40 Nb (Ss) - 4 Nos Fo System4. 50 Nb - 1 Nos Bilge Ballast System5. 65 Nb - 3 Nos Ac And Gs Pump , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Service Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Material Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Service Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Material Cost , Sea Chest Manifold 200 Nb Needs To Remove Refit And Cleaning Service Cost , Sea Chest Manifold 200 Nb Needs To Remove Refit And Cleaning Material Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Service Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Material Cost , Steel Renewal- Steel Plate Is 2062 Grade E250,Material Quality Br And Thickness Ranging 4Mm To 12 Mm Including Bulwark. Service Cost , Steel Renewal- Steel Plate Is 2062 Grade E250,Material Quality Br And Thickness Ranging 4Mm To 12 Mm Including Bulwark. Material Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat- Is 2062 Grade E250,Material Quality Br . Service Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat-2062 Grade E250,Material Quality Br . Material Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm. 2062 Grade E250,Material Quality Br. Service Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm. Mat - Is 2062 Grade E250,Material Quality Br . Material Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is 2062 Grade E250,Material Quality Br. Service Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is2062 Grade E250,Material Quality Br . Material Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Service Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Material Cost , Renew Sacrificial Anodes As Per Anode Plan. Service Cost , Renew Sacrificial Anodes As Per Anode Plan. Material Cost , Ships Name Board On Either Side Of Bridge Wing To Be Repaired As Per Existing Arrangement. Service Cost , Ships Name Board On Either Side Of Bridge Wing To Be Repaired As Per Existing Arrangement. Material Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Service Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Material Cost , Ac Compressor No 1 Is Non Operational Service Cost , Ac Compressor No 1 Is Non Operational Material Cost , Glass Gauge May Be Provided For Both Service Tank Diesel Service Cost , Glass Gauge May Be Provided For Both Service Tank Diesel Material Cost , Steering Angle Is Mismatched About To 5 Degree Service Cost , Steering Angle Is Mismatched About To 5 Degree Material Cost , Rubber Coaming Of All Door To Be Change Service Cost , Rubber Coaming Of All Door To Be Change Material Cost , Stretcher Bed In Passenger Cabin Is To Be Change Service Cost , Stretcher Bed In Passenger Cabin Is To Be Change Material Cost , Provisioning Of Ro Water Cooler Purifier Service Cost , Provisioning Of Ro Water Cooler Purifier Material Cost , Replacement Of Life Buoys And Mob Markers With Line Service Cost , Replacement Of Life Buoys And Mob Markers With Line Material Cost , Replacement Of Hru Units Of Life Rafts Service Cost , Replacement Of Hru Units Of Life Rafts Material Cost , Replacement Of Life Rafts Securing Arrangements Service Cost , Replacement Of Life Rafts Securing Arrangements Material Cost , Water Tight Hatches Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Service Cost , Water Tight Hatches Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Material Cost , Port Hole Rubber Coaming Beading To Be Renewed. Chalk Test To Be Carried Out And Proved. Service Cost , Port Hole Rubber Coaming Beading To Be Renewed. Chalk Test To Be Carried Out And Proved. Material Cost , Forward Windlass Along With Motors To Be Overhauled. Load Trials With Chain Cable To Be Undertaken In Presence Of Class Surveyor Certificates For The Same To Be Provided Service Cost , Forward Windlass Along With Motors To Be Overhauled. Load Trials With Chain Cable To Be Undertaken In Presence Of Class Surveyor Certificates For The Same To Be Provided Material Cost , Damaged Breather Pipes Along With Wire Mesh And Drain Pipes On Weather Deck To Be Renewed As Per Existing Arrangement. Service Cost , Damaged Breather Pipes Along With Wire Mesh And Drain Pipes On Weather Deck To Be Renewed As Per Existing Arrangement. Material Cost , Renewed Of Guardrail Arrangement (3 Pipes Of 50 Mtrs). Damaged Guard Rails Including Stanchions/Guard Rail Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Service Cost , Renewed Of Guardrail Arrangement (3 Pipes Of 50 Mtrs). Damaged Guard Rails Including Stanchions/Guard Rail Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Material Cost , Dismantle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Eliminate Leakages, Repair Defective Pipes And Paint As Per Colour Coding. Service Cost , Dismantle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Eliminate Leakages, Repair Defective Pipes And Paint As Per Colour Coding. Material Cost , Removal Of Both Anchor And Entire Chain Cable Along With All Accessories. Blasting And Survey By Class Surveyor To Be Carried Out Defective Parts To Be Renewed/Lubricated And Paint Schemce To Be Resorted As Per Approved No 53/16. A Detailed Report To Be Provided For Records Service Cost , Removal Of Both Anchor And Entire Chain Cable Along With All Accessories. Blasting And Survey By Class Surveyor To Be Carried Out Defective Parts To Be Renewed/Lubricated And Paint Schemce To Be Resorted As Per Approved No 53/16. A Detailed Report To Be Provided For Records Material Cost , Painting Of All The Internal Compartment Including Accommodation Area Service Cost , Painting Of All The Internal Compartment Including Accommodation Area Material Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved. Service Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved. Material Cost , Fire Hose Box To Be Renewed With Large Size. Matl: Frp. Service Cost , Fire Hose Box To Be Renewed With Large Size. Matl: Frp. Material Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Service Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Material Cost , Ms Vent Flaps To Be Repaired. Service Cost , Ms Vent Flaps To Be Repaired. Material Cost , Twin Bollards On Main Deck To Be Renewed Size 200 Nb Dia, Thickness- 10 Mm Mat Ms Service Cost , Twin Bollards On Main Deck To Be Renewed Size 200 Nb Dia, Thickness- 10 Mm Mat Ms Material Cost , Renew All Scuppers Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Service Cost , Renew All Scuppers Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Material Cost , Undertake Complete Overhauling Of Boat Davit Along With Rewinding Of Motor. Load Test To Be Undertaken In Presence Of Inspection Authority Certificate For The Same To Be Provided. Service Cost , Undertake Complete Overhauling Of Boat Davit Along With Rewinding Of Motor. Load Test To Be Undertaken In Presence Of Inspection Authority Certificate For The Same To Be Provided. Material Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia: 32 Inch. Service Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia: 32 Inch. Material Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. Service Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. Material Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall. Service Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall. Material Cost , Nwt Marine Plywood With Lamination Wooden Doors Having In Built Locks, Handles/ Knobs/ Door Closer Of Officer Toilet & Crew Toilet Door.(Approx Size 2.5 Ft X 6 Ft). Service Cost , Nwt Marine Plywood With Lamination Wooden Doors Having In Built Locks, Handles/ Knobs/ Door Closer Of Officer Toilet & Crew Toilet Door.(Approx Size 2.5 Ft X 6 Ft). Material Cost , Crew Toilet Fresh Water Line To Be Renewed. Mat: Gi. Service Cost , Crew Toilet Fresh Water Line To Be Renewed. Mat: Gi. Material Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Service Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Material Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Service Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Material Cost , Renew Ss Gents Urinal Pan With Porcel In Urinal Pan. Make: Jaquar. Service Cost , Renew Ss Gents Urinal Pan With Porcel In Urinal Pan. Make: Jaquar. Material Cost , Western Commodes Of Chief Cabin, Master Cabin, Crew, Gents And Ladies Passenger Toilets With Jet Assembly. Make:Jaquar Are To Be Renewed Service Cost , Western Commodes Of Chief Cabin, Master Cabin, Crew, Gents And Ladies Passenger Toilets With Jet Assembly. Make:Jaquar Are To Be Renewed Material Cost , All Chairs In Vip Cabin, Officers Cabin, Passengers Cabin, Master Cabin, Chief Cabin, Dining Hall, Wheel House To Be Repair Or Renewed Service Cost , All Chairs In Vip Cabin, Officers Cabin, Passengers Cabin, Master Cabin, Chief Cabin, Dining Hall, Wheel House To Be Repair Or Renewed Material Cost , Provide A Seat Cover For All Commode Toilet Service Cost , Provide A Seat Cover For All Commode Toilet Material Cost , Bib Cocks In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Bib Cocks In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Isolating Valves In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Isolating Valves In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet Water Taps, Showers And Flush Taps To Be Repair And Renewed. Service Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet Water Taps, Showers And Flush Taps To Be Repair And Renewed. Material Cost , Renewal Of Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Service Cost , Renewal Of Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Material Cost , Macrotek Deck Covering Of Bridge, All Wcs, Engineers And Master Cabin ,Cabin Lobby, Mess/Rec Room, Pantry, Crew Bathroom To Be Renewed (Damaged Area Only). Service Cost , Macrotek Deck Covering Of Bridge, All Wcs, Engineers And Master Cabin ,Cabin Lobby, Mess/Rec Room, Pantry, Crew Bathroom To Be Renewed (Damaged Area Only). Material Cost , Water Cooler To Be Overhauled/ Repaired/ Routines To Be Undertaken & Cleaned. Make: Blue Star. Service Cost , Water Cooler To Be Overhauled/ Repaired/ Routines To Be Undertaken & Cleaned. Make: Blue Star. Material Cost , Nr Routines Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers, Renew Bearing If Required. (C) Clean Internal Surface Of Trunking, Grease Filters, Ball Valves Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line. (D) Renew Air Filters/ Pads. Service Cost , Nr Routines Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers, Renew Bearing If Required. (C) Clean Internal Surface Of Trunking, Grease Filters, Ball Valves Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line. (D) Renew Air Filters/ Pads. Material Cost , Replace Hru And Coat Hanger With 32 In Nos Safety Belts For 16 In Nos Life Raft. Service Cost , Replace Hru And Coat Hanger With 32 In Nos Safety Belts For 16 In Nos Life Raft. Material Cost , Carry Out Major Overhauling Of Both Main Engine. Routines To Be Carried Out By Oem. Make: Cummins, Model: Kta19m4. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Both Main Engine. Routines To Be Carried Out By Oem. Make: Cummins, Model: Kta19m4. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Carry Out Major Overhauling Of Both Dg. Routines To Be Carried Out By Oem. Make: Koel, Model: 6Sl 1500Ta. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Both Dg. Routines To Be Carried Out By Oem. Make: Koel, Model: 6Sl 1500Ta. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Both Dg Sea Water Pump Needs To Be Overhaul Service Cost , Both Dg Sea Water Pump Needs To Be Overhaul Material Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water Cooler, After Air, Lub Oilcoolers Found Leaking During Pressure Testing . Service Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water Cooler, After Air, Lub Oilcoolers Found Leaking During Pressure Testing . Material Cost , Cooler Drain Line Found Jammed At Passenger Area Needs To Remove, Service And Refitting Service Cost , Cooler Drain Line Found Jammed At Passenger Area Needs To Remove, Service And Refitting Material Cost , Renewal Of Muffler Of Both Main Engine And Dg Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Service Cost , Renewal Of Muffler Of Both Main Engine And Dg Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Material Cost , All Systems Main Engine & Dg, Pressure Gauge And Vacuum Gauge Thermometer, Need To Calibration And Replace With New Gauge Service Cost , All Systems Main Engine & Dg, Pressure Gauge And Vacuum Gauge Thermometer, Need To Calibration And Replace With New Gauge Material Cost , M E & Dg Control Panel Is Need To Calibrate Service Cost , M E & Dg Control Panel Is Need To Calibrate Material Cost , Undertake Functional Checks Of Main Engine Local Control Panel And Remote Control Panel At Wheel House. Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Service Cost , Undertake Functional Checks Of Main Engine Local Control Panel And Remote Control Panel At Wheel House. Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Material Cost , Undertake Complete Rewinding Of Stator And Rotor Winding, Renewal Of Bearings, Renewal Of Avr, Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50 Hz Alternator (Make - Kirloskar). Service Cost , Undertake Complete Rewinding Of Stator And Rotor Winding, Renewal Of Bearings, Renewal Of Avr, Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50 Hz Alternator (Make - Kirloskar). Material Cost , Undertake Functional Checks Of Da Local Control Panel And Remote Control Panel Onboard Ferry Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Service Cost , Undertake Functional Checks Of Da Local Control Panel And Remote Control Panel Onboard Ferry Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Material Cost , Renewal Of Exhuast Compensator Of Both Dgs. Mat : Ss. Dia 100Mm. Service Cost , Renewal Of Exhuast Compensator Of Both Dgs. Mat : Ss. Dia 100Mm. Material Cost , Undertake Cleaning And Pressure Testing Of Dg Fresh Water, After Cooler And Lub Oil Cooler. Service Cost , Undertake Cleaning And Pressure Testing Of Dg Fresh Water, After Cooler And Lub Oil Cooler. Material Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type Ep140, Qty 40 Ltr/Gear Box). Service Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type Ep140, Qty 40 Ltr/Gear Box). Material Cost , Undertake Cleaning And Pressure Testing Of Gear Box Lub Oil Coolers. Service Cost , Undertake Cleaning And Pressure Testing Of Gear Box Lub Oil Coolers. Material Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Fc And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timermotor And Relays Through Oem Authorised Reps. Service Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Tug And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timermotor And Relays Through Oem Authorised Reps. Material Cost , Carry Out 6000 Hourly Routine And Major Overhauling Of Both Gear Box Make - Zf Marine, Model - W650. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out 6000 Hourly Routine And Major Overhauling Of Both Gear Box Make - Zf Marine, Model - W650. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Carry Out Major Overhauling Of Ac Plant. Routines To Be Carried Out By Oem. Make - Kpcl, Model - 32Tr. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Ac Plant. Routines To Be Carried Out By Oem. Make - Kpcl, Model - 32Tr. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Replace Thordon Bearings Of A Bracket And Stern Tube Of Both Shaft Lines, Record Clearances Post Renewal. Service Cost , Replace Thordon Bearings Of A Bracket And Stern Tube Of Both Shaft Lines, Record Clearances Post Renewal. Material Cost , Overhaul Stern Tube Stuffing Boxes/Deep Sea Seal. Replace Securing Stud And Re- Assemble. Service Cost , Overhaul Stern Tube Stuffing Boxes. Replace Securing Stud And Re- Assemble. Material Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Service Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Material Cost , Major Overhaul Of Fuel Oil Centrifuge Along With Motor And Associated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Service Cost , Major Overhaul Of Fuel Oil Centrifuge Along With Motor And Associated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Material Cost , Undertake Overhauling Of Seawage Treatment Plant (Stp) And Control Panel To Be Carried Out And System To Proved Onboard Craft Post Overhauling. Routines To Be Carried Out By Oem. Make - Hamworthy, Model 9804140099. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Undertake Overhauling Of Seawage Treatment Plant (Stp) And Control Panel To Be Carried Out And System To Proved Onboard Craft Post Overhauling. Routines To Be Carried Out By Oem. Make - Hamworthy, Model 9804140099. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi ) Aong With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi ) Aong With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Service Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Material Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Service Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Material Cost , Overhauling Of Fuel Oil Transfer Pump Along With Motor And Starter, Qyt 01 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fuel Oil Transfer Pump Along With Motor And Starter, Qyt 01 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter Need To Repair And Not Run In Auto Mode,(Make: Be, Type: Ao3110 , Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter Need To Repair And Not Run In Auto Mode,(Make: Be, Type: Ao3110 , Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type- Ch/Chr/Cv Cap- 30 Tph). Service Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type- Ch/Chr/Cv Cap- 30 Tph). Material Cost , Overhauling Of Gs Pumps Along With Motor And Starter, To Be Carried Out (Make- Storck Type- Ch/Chr/Cv Cap- 45 Tph). Service Cost , Overhauling Of Gs Pumps Along With Motor And Starter, To Be Carried Out (Make- Storck Type- Ch/Chr/Cv Cap- 45 Tph). Material Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Service Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Material Cost , Renewal Of All Gauge Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Service Cost , Renewal Of All Gauge Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Material Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment. Service Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment. Material Cost , Calibration/Renewal Of All Temperature Gauges Of The Systems. Service Cost , Calibration/Renewal Of All Temperature Gauges Of The Systems. Material Cost , Cleaning & Pressure Testing Of Evaporator Coil Of Atu System And Atu Filter To Be Repair/ Renenew Defective Item & Condensor Coil. Make - Kpcl. Prove The System For Optimum Performance. Service Cost , Cleaning & Pressure Testing Of Evaporator Coil Of Atu System And Atu Filter To Be Repair/ Renenew Defective Item & Condensor Coil. Make - Kpcl. Prove The System For Optimum Performance. Material Cost
Basic Detail
Tender No GEM/2026/B/7788481
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 04 Sep 2026
Submission Date 25 Sep 2026
Open Date 26 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 32.77 Lakhs
Exemption Not Available
Document List
56192408-00a3-46ef-9205-a30e3e8e00e0.pdf
1788240651.xlsx
1788165654.pdf
1788165656.pdf
FINAL_ce87dd7f-9061-4ff4-acb41788521820090_COM_FM.pdf
SafetyClau_796a1b4e-c083-48f1-a85a1784091705715_SMYCS.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Sep 26, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
pdf

56192408-00a3-46ef-9205-a30e3e8e00e0.pdf

xlsx

1788240651.xlsx

pdf

1788165654.pdf

pdf

1788165656.pdf

pdf

FINAL_ce87dd7f-9061-4ff4-acb41788521820090_COM_FM.pdf

pdf

SafetyClau_796a1b4e-c083-48f1-a85a1784091705715_SMYCS.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders