Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Industrial Painting; Buyer - Brush Painting Including Hand Tool Cleaning (Surface Preparation) + Application Of One Coat Of Epoxy Pri
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Industrial Painting; Buyer - Brush Painting Including Hand Tool Cleaning (Surface Preparation) + Application Of One Coat Of Epoxy Primer (One Coat Of 80 Microns ) + Application Of Two Coat Of Epoxy Based Finish Paint (One Coat Of 35 Microns) ( Above 40 To 60 Meter Elevation In Plant) , Brush Painting Including Hand Tool Cleaning (Surface Preparation) + Application Of One Coat Of Epoxy Primer (One Coat Of 80 Microns ) + Application Of Two Coat Of Epoxy Based Finish Paint (One Coat Of 35 Microns ) ( Above 24 To 40 Meter Elevation In Plant) , Brush Painting Including Hand Tool Cleaning (Surface Preparation) + Application Of One Coat Of Epoxy Primer (One Coat Of 80 Microns ) + Application Of One Coat Of Epoxy Based Finish Paint (One Coat Of 35 Microns ) (0 Meter To 24 Meter Elevation In Plant) , Brush Painting Including Hand Tool Cleaning (Surface Preparation) + Application Of One Coat Of Cr Based Primer ( One Coat Of 35 Microns) + Two Coat Of Chlorinated Rubber Paint (One Coat Of 35 Microns ) ( 0 Meter To 24 Meter Elevation In Plant)) , Brush Painting Including Hand Tool Cleaning (Surface Preparation)+ Application Of One Coat Of Synthetic Enamel Based Primer ( One Coat Of 35 Microns) + Application Of Two Coats Of Synthetic Enamel Paint (One Coat Of 20 Microns) Hand Railing Painting ( 0 Meter To 56 Meter Elevation In Plant) , Brush Painting Including Hand Tool Cleaning (Surface Preparation) + Application Of Two Coats Of H.T. Al. Paint Of 250°C/ 400°C/ 600°C (One Coat Of 35 Micro.). Vessels, Main Cracker, Mini Cracker, Vent Stack, Steam Pipe Lines Etc. (0 Meter To 32 Meter Height In Plant) , Letter Writing Size 2 ( At Any Elevation Between 0 To 40 Meter In Plant) , Letter Writing Size 4 ( At Any Elevation Between 0 To 40 Meter In Plant) , Letter Writing Size 6 ( At Any Elevation Between 0 To 40 Meter In Plant) , Background Paint One Coat Epoxy Along With Border. ( At Any Elevation Between 0 To 40 Meter In Plant)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one Coat of Epoxy primer (one coat of 80 microns ) + Application of two Coat of Epoxy based finish paint (one coat of 35 microns) ( above 40 to 60 meter elevation in plant) | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one Coat of Epoxy primer (one coat of 80 microns ) + Application of two Coat of Epoxy based finish paint (one coat of 35 microns) ( above 40 to 60 meter elevation in plant) |
| 2 | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one Coat of Epoxy primer (one coat of 80 microns ) + Application of two Coat of Epoxy based finish paint (one coat of 35 microns ) ( above 24 to 40 meter elevation in plant) | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one Coat of Epoxy primer (one coat of 80 microns ) + Application of two Coat of Epoxy based finish paint (one coat of 35 microns ) ( above 24 to 40 meter elevation in plant) |
| 3 | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one Coat of Epoxy primer (one coat of 80 microns ) + Application of one Coat of Epoxy based finish paint (one coat of 35 microns ) (0 meter to 24 meter elevation in plant) | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one Coat of Epoxy primer (one coat of 80 microns ) + Application of one Coat of Epoxy based finish paint (one coat of 35 microns ) (0 meter to 24 meter elevation in plant) |
| 4 | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one coat of CR based primer ( one coat of 35 microns) + Two coat of Chlorinated Rubber paint (one coat of 35 microns ) ( 0 meter to 24 meter elevation in plant)) | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of one coat of CR based primer ( one coat of 35 microns) + Two coat of Chlorinated Rubber paint (one coat of 35 microns ) ( 0 meter to 24 meter elevation in plant)) |
| 5 | Brush Painting including Hand Tool Cleaning (Surface preparation)+ Application of one coat of synthetic enamel based primer ( one coat of 35 microns) + Application of Two coats of Synthetic Enamel paint (one coat of 20 microns) hand railing painting ( 0 meter to 56 meter elevation in plant) | Brush Painting including Hand Tool Cleaning (Surface preparation)+ Application of one coat of synthetic enamel based primer ( one coat of 35 microns) + Application of Two coats of Synthetic Enamel paint (one coat of 20 microns) hand railing painting ( 0 meter to 56 meter elevation in plant) |
| 6 | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of Two coats of H.T. Al. Paint of 250°C/ 400°C/ 600°C (one coat of 35 micro.). Vessels, Main Cracker, Mini cracker, vent stack, steam pipe lines etc. (0 meter to 32 meter height in plant) | Brush Painting including Hand Tool Cleaning (Surface preparation) + Application of Two coats of H.T. Al. Paint of 250°C/ 400°C/ 600°C (one coat of 35 micro.). Vessels, Main Cracker, Mini cracker, vent stack, steam pipe lines etc. (0 meter to 32 meter height in plant) |
| 7 | Letter writing size 2” ( At any elevation between 0 to 40 meter in plant) | Letter writing size 2” ( At any elevation between 0 to 40 meter in plant) |
| 8 | Letter writing size 4” ( At any elevation between 0 to 40 meter in plant) | Letter writing size 4” ( At any elevation between 0 to 40 meter in plant) |
| 9 | Letter writing size 6” ( At any elevation between 0 to 40 meter in plant) | Letter writing size 6” ( At any elevation between 0 to 40 meter in plant) |
| 10 | Background paint one coat Epoxy along with border. ( At any elevation between 0 to 40 meter in plant) | Background paint one coat Epoxy along with border. ( At any elevation between 0 to 40 meter in plant) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender