Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Ferry Craft Vihar; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleane
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Ferry Craft Vihar; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Service Cost , U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth. Material Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Inter Guard 269: Dft 150 Micron, 2 Fc Inter Shield 300: Dft 2*150 Micron, 1 Fc Inter Guard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Inter Guard 269; Dft 1*50 M, 2 Fc Inter Shield 300; Dft 2*150 M, 1 Fc Inter Guard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Inter Guard 269: Dft 150 Micron, 2 Fc Inter Shield 300: Dft 2*150 Micron, 1 Fc Inter Guard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M. B/T Paint Scheme:-. 1 Fc Inter Guard 269; Dft 1*50 M, 2 Fc Inter Shield 300; Dft 2*150 M, 1 Fc Inter Guard 263: Dft 1*125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150 M, Last Coat Black. Material Cost , Utg Readings At Under Water, Above Water And Deck Area To Be Caried Out. Detailed Hull Survey Report To Be Provided To The Customer Post Renewal And Certification Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Intergard 259: Dft 1* 50 M, 2Nd &3Rd Coat Intertuff 265:Dft2*125 M, 2 Full Coat Interthane 990:Dft 2*60 M. Material Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Service Cost , Superstructure/ Mast To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follows:- 1St Coat Interguard 269: Dft 1*50 M, 2Nd Coat&3Rd Coat Intertuff 262:Dft2*125 M, 4Th Full Coat Interthane 990:Dft1*60 M. Material Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Service Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Intergard 269: Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800 M. Material Cost , General Dry Compartments To Be Cleaned And Painit Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Service Cost , General Dry Compartments To Be Cleaned And Painit Tough Up To Be Undertaken. Paint Scheme As Follows:- 1St Coat Interprime 538: Dft 1*75 M, 2 Fc Interlac 665: Dft 2*50 M. Material Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Service Cost , Bulk Head & Deck Of Wet Spaces Like Toilets, Baths, Washing Area To Be Cleaned, Dred & Painted, Paint Scheme: 1St Coat Interprime 538: Dft 1*80 M. 2 Fc Interlac 665: Dft 2*40 M. Material Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Service Cost , E/R Bilges & Steering Compartment To Be Cleaned, Dred & Painted. Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follow - 1St Coat Intergard 269:Dft 1*50 M, 2 Fc Intershield 300:Dft 2*150 M. Material Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Service Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate . Surface To Be Prepared To Sa 2.5 Prior Painting. Paint Scheme As Follows:- 2 Coats Of Tankguard Hb Lightgrey And Greyish Green . Dft 2 ×150 Microns. Material Cost , F/W Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Service Cost , F/W Tanks To Be Cleaned & Dried. Surface To Be Prepared Prior Painting. Paint Scheme As Follows:- 3 Coats Of Penguard Hb White/Grey/White 3×100 Microns Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Material Cost , All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken Service Cost , All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken Material Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Service Cost , Ballast Water Tanks & Fore Peak Tank To Be Cleaned, Dried And Painted. Surface To Be Prepared Prior Painting. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1 Fc Intergard 269: Dft 1*50 M, 2 Fc Intershield 300: Dft 2*150 Microns. Material Cost , Following Rubber/Ss Expansion Bellows Found Leakage And Damaged Needs To Be Replace Service Cost1. 25 Nb - 1 Nos Lo System2. 40 Nb - 5 Nos Fire Pump And Fw System3. 40 Nb (Ss) - 4 Nos Fo System4. 50 Nb - 1 Nos Bilge Ballast System5. 65 Nb - 3 Nos Ac And Gs Pump , Following Rubber/Ss Expansion Bellows Found Leakage And Damaged Needs To Be Replace Material Cost1. 25 Nb - 1 Nos Lo System2. 40 Nb - 5 Nos Fire Pump And Fw System3. 40 Nb (Ss) - 4 Nos Fo System4. 50 Nb - 1 Nos Bilge Ballast System5. 65 Nb - 3 Nos Ac And Gs Pump , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Service Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Intergard 269 1Fc Intershield 300. Material Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Service Cost , Sea Chest Grating To Be Opened, Cleaned,Painted & Refitted ( As Per U/W Paint Scheme). Material Cost , Sea Chest Manifold 200 Nb Needs To Remove Refit And Cleaning Service Cost , Sea Chest Manifold 200 Nb Needs To Remove Refit And Cleaning Material Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Service Cost , Sea Tubes To Be Cleaned, Surveyed & Painted As Per U/W Paint Scheme. Material Cost , Steel Renewal- Steel Plate Is 2062 Grade E250,Material Quality Br And Thickness Ranging 4Mm To 12 Mm Including Bulwark. Service Cost , Steel Renewal- Steel Plate Is 2062 Grade E250,Material Quality Br And Thickness Ranging 4Mm To 12 Mm Including Bulwark. Material Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat- Is 2062 Grade E250,Material Quality Br . Service Cost , Renewal Of Side Plating Transverse Angle 50X50x6 Mm - Mat-2062 Grade E250,Material Quality Br . Material Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm. 2062 Grade E250,Material Quality Br. Service Cost , Renewal Of Deck Head And Transverse Frame Angle 75X75x8 Mm. Mat - Is 2062 Grade E250,Material Quality Br . Material Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is 2062 Grade E250,Material Quality Br. Service Cost , Renewal Of Foundation Angle, Reverse Frame 75X75x10 Mm. Mat - Is2062 Grade E250,Material Quality Br . Material Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Service Cost , Pits Build Up At Various U/W Hull And Decks As Per Survey Report 1 Pts = 1 Sq Cm. Material Cost , Renew Sacrificial Anodes As Per Anode Plan. Service Cost , Renew Sacrificial Anodes As Per Anode Plan. Material Cost , Ships Name Board On Either Side Of Bridge Wing To Be Repaired As Per Existing Arrangement. Service Cost , Ships Name Board On Either Side Of Bridge Wing To Be Repaired As Per Existing Arrangement. Material Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Service Cost , Repair Ships Illuminated Name Board Fitted At Aft Side Of Bridge With Similar New Board. Material Cost , Ac Compressor No 1 Is Non Operational Service Cost , Ac Compressor No 1 Is Non Operational Material Cost , Glass Gauge May Be Provided For Both Service Tank Diesel Service Cost , Glass Gauge May Be Provided For Both Service Tank Diesel Material Cost , Steering Angle Is Mismatched About To 5 Degree Service Cost , Steering Angle Is Mismatched About To 5 Degree Material Cost , Rubber Coaming Of All Door To Be Change Service Cost , Rubber Coaming Of All Door To Be Change Material Cost , Stretcher Bed In Passenger Cabin Is To Be Change Service Cost , Stretcher Bed In Passenger Cabin Is To Be Change Material Cost , Provisioning Of Ro Water Cooler Purifier Service Cost , Provisioning Of Ro Water Cooler Purifier Material Cost , Replacement Of Life Buoys And Mob Markers With Line Service Cost , Replacement Of Life Buoys And Mob Markers With Line Material Cost , Replacement Of Hru Units Of Life Rafts Service Cost , Replacement Of Hru Units Of Life Rafts Material Cost , Replacement Of Life Rafts Securing Arrangements Service Cost , Replacement Of Life Rafts Securing Arrangements Material Cost , Water Tight Hatches Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Service Cost , Water Tight Hatches Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Material Cost , Port Hole Rubber Coaming Beading To Be Renewed. Chalk Test To Be Carried Out And Proved. Service Cost , Port Hole Rubber Coaming Beading To Be Renewed. Chalk Test To Be Carried Out And Proved. Material Cost , Forward Windlass Along With Motors To Be Overhauled. Load Trials With Chain Cable To Be Undertaken In Presence Of Class Surveyor Certificates For The Same To Be Provided Service Cost , Forward Windlass Along With Motors To Be Overhauled. Load Trials With Chain Cable To Be Undertaken In Presence Of Class Surveyor Certificates For The Same To Be Provided Material Cost , Damaged Breather Pipes Along With Wire Mesh And Drain Pipes On Weather Deck To Be Renewed As Per Existing Arrangement. Service Cost , Damaged Breather Pipes Along With Wire Mesh And Drain Pipes On Weather Deck To Be Renewed As Per Existing Arrangement. Material Cost , Renewed Of Guardrail Arrangement (3 Pipes Of 50 Mtrs). Damaged Guard Rails Including Stanchions/Guard Rail Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Service Cost , Renewed Of Guardrail Arrangement (3 Pipes Of 50 Mtrs). Damaged Guard Rails Including Stanchions/Guard Rail Dee Shackle And Turn Buckle To Be Renewed. Material: Ms. Material Cost , Dismantle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Eliminate Leakages, Repair Defective Pipes And Paint As Per Colour Coding. Service Cost , Dismantle, Chemical Clean And Pressure Test Pipe Lines In Scupper And Discharge System. Eliminate Leakages, Repair Defective Pipes And Paint As Per Colour Coding. Material Cost , Removal Of Both Anchor And Entire Chain Cable Along With All Accessories. Blasting And Survey By Class Surveyor To Be Carried Out Defective Parts To Be Renewed/Lubricated And Paint Schemce To Be Resorted As Per Approved No 53/16. A Detailed Report To Be Provided For Records Service Cost , Removal Of Both Anchor And Entire Chain Cable Along With All Accessories. Blasting And Survey By Class Surveyor To Be Carried Out Defective Parts To Be Renewed/Lubricated And Paint Schemce To Be Resorted As Per Approved No 53/16. A Detailed Report To Be Provided For Records Material Cost , Painting Of All The Internal Compartment Including Accommodation Area Service Cost , Painting Of All The Internal Compartment Including Accommodation Area Material Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved. Service Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved. Material Cost , Fire Hose Box To Be Renewed With Large Size. Matl: Frp. Service Cost , Fire Hose Box To Be Renewed With Large Size. Matl: Frp. Material Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Service Cost , Air Pipe Vent Hood At Main Deck Along With Mesh To Be Repaired. Material Cost , Ms Vent Flaps To Be Repaired. Service Cost , Ms Vent Flaps To Be Repaired. Material Cost , Twin Bollards On Main Deck To Be Renewed Size 200 Nb Dia, Thickness- 10 Mm Mat Ms Service Cost , Twin Bollards On Main Deck To Be Renewed Size 200 Nb Dia, Thickness- 10 Mm Mat Ms Material Cost , Renew All Scuppers Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Service Cost , Renew All Scuppers Pipes In Bathroom, Toilet, Galley. Mat- Gi Size 50 Nb. Material Cost , Undertake Complete Overhauling Of Boat Davit Along With Rewinding Of Motor. Load Test To Be Undertaken In Presence Of Inspection Authority Certificate For The Same To Be Provided. Service Cost , Undertake Complete Overhauling Of Boat Davit Along With Rewinding Of Motor. Load Test To Be Undertaken In Presence Of Inspection Authority Certificate For The Same To Be Provided. Material Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia: 32 Inch. Service Cost , Tyre Fenders All Around The Ship To Be Renewed. Size: Dia: 32 Inch. Material Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. Service Cost , Tyre Fenders To Be Secured With Chain Cable Of 12 Mm Dia And Length 2 Mtr Each. Material Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall. Service Cost , Sunmica To Be Renewed In Accommodation Spaces And Dining Hall. Material Cost , Nwt Marine Plywood With Lamination Wooden Doors Having In Built Locks, Handles/ Knobs/ Door Closer Of Officer Toilet & Crew Toilet Door.(Approx Size 2.5 Ft X 6 Ft). Service Cost , Nwt Marine Plywood With Lamination Wooden Doors Having In Built Locks, Handles/ Knobs/ Door Closer Of Officer Toilet & Crew Toilet Door.(Approx Size 2.5 Ft X 6 Ft). Material Cost , Crew Toilet Fresh Water Line To Be Renewed. Mat: Gi. Service Cost , Crew Toilet Fresh Water Line To Be Renewed. Mat: Gi. Material Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Service Cost , Crew Toilet Sea Water Pipe Line To Be Renewed. Mat: Cu Ni. Material Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Service Cost , Renew Wash Basin Drain Pipes. Matl: Hardened Plastic. Material Cost , Renew Ss Gents Urinal Pan With Porcel In Urinal Pan. Make: Jaquar. Service Cost , Renew Ss Gents Urinal Pan With Porcel In Urinal Pan. Make: Jaquar. Material Cost , Western Commodes Of Chief Cabin, Master Cabin, Crew, Gents And Ladies Passenger Toilets With Jet Assembly. Make:Jaquar Are To Be Renewed Service Cost , Western Commodes Of Chief Cabin, Master Cabin, Crew, Gents And Ladies Passenger Toilets With Jet Assembly. Make:Jaquar Are To Be Renewed Material Cost , All Chairs In Vip Cabin, Officers Cabin, Passengers Cabin, Master Cabin, Chief Cabin, Dining Hall, Wheel House To Be Repair Or Renewed Service Cost , All Chairs In Vip Cabin, Officers Cabin, Passengers Cabin, Master Cabin, Chief Cabin, Dining Hall, Wheel House To Be Repair Or Renewed Material Cost , Provide A Seat Cover For All Commode Toilet Service Cost , Provide A Seat Cover For All Commode Toilet Material Cost , Bib Cocks In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Bib Cocks In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Isolating Valves In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Isolating Valves In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Service Cost , Showers In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet To Be Renewed. Material Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet Water Taps, Showers And Flush Taps To Be Repair And Renewed. Service Cost , Wc Taps In Cabin Crew Toilets, Master Cabin Toilet, Engineer Cabin Toilet Water Taps, Showers And Flush Taps To Be Repair And Renewed. Material Cost , Renewal Of Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Service Cost , Renewal Of Mfmb Lagging At Various Locations Removed During Degutting. Size -25Mm. Material Cost , Macrotek Deck Covering Of Bridge, All Wcs, Engineers And Master Cabin ,Cabin Lobby, Mess/Rec Room, Pantry, Crew Bathroom To Be Renewed (Damaged Area Only). Service Cost , Macrotek Deck Covering Of Bridge, All Wcs, Engineers And Master Cabin ,Cabin Lobby, Mess/Rec Room, Pantry, Crew Bathroom To Be Renewed (Damaged Area Only). Material Cost , Water Cooler To Be Overhauled/ Repaired/ Routines To Be Undertaken & Cleaned. Make: Blue Star. Service Cost , Water Cooler To Be Overhauled/ Repaired/ Routines To Be Undertaken & Cleaned. Make: Blue Star. Material Cost , Nr Routines Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers, Renew Bearing If Required. (C) Clean Internal Surface Of Trunking, Grease Filters, Ball Valves Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line. (D) Renew Air Filters/ Pads. Service Cost , Nr Routines Of Atu As Per Maintops. (A) Clean D Ers And Fan Impellers And Ahu. (B) Undertake Spm Checks Of Motors And Blowers, Renew Bearing If Required. (C) Clean Internal Surface Of Trunking, Grease Filters, Ball Valves Of Air Eliminators Of Hw Expansion Tanks And Hot Water Line. (D) Renew Air Filters/ Pads. Material Cost , Replace Hru And Coat Hanger With 32 In Nos Safety Belts For 16 In Nos Life Raft. Service Cost , Replace Hru And Coat Hanger With 32 In Nos Safety Belts For 16 In Nos Life Raft. Material Cost , Carry Out Major Overhauling Of Both Main Engine. Routines To Be Carried Out By Oem. Make: Cummins, Model: Kta19m4. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Both Main Engine. Routines To Be Carried Out By Oem. Make: Cummins, Model: Kta19m4. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Carry Out Major Overhauling Of Both Dg. Routines To Be Carried Out By Oem. Make: Koel, Model: 6Sl 1500Ta. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Both Dg. Routines To Be Carried Out By Oem. Make: Koel, Model: 6Sl 1500Ta. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Both Dg Sea Water Pump Needs To Be Overhaul Service Cost , Both Dg Sea Water Pump Needs To Be Overhaul Material Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water Cooler, After Air, Lub Oilcoolers Found Leaking During Pressure Testing . Service Cost , Undertake Cleaning And Pressure Testing Of Main Engine Fresh Water Cooler, After Air, Lub Oilcoolers Found Leaking During Pressure Testing . Material Cost , Cooler Drain Line Found Jammed At Passenger Area Needs To Remove, Service And Refitting Service Cost , Cooler Drain Line Found Jammed At Passenger Area Needs To Remove, Service And Refitting Material Cost , Renewal Of Muffler Of Both Main Engine And Dg Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Service Cost , Renewal Of Muffler Of Both Main Engine And Dg Exhaust System As Per S Le (Press Test At 5 Kg/Cm2). Material Cost , All Systems Main Engine & Dg, Pressure Gauge And Vacuum Gauge Thermometer, Need To Calibration And Replace With New Gauge Service Cost , All Systems Main Engine & Dg, Pressure Gauge And Vacuum Gauge Thermometer, Need To Calibration And Replace With New Gauge Material Cost , M E & Dg Control Panel Is Need To Calibrate Service Cost , M E & Dg Control Panel Is Need To Calibrate Material Cost , Undertake Functional Checks Of Main Engine Local Control Panel And Remote Control Panel At Wheel House. Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Service Cost , Undertake Functional Checks Of Main Engine Local Control Panel And Remote Control Panel At Wheel House. Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Material Cost , Undertake Complete Rewinding Of Stator And Rotor Winding, Renewal Of Bearings, Renewal Of Avr, Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50 Hz Alternator (Make - Kirloskar). Service Cost , Undertake Complete Rewinding Of Stator And Rotor Winding, Renewal Of Bearings, Renewal Of Avr, Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50 Hz Alternator (Make - Kirloskar). Material Cost , Undertake Functional Checks Of Da Local Control Panel And Remote Control Panel Onboard Ferry Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Service Cost , Undertake Functional Checks Of Da Local Control Panel And Remote Control Panel Onboard Ferry Craft And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms Etc. Material Cost , Renewal Of Exhuast Compensator Of Both Dgs. Mat : Ss. Dia 100Mm. Service Cost , Renewal Of Exhuast Compensator Of Both Dgs. Mat : Ss. Dia 100Mm. Material Cost , Undertake Cleaning And Pressure Testing Of Dg Fresh Water, After Cooler And Lub Oil Cooler. Service Cost , Undertake Cleaning And Pressure Testing Of Dg Fresh Water, After Cooler And Lub Oil Cooler. Material Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type Ep140, Qty 40 Ltr/Gear Box). Service Cost , Drain And Flush Gear Box Oil Sump And Fill With Fresh Oil (Oil Type Ep140, Qty 40 Ltr/Gear Box). Material Cost , Undertake Cleaning And Pressure Testing Of Gear Box Lub Oil Coolers. Service Cost , Undertake Cleaning And Pressure Testing Of Gear Box Lub Oil Coolers. Material Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Fc And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timermotor And Relays Through Oem Authorised Reps. Service Cost , Undertake Functional Checks Of Gear Box Control Panel Onboard Tug And Replace/ Rectify Defective Instrumentation, Wiring, Indications, Swithces, Alarms, Timermotor And Relays Through Oem Authorised Reps. Material Cost , Carry Out 6000 Hourly Routine And Major Overhauling Of Both Gear Box Make - Zf Marine, Model - W650. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out 6000 Hourly Routine And Major Overhauling Of Both Gear Box Make - Zf Marine, Model - W650. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Carry Out Major Overhauling Of Ac Plant. Routines To Be Carried Out By Oem. Make - Kpcl, Model - 32Tr. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Carry Out Major Overhauling Of Ac Plant. Routines To Be Carried Out By Oem. Make - Kpcl, Model - 32Tr. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Replace Thordon Bearings Of A Bracket And Stern Tube Of Both Shaft Lines, Record Clearances Post Renewal. Service Cost , Replace Thordon Bearings Of A Bracket And Stern Tube Of Both Shaft Lines, Record Clearances Post Renewal. Material Cost , Overhaul Stern Tube Stuffing Boxes/Deep Sea Seal. Replace Securing Stud And Re- Assemble. Service Cost , Overhaul Stern Tube Stuffing Boxes. Replace Securing Stud And Re- Assemble. Material Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Service Cost , Examine And Clean Propeller. Any Minor Nicks, Or Chips On Edges To Be Filed Fair And Recovered For Rectification During Dry Docking. Condition Of Epoxy Putty At Base Of Fairing To Be Checked And Defects Rectified. Material Cost , Major Overhaul Of Fuel Oil Centrifuge Along With Motor And Associated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Service Cost , Major Overhaul Of Fuel Oil Centrifuge Along With Motor And Associated Controls And Instrumentation (Make Alfa Laval, Model Mab 103B) As Per Alfa Laval Manual To Be Carried Out. Material Cost , Undertake Overhauling Of Seawage Treatment Plant (Stp) And Control Panel To Be Carried Out And System To Proved Onboard Craft Post Overhauling. Routines To Be Carried Out By Oem. Make - Hamworthy, Model 9804140099. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , Undertake Overhauling Of Seawage Treatment Plant (Stp) And Control Panel To Be Carried Out And System To Proved Onboard Craft Post Overhauling. Routines To Be Carried Out By Oem. Make - Hamworthy, Model 9804140099. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi ) Aong With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Service Cost , 1000 Hrly Routines Of Air Compressors, (Make Elgi ) Aong With Motor And Associated Controls And Instrumentation In Accordance With Elgi Reciprocating Air Compressor Manual To Be Carried Out. All Defective Components/Spares In Auxliary Associated To Engine To Be Repaired/Renewed As Nesscary Test And Trails To Be Undertaken And Proved. Material Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Service Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M154 T. Material Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Service Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel. Make : Mody, Model M100 M. Material Cost , Overhauling Of Fuel Oil Transfer Pump Along With Motor And Starter, Qyt 01 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fuel Oil Transfer Pump Along With Motor And Starter, Qyt 01 (Make: Royson Engineering, Capacity: 1.5 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter Need To Repair And Not Run In Auto Mode,(Make: Be, Type: Ao3110 , Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Service Cost , Overhauling Of Fresh Water Pump Along With Motor And Starter Need To Repair And Not Run In Auto Mode,(Make: Be, Type: Ao3110 , Capacity: 3.75 M3/Hr). Pump To Be Proved Onboard For Rated Output Post Fitment. Material Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type- Ch/Chr/Cv Cap- 30 Tph). Service Cost , Overhauling Of Bilge Pumps Along With Motor And Starter, To Be Carried Out (Make- Be Type- Ch/Chr/Cv Cap- 30 Tph). Material Cost , Overhauling Of Gs Pumps Along With Motor And Starter, To Be Carried Out (Make- Storck Type- Ch/Chr/Cv Cap- 45 Tph). Service Cost , Overhauling Of Gs Pumps Along With Motor And Starter, To Be Carried Out (Make- Storck Type- Ch/Chr/Cv Cap- 45 Tph). Material Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Service Cost , Renewal Of Suction / Discharge / System Line Pressure Gauges For Various Equipments Fitted Onboard. Material Cost , Renewal Of All Gauge Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Service Cost , Renewal Of All Gauge Lines With End Fittings Of Pressure Gauges And Cut Outs As Per S Le. Mat : Cuni. Material Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment. Service Cost , All System Valves To Be Removed, Overhauled / Repaired, Pressure Tested, Refitted And System Proved Post Fitment. Material Cost , Calibration/Renewal Of All Temperature Gauges Of The Systems. Service Cost , Calibration/Renewal Of All Temperature Gauges Of The Systems. Material Cost , Cleaning & Pressure Testing Of Evaporator Coil Of Atu System And Atu Filter To Be Repair/ Renenew Defective Item & Condensor Coil. Make - Kpcl. Prove The System For Optimum Performance. Service Cost , Cleaning & Pressure Testing Of Evaporator Coil Of Atu System And Atu Filter To Be Repair/ Renenew Defective Item & Condensor Coil. Make - Kpcl. Prove The System For Optimum Performance. Material Cost
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. SERVICE COST | U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. SERVICE COST |
| 2 | U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. MATERIAL COST | U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH. MATERIAL COST |
| 3 | U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. SERVICE COST | U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. SERVICE COST |
| 4 | U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. MATERIAL COST | U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTER GUARD 269: DFT 150 MICRON, 2 FC INTER SHIELD 300: DFT 2*150 MICRON, 1 FC INTER GUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M. B/T PAINT SCHEME:-. 1 FC INTER GUARD 269; DFT 1*50 M, 2 FC INTER SHIELD 300; DFT 2*150 M, 1 FC INTER GUARD 263: DFT 1*125 M, 3 FC ANTIFOULING INTERSMOOTH 360SPC: DFT 3*150 M, LAST COAT BLACK. MATERIAL COST |
| 5 | UTG READINGS AT UNDER WATER, ABOVE WATER AND DECK AREA TO BE CARIED OUT. DETAILED HULL SURVEY REPORT TO BE PROVIDED TO THE CUSTOMER POST RENEWAL AND CERTIFICATION SERVICE COST | UTG READINGS AT UNDER WATER, ABOVE WATER AND DECK AREA TO BE CARIED OUT. DETAILED HULL SURVEY REPORT TO BE PROVIDED TO THE CUSTOMER POST RENEWAL AND CERTIFICATION SERVICE COST |
| 6 | SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. SERVICE COST | SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. SERVICE COST |
| 7 | SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. MATERIAL COST | SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGARD 259: DFT 1* 50 M, 2ND &3RD COAT INTERTUFF 265:DFT2*125 M, 2 FULL COAT INTERTHANE 990:DFT 2*60 M. MATERIAL COST |
| 8 | SUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. SERVICE COST | SUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. SERVICE COST |
| 9 | SUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. MATERIAL COST | SUPERSTRUCTURE/ MAST TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERGUARD 269: DFT 1*50 M, 2ND COAT&3RD COAT INTERTUFF 262:DFT2*125 M, 4TH FULL COAT INTERTHANE 990:DFT1*60 M. MATERIAL COST |
| 10 | WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. SERVICE COST | WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. SERVICE COST |
| 11 | WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. MATERIAL COST | WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGARD 269: DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800 M. MATERIAL COST |
| 12 | GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. SERVICE COST | GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. SERVICE COST |
| 13 | GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. MATERIAL COST | GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINIT TOUGH UP TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTERPRIME 538: DFT 1*75 M, 2 FC INTERLAC 665: DFT 2*50 M. MATERIAL COST |
| 14 | BULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. SERVICE COST | BULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. SERVICE COST |
| 15 | BULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. MATERIAL COST | BULK HEAD & DECK OF WET SPACES LIKE TOILETS, BATHS, WASHING AREA TO BE CLEANED, DRED & PAINTED, PAINT SCHEME: 1ST COAT INTERPRIME 538: DFT 1*80 M. 2 FC INTERLAC 665: DFT 2*40 M. MATERIAL COST |
| 16 | E/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. SERVICE COST | E/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. SERVICE COST |
| 17 | E/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. MATERIAL COST | E/R BILGES & STEERING COMPARTMENT TO BE CLEANED, DRED & PAINTED. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOW - 1ST COAT INTERGARD 269:DFT 1*50 M, 2 FC INTERSHIELD 300:DFT 2*150 M. MATERIAL COST |
| 18 | FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. SERVICE COST | FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. SERVICE COST |
| 19 | FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. MATERIAL COST | FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE . SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANKGUARD HB LIGHTGREY AND GREYISH GREEN . DFT 2 ×150 MICRONS. MATERIAL COST |
| 20 | F/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. SERVICE COST | F/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. SERVICE COST |
| 21 | F/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. MATERIAL COST | F/W TANKS TO BE CLEANED & DRIED. SURFACE TO BE PREPARED PRIOR PAINTING. PAINT SCHEME AS FOLLOWS:- 3 COATS OF PENGUARD HB WHITE/GREY/WHITE 3×100 MICRONS RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. MATERIAL COST |
| 22 | ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN SERVICE COST | ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN SERVICE COST |
| 23 | ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN MATERIAL COST | ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN MATERIAL COST |
| 24 | BALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. SERVICE COST | BALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. SERVICE COST |
| 25 | BALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. MATERIAL COST | BALLAST WATER TANKS & FORE PEAK TANK TO BE CLEANED, DRIED AND PAINTED. SURFACE TO BE PREPARED PRIOR PAINTING. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1 FC INTERGARD 269: DFT 1*50 M, 2 FC INTERSHIELD 300: DFT 2*150 MICRONS. MATERIAL COST |
| 26 | FOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE SERVICE COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMP | FOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE SERVICE COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMP |
| 27 | FOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE MATERIAL COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMP | FOLLOWING RUBBER/SS EXPANSION BELLOWS FOUND LEAKAGE AND DAMAGED NEEDS TO BE REPLACE MATERIAL COST1. 25 NB - 1 NOS LO SYSTEM2. 40 NB - 5 NOS FIRE PUMP AND FW SYSTEM3. 40 NB (SS) - 4 NOS FO SYSTEM4. 50 NB - 1 NOS BILGE BALLAST SYSTEM5. 65 NB - 3 NOS AC AND GS PUMP |
| 28 | SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. SERVICE COST | SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. SERVICE COST |
| 29 | SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. MATERIAL COST | SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGARD 269 1FC INTERSHIELD 300. MATERIAL COST |
| 30 | SEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). SERVICE COST | SEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). SERVICE COST |
| 31 | SEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). MATERIAL COST | SEA CHEST GRATING TO BE OPENED, CLEANED,PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). MATERIAL COST |
| 32 | SEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING SERVICE COST | SEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING SERVICE COST |
| 33 | SEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING MATERIAL COST | SEA CHEST MANIFOLD 200 NB NEEDS TO REMOVE REFIT AND CLEANING MATERIAL COST |
| 34 | SEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. SERVICE COST | SEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. SERVICE COST |
| 35 | SEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. MATERIAL COST | SEA TUBES TO BE CLEANED, SURVEYED & PAINTED AS PER U/W PAINT SCHEME. MATERIAL COST |
| 36 | STEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. SERVICE COST | STEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. SERVICE COST |
| 37 | STEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. MATERIAL COST | STEEL RENEWAL- STEEL PLATE IS 2062 GRADE E250,MATERIAL QUALITY 'BR' AND THICKNESS RANGING 4MM TO 12 MM INCLUDING BULWARK. MATERIAL COST |
| 38 | RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT- IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . SERVICE COST | RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT- IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . SERVICE COST |
| 39 | RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT-2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST | RENEWAL OF SIDE PLATING TRANSVERSE ANGLE 50X50X6 MM - MAT-2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST |
| 40 | RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COST | RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COST |
| 41 | RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST | RENEWAL OF DECK HEAD AND TRANSVERSE FRAME ANGLE 75X75X8 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST |
| 42 | RENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COST | RENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS 2062 GRADE E250,MATERIAL QUALITY 'BR'. SERVICE COST |
| 43 | RENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST | RENEWAL OF FOUNDATION ANGLE, REVERSE FRAME 75X75X10 MM. MAT - IS2062 GRADE E250,MATERIAL QUALITY 'BR' . MATERIAL COST |
| 44 | PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. SERVICE COST | PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. SERVICE COST |
| 45 | PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. MATERIAL COST | PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEY REPORT 1 PTS = 1 SQ CM. MATERIAL COST |
| 46 | RENEW SACRIFICIAL ANODES AS PER ANODE PLAN. SERVICE COST | RENEW SACRIFICIAL ANODES AS PER ANODE PLAN. SERVICE COST |
| 47 | RENEW SACRIFICIAL ANODES AS PER ANODE PLAN. MATERIAL COST | RENEW SACRIFICIAL ANODES AS PER ANODE PLAN. MATERIAL COST |
| 48 | SHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. SERVICE COST | SHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. SERVICE COST |
| 49 | SHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. MATERIAL COST | SHIP'S NAME BOARD ON EITHER SIDE OF BRIDGE WING TO BE REPAIRED AS PER EXISTING ARRANGEMENT. MATERIAL COST |
| 50 | REPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. SERVICE COST | REPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. SERVICE COST |
| 51 | REPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. MATERIAL COST | REPAIR SHIP'S ILLUMINATED NAME BOARD FITTED AT AFT SIDE OF BRIDGE WITH SIMILAR NEW BOARD. MATERIAL COST |
| 52 | AC COMPRESSOR NO 1 IS NON OPERATIONAL SERVICE COST | AC COMPRESSOR NO 1 IS NON OPERATIONAL SERVICE COST |
| 53 | AC COMPRESSOR NO 1 IS NON OPERATIONAL MATERIAL COST | AC COMPRESSOR NO 1 IS NON OPERATIONAL MATERIAL COST |
| 54 | GLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL SERVICE COST | GLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL SERVICE COST |
| 55 | GLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL MATERIAL COST | GLASS GAUGE MAY BE PROVIDED FOR BOTH SERVICE TANK DIESEL MATERIAL COST |
| 56 | STEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE SERVICE COST | STEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE SERVICE COST |
| 57 | STEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE MATERIAL COST | STEERING ANGLE IS MISMATCHED ABOUT TO 5 DEGREE MATERIAL COST |
| 58 | RUBBER COAMING OF ALL DOOR TO BE CHANGE SERVICE COST | RUBBER COAMING OF ALL DOOR TO BE CHANGE SERVICE COST |
| 59 | RUBBER COAMING OF ALL DOOR TO BE CHANGE MATERIAL COST | RUBBER COAMING OF ALL DOOR TO BE CHANGE MATERIAL COST |
| 60 | STRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE SERVICE COST | STRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE SERVICE COST |
| 61 | STRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE MATERIAL COST | STRETCHER BED IN PASSENGER CABIN IS TO BE CHANGE MATERIAL COST |
| 62 | PROVISIONING OF RO WATER COOLER PURIFIER SERVICE COST | PROVISIONING OF RO WATER COOLER PURIFIER SERVICE COST |
| 63 | PROVISIONING OF RO WATER COOLER PURIFIER MATERIAL COST | PROVISIONING OF RO WATER COOLER PURIFIER MATERIAL COST |
| 64 | REPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE SERVICE COST | REPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE SERVICE COST |
| 65 | REPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE MATERIAL COST | REPLACEMENT OF LIFE BUOYS AND MOB MARKERS WITH LINE MATERIAL COST |
| 66 | REPLACEMENT OF HRU UNITS OF LIFE RAFTS SERVICE COST | REPLACEMENT OF HRU UNITS OF LIFE RAFTS SERVICE COST |
| 67 | REPLACEMENT OF HRU UNITS OF LIFE RAFTS MATERIAL COST | REPLACEMENT OF HRU UNITS OF LIFE RAFTS MATERIAL COST |
| 68 | REPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS SERVICE COST | REPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS SERVICE COST |
| 69 | REPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS MATERIAL COST | REPLACEMENT OF LIFE RAFTS SECURING ARRANGEMENTS MATERIAL COST |
| 70 | WATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. SERVICE COST | WATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. SERVICE COST |
| 71 | WATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. MATERIAL COST | WATER TIGHT HATCHES RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. MATERIAL COST |
| 72 | PORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. SERVICE COST | PORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. SERVICE COST |
| 73 | PORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. MATERIAL COST | PORT HOLE RUBBER COAMING BEADING TO BE RENEWED. CHALK TEST TO BE CARRIED OUT AND PROVED. MATERIAL COST |
| 74 | FORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED SERVICE COST | FORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED SERVICE COST |
| 75 | FORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED MATERIAL COST | FORWARD WINDLASS ALONG WITH MOTORS TO BE OVERHAULED. LOAD TRIALS WITH CHAIN CABLE TO BE UNDERTAKEN IN PRESENCE OF CLASS SURVEYOR CERTIFICATES FOR THE SAME TO BE PROVIDED MATERIAL COST |
| 76 | DAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. SERVICE COST | DAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. SERVICE COST |
| 77 | DAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. MATERIAL COST | DAMAGED BREATHER PIPES ALONG WITH WIRE MESH AND DRAIN PIPES ON WEATHER DECK TO BE RENEWED AS PER EXISTING ARRANGEMENT. MATERIAL COST |
| 78 | RENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. SERVICE COST | RENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. SERVICE COST |
| 79 | RENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. MATERIAL COST | RENEWED OF GUARDRAIL ARRANGEMENT (3 PIPES OF 50 MTRS). DAMAGED GUARD RAILS INCLUDING STANCHIONS/GUARD RAIL DEE SHACKLE AND TURN BUCKLE TO BE RENEWED. MATERIAL: MS. MATERIAL COST |
| 80 | DISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. SERVICE COST | DISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. SERVICE COST |
| 81 | DISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. MATERIAL COST | DISMANTLE, CHEMICAL CLEAN AND PRESSURE TEST PIPE LINES IN SCUPPER AND DISCHARGE SYSTEM. ELIMINATE LEAKAGES, REPAIR DEFECTIVE PIPES AND PAINT AS PER COLOUR CODING. MATERIAL COST |
| 82 | REMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS SERVICE COST | REMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS SERVICE COST |
| 83 | REMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS MATERIAL COST | REMOVAL OF BOTH ANCHOR AND ENTIRE CHAIN CABLE ALONG WITH ALL ACCESSORIES. BLASTING AND SURVEY BY CLASS SURVEYOR TO BE CARRIED OUT DEFECTIVE PARTS TO BE RENEWED/LUBRICATED AND PAINT SCHEMCE TO BE RESORTED AS PER APPROVED NO 53/16. A DETAILED REPORT TO BE PROVIDED FOR RECORDS MATERIAL COST |
| 84 | PAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA SERVICE COST | PAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA SERVICE COST |
| 85 | PAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA MATERIAL COST | PAINTING OF ALL THE INTERNAL COMPARTMENT INCLUDING ACCOMMODATION AREA MATERIAL COST |
| 86 | ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. SERVICE COST | ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. SERVICE COST |
| 87 | ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. MATERIAL COST | ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED. MATERIAL COST |
| 88 | FIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. SERVICE COST | FIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. SERVICE COST |
| 89 | FIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. MATERIAL COST | FIRE HOSE BOX TO BE RENEWED WITH LARGE SIZE. MATL: FRP. MATERIAL COST |
| 90 | AIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. SERVICE COST | AIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. SERVICE COST |
| 91 | AIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. MATERIAL COST | AIR PIPE VENT HOOD AT MAIN DECK ALONG WITH MESH TO BE REPAIRED. MATERIAL COST |
| 92 | MS VENT FLAPS TO BE REPAIRED. SERVICE COST | MS VENT FLAPS TO BE REPAIRED. SERVICE COST |
| 93 | MS VENT FLAPS TO BE REPAIRED. MATERIAL COST | MS VENT FLAPS TO BE REPAIRED. MATERIAL COST |
| 94 | TWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS SERVICE COST | TWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS SERVICE COST |
| 95 | TWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS MATERIAL COST | TWIN BOLLARDS ON MAIN DECK TO BE RENEWED SIZE 200 NB DIA, THICKNESS- 10 MM MAT MS MATERIAL COST |
| 96 | RENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. SERVICE COST | RENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. SERVICE COST |
| 97 | RENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. MATERIAL COST | RENEW ALL SCUPPERS PIPES IN BATHROOM, TOILET, GALLEY. MAT- GI SIZE 50 NB. MATERIAL COST |
| 98 | UNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. SERVICE COST | UNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. SERVICE COST |
| 99 | UNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. MATERIAL COST | UNDERTAKE COMPLETE OVERHAULING OF BOAT DAVIT ALONG WITH REWINDING OF MOTOR. LOAD TEST TO BE UNDERTAKEN IN PRESENCE OF INSPECTION AUTHORITY CERTIFICATE FOR THE SAME TO BE PROVIDED. MATERIAL COST |
| 100 | TYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. SERVICE COST | TYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. SERVICE COST |
| 101 | TYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. MATERIAL COST | TYRE FENDERS ALL AROUND THE SHIP TO BE RENEWED. SIZE: DIA: 32 INCH. MATERIAL COST |
| 102 | TYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. SERVICE COST | TYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. SERVICE COST |
| 103 | TYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. MATERIAL COST | TYRE FENDERS TO BE SECURED WITH CHAIN CABLE OF 12 MM DIA AND LENGTH 2 MTR EACH. MATERIAL COST |
| 104 | SUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. SERVICE COST | SUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. SERVICE COST |
| 105 | SUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. MATERIAL COST | SUNMICA TO BE RENEWED IN ACCOMMODATION SPACES AND DINING HALL. MATERIAL COST |
| 106 | NWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). SERVICE COST | NWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). SERVICE COST |
| 107 | NWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). MATERIAL COST | NWT MARINE PLYWOOD WITH LAMINATION WOODEN DOORS HAVING IN BUILT LOCKS, HANDLES/ KNOBS/ DOOR CLOSER OF OFFICER TOILET & CREW TOILET DOOR.(APPROX SIZE 2.5 FT X 6 FT). MATERIAL COST |
| 108 | CREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. SERVICE COST | CREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. SERVICE COST |
| 109 | CREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. MATERIAL COST | CREW TOILET FRESH WATER LINE TO BE RENEWED. MAT: GI. MATERIAL COST |
| 110 | CREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. SERVICE COST | CREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. SERVICE COST |
| 111 | CREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. MATERIAL COST | CREW TOILET SEA WATER PIPE LINE TO BE RENEWED. MAT: CU NI. MATERIAL COST |
| 112 | RENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. SERVICE COST | RENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. SERVICE COST |
| 113 | RENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. MATERIAL COST | RENEW WASH BASIN DRAIN PIPES. MATL: HARDENED PLASTIC. MATERIAL COST |
| 114 | RENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. SERVICE COST | RENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. SERVICE COST |
| 115 | RENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. MATERIAL COST | RENEW SS GENTS URINAL PAN WITH PORCEL IN URINAL PAN. MAKE: JAQUAR. MATERIAL COST |
| 116 | WESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED SERVICE COST | WESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED SERVICE COST |
| 117 | WESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED MATERIAL COST | WESTERN COMMODES OF CHIEF CABIN, MASTER CABIN, CREW, GENTS AND LADIES PASSENGER TOILETS WITH JET ASSEMBLY. MAKE:JAQUAR ARE TO BE RENEWED MATERIAL COST |
| 118 | ALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED SERVICE COST | ALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED SERVICE COST |
| 119 | ALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED MATERIAL COST | ALL CHAIRS IN VIP CABIN, OFFICERS CABIN, PASSENGERS CABIN, MASTER CABIN, CHIEF CABIN, DINING HALL, WHEEL HOUSE TO BE REPAIR OR RENEWED MATERIAL COST |
| 120 | PROVIDE A SEAT COVER FOR ALL COMMODE TOILET SERVICE COST | PROVIDE A SEAT COVER FOR ALL COMMODE TOILET SERVICE COST |
| 121 | PROVIDE A SEAT COVER FOR ALL COMMODE TOILET MATERIAL COST | PROVIDE A SEAT COVER FOR ALL COMMODE TOILET MATERIAL COST |
| 122 | BIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST | BIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST |
| 123 | BIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST | BIB COCKS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST |
| 124 | ISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST | ISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST |
| 125 | ISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST | ISOLATING VALVES IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST |
| 126 | SHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST | SHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. SERVICE COST |
| 127 | SHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST | SHOWERS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET TO BE RENEWED. MATERIAL COST |
| 128 | WC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. SERVICE COST | WC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. SERVICE COST |
| 129 | WC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. MATERIAL COST | WC TAPS IN CABIN CREW TOILETS, MASTER CABIN TOILET, ENGINEER CABIN TOILET WATER TAPS, SHOWERS AND FLUSH TAPS TO BE REPAIR AND RENEWED. MATERIAL COST |
| 130 | RENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. SERVICE COST | RENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. SERVICE COST |
| 131 | RENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. MATERIAL COST | RENEWAL OF MFMB LAGGING AT VARIOUS LOCATIONS REMOVED DURING DEGUTTING. SIZE -25MM. MATERIAL COST |
| 132 | MACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). SERVICE COST | MACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). SERVICE COST |
| 133 | MACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). MATERIAL COST | MACROTEK DECK COVERING OF BRIDGE, ALL WCs, ENGINEERS AND MASTER CABIN ,CABIN LOBBY, MESS/REC ROOM, PANTRY, CREW BATHROOM TO BE RENEWED (DAMAGED AREA ONLY). MATERIAL COST |
| 134 | WATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. SERVICE COST | WATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. SERVICE COST |
| 135 | WATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. MATERIAL COST | WATER COOLER TO BE OVERHAULED/ REPAIRED/ ROUTINES TO BE UNDERTAKEN & CLEANED. MAKE: BLUE STAR. MATERIAL COST |
| 136 | NR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. SERVICE COST | NR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. SERVICE COST |
| 137 | NR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. MATERIAL COST | NR ROUTINES OF ATU AS PER MAINTOPS. (A) CLEAN DAMPERS AND FAN IMPELLERS AND AHU. (B) UNDERTAKE SPM CHECKS OF MOTORS AND BLOWERS, RENEW BEARING IF REQUIRED. (C) CLEAN INTERNAL SURFACE OF TRUNKING, GREASE FILTERS, BALL VALVES OF AIR ELIMINATORS OF HW EXPANSION TANKS AND HOT WATER LINE. (D) RENEW AIR FILTERS/ PADS. MATERIAL COST |
| 138 | REPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. SERVICE COST | REPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. SERVICE COST |
| 139 | REPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. MATERIAL COST | REPLACE HRU AND COAT HANGER WITH 32 IN NOS SAFETY BELTS FOR 16 IN NOS LIFE RAFT. MATERIAL COST |
| 140 | CARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST | CARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST |
| 141 | CARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST | CARRY OUT MAJOR OVERHAULING OF BOTH MAIN ENGINE. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: CUMMINS, MODEL: KTA19M4. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST |
| 142 | CARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST | CARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST |
| 143 | CARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST | CARRY OUT MAJOR OVERHAULING OF BOTH DG. ROUTINES TO BE CARRIED OUT BY OEM. MAKE: KOEL, MODEL: 6SL 1500TA. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST |
| 144 | BOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL SERVICE COST | BOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL SERVICE COST |
| 145 | BOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL MATERIAL COST | BOTH DG SEA WATER PUMP NEEDS TO BE OVERHAUL MATERIAL COST |
| 146 | UNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . SERVICE COST | UNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . SERVICE COST |
| 147 | UNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . MATERIAL COST | UNDERTAKE CLEANING AND PRESSURE TESTING OF MAIN ENGINE FRESH WATER COOLER, AFTER AIR, LUB OILCOOLERS FOUND LEAKING DURING PRESSURE TESTING . MATERIAL COST |
| 148 | COOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING SERVICE COST | COOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING SERVICE COST |
| 149 | COOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING MATERIAL COST | COOLER DRAIN LINE FOUND JAMMED AT PASSENGER AREA NEEDS TO REMOVE, SERVICE AND REFITTING MATERIAL COST |
| 150 | RENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). SERVICE COST | RENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). SERVICE COST |
| 151 | RENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). MATERIAL COST | RENEWAL OF MUFFLER OF BOTH MAIN ENGINE AND DG EXHAUST SYSTEM AS PER SAMPLE (PRESS TEST AT 5 KG/CM2). MATERIAL COST |
| 152 | ALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE SERVICE COST | ALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE SERVICE COST |
| 153 | ALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE MATERIAL COST | ALL SYSTEMS MAIN ENGINE & DG, PRESSURE GAUGE AND VACUUM GAUGE THERMOMETER, NEED TO CALIBRATION AND REPLACE WITH NEW GAUGE MATERIAL COST |
| 154 | M E & DG CONTROL PANEL IS NEED TO CALIBRATE SERVICE COST | M E & DG CONTROL PANEL IS NEED TO CALIBRATE SERVICE COST |
| 155 | M E & DG CONTROL PANEL IS NEED TO CALIBRATE MATERIAL COST | M E & DG CONTROL PANEL IS NEED TO CALIBRATE MATERIAL COST |
| 156 | UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COST | UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COST |
| 157 | UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COST | UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL AT WHEEL HOUSE. REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COST |
| 158 | UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). SERVICE COST | UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). SERVICE COST |
| 159 | UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). MATERIAL COST | UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING, RENEWAL OF BEARINGS, RENEWAL OF AVR, REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50 HZ ALTERNATOR (MAKE - KIRLOSKAR). MATERIAL COST |
| 160 | UNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COST | UNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. SERVICE COST |
| 161 | UNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COST | UNDERTAKE FUNCTIONAL CHECKS OF DA LOCAL CONTROL PANEL AND REMOTE CONTROL PANEL ONBOARD FERRY CRAFT AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS ETC. MATERIAL COST |
| 162 | RENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. SERVICE COST | RENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. SERVICE COST |
| 163 | RENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. MATERIAL COST | RENEWAL OF EXHUAST COMPENSATOR OF BOTH DG'S. MAT : SS. DIA 100MM. MATERIAL COST |
| 164 | UNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. SERVICE COST | UNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. SERVICE COST |
| 165 | UNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. MATERIAL COST | UNDERTAKE CLEANING AND PRESSURE TESTING OF DG FRESH WATER, AFTER COOLER AND LUB OIL COOLER. MATERIAL COST |
| 166 | DRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). SERVICE COST | DRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). SERVICE COST |
| 167 | DRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). MATERIAL COST | DRAIN AND FLUSH GEAR BOX OIL SUMP AND FILL WITH FRESH OIL (OIL TYPE EP140, QTY 40 LTR/GEAR BOX). MATERIAL COST |
| 168 | UNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. SERVICE COST | UNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. SERVICE COST |
| 169 | UNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. MATERIAL COST | UNDERTAKE CLEANING AND PRESSURE TESTING OF GEAR BOX LUB OIL COOLERS. MATERIAL COST |
| 170 | UNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD FC AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. SERVICE COST | UNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD FC AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. SERVICE COST |
| 171 | UNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD TUG AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. MATERIAL COST | UNDERTAKE FUNCTIONAL CHECKS OF GEAR BOX CONTROL PANEL ONBOARD TUG AND REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION, WIRING, INDICATIONS, SWITHCES, ALARMS, TIMERMOTOR AND RELAYS THROUGH OEM AUTHORISED REPS. MATERIAL COST |
| 172 | CARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST | CARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST |
| 173 | CARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST | CARRY OUT 6000 HOURLY ROUTINE AND MAJOR OVERHAULING OF BOTH GEAR BOX MAKE - ZF MARINE, MODEL - W650. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST |
| 174 | CARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST | CARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST |
| 175 | CARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST | CARRY OUT MAJOR OVERHAULING OF AC PLANT. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - KPCL, MODEL - 32TR. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST |
| 176 | REPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. SERVICE COST | REPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. SERVICE COST |
| 177 | REPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. MATERIAL COST | REPLACE THORDON BEARINGS OF 'A' BRACKET AND STERN TUBE OF BOTH SHAFT LINES, RECORD CLEARANCES POST RENEWAL. MATERIAL COST |
| 178 | OVERHAUL STERN TUBE STUFFING BOXES/DEEP SEA SEAL. REPLACE SECURING STUD AND RE- ASSEMBLE. SERVICE COST | OVERHAUL STERN TUBE STUFFING BOXES/DEEP SEA SEAL. REPLACE SECURING STUD AND RE- ASSEMBLE. SERVICE COST |
| 179 | OVERHAUL STERN TUBE STUFFING BOXES. REPLACE SECURING STUD AND RE- ASSEMBLE. MATERIAL COST | OVERHAUL STERN TUBE STUFFING BOXES. REPLACE SECURING STUD AND RE- ASSEMBLE. MATERIAL COST |
| 180 | EXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. SERVICE COST | EXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. SERVICE COST |
| 181 | EXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. MATERIAL COST | EXAMINE AND CLEAN PROPELLER. ANY MINOR NICKS, OR CHIPS ON EDGES TO BE FILED FAIR AND RECOVERED FOR RECTIFICATION DURING DRY DOCKING. CONDITION OF EPOXY PUTTY AT BASE OF FAIRING TO BE CHECKED AND DEFECTS RECTIFIED. MATERIAL COST |
| 182 | MAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. SERVICE COST | MAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. SERVICE COST |
| 183 | MAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. MATERIAL COST | MAJOR OVERHAUL OF FUEL OIL CENTRIFUGE ALONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION (MAKE ALFA LAVAL, MODEL MAB 103B) AS PER ALFA LAVAL MANUAL TO BE CARRIED OUT. MATERIAL COST |
| 184 | UNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST | UNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST |
| 185 | UNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST | UNDERTAKE OVERHAULING OF SEAWAGE TREATMENT PLANT (STP) AND CONTROL PANEL TO BE CARRIED OUT AND SYSTEM TO PROVED ONBOARD CRAFT POST OVERHAULING. ROUTINES TO BE CARRIED OUT BY OEM. MAKE - HAMWORTHY, MODEL 9804140099. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST |
| 186 | 1000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST | 1000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. SERVICE COST |
| 187 | 1000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST | 1000 HRLY ROUTINES OF AIR COMPRESSORS, (MAKE ELGI ) AONG WITH MOTOR AND ASSOCIATED CONTROLS AND INSTRUMENTATION IN ACCORDANCE WITH ELGI RECIPROCATING AIR COMPRESSOR MANUAL TO BE CARRIED OUT. ALL DEFECTIVE COMPONENTS/SPARES IN AUXLIARY ASSOCIATED TO ENGINE TO BE REPAIRED/RENEWED AS NESSCARY TEST AND TRAILS TO BE UNDERTAKEN AND PROVED. MATERIAL COST |
| 188 | OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. SERVICE COST | OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. SERVICE COST |
| 189 | OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. MATERIAL COST | OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M154 T. MATERIAL COST |
| 190 | OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. SERVICE COST | OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. SERVICE COST |
| 191 | OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. MATERIAL COST | OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL. MAKE : MODY, MODEL M100 M. MATERIAL COST |
| 192 | OVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COST | OVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COST |
| 193 | OVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COST | OVERHAULING OF FUEL OIL TRANSFER PUMP ALONG WITH MOTOR AND STARTER, QYT 01 (MAKE: ROYSON ENGINEERING, CAPACITY: 1.5 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COST |
| 194 | OVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COST | OVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. SERVICE COST |
| 195 | OVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COST | OVERHAULING OF FRESH WATER PUMP ALONG WITH MOTOR AND STARTER NEED TO REPAIR AND NOT RUN IN AUTO MODE,(MAKE: BE, TYPE: AO3110 , CAPACITY: 3.75 M3/HR). PUMP TO BE PROVED ONBOARD FOR RATED OUTPUT POST FITMENT. MATERIAL COST |
| 196 | OVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). SERVICE COST | OVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). SERVICE COST |
| 197 | OVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). MATERIAL COST | OVERHAULING OF BILGE PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- BE TYPE- CH/CHR/CV CAP- 30 TPH). MATERIAL COST |
| 198 | OVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). SERVICE COST | OVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). SERVICE COST |
| 199 | OVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). MATERIAL COST | OVERHAULING OF GS PUMPS ALONG WITH MOTOR AND STARTER, TO BE CARRIED OUT (MAKE- STORCK TYPE- CH/CHR/CV CAP- 45 TPH). MATERIAL COST |
| 200 | RENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. SERVICE COST | RENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. SERVICE COST |
| 201 | RENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. MATERIAL COST | RENEWAL OF SUCTION / DISCHARGE / SYSTEM LINE PRESSURE GAUGES FOR VARIOUS EQUIPMENTS FITTED ONBOARD. MATERIAL COST |
| 202 | RENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. SERVICE COST | RENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. SERVICE COST |
| 203 | RENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. MATERIAL COST | RENEWAL OF ALL GAUGE LINES WITH END FITTINGS OF PRESSURE GAUGES AND CUT OUTS AS PER SAMPLE. MAT : CUNI. MATERIAL COST |
| 204 | ALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. SERVICE COST | ALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. SERVICE COST |
| 205 | ALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. MATERIAL COST | ALL SYSTEM VALVES TO BE REMOVED, OVERHAULED / REPAIRED, PRESSURE TESTED, REFITTED AND SYSTEM PROVED POST FITMENT. MATERIAL COST |
| 206 | CALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. SERVICE COST | CALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. SERVICE COST |
| 207 | CALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. MATERIAL COST | CALIBRATION/RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. MATERIAL COST |
| 208 | CLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. SERVICE COST | CLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. SERVICE COST |
| 209 | CLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. MATERIAL COST | CLEANING & PRESSURE TESTING OF EVAPORATOR COIL OF ATU SYSTEM AND ATU FILTER TO BE REPAIR/ RENENEW DEFECTIVE ITEM & CONDENSOR COIL. MAKE - KPCL. PROVE THE SYSTEM FOR OPTIMUM PERFORMANCE. MATERIAL COST |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender