Defence Statutory Bodies & Commissions/Committees Closing in 6 days TDR #57346048

Tender For Construction Of Library Room, Toilet And Other Repair/Renovation Of Upper Primary School Gandapatrapali.

Issued by Statutory Bodies & Commissions/Committees · Balangir, Odisha
Tender Value
36.04 Lakhs
Estimated cost
Bid Submission
28 Sep 2026
6 days left
EMD
72100
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Balangir → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Library Room, Toilet And Other Repair/Renovation Of Upper Primary School Gandapatrapali.

BOQ

Name of Work:- Construction of library room, toilet and other repair/renovation of Upper Primary School Gandapatrapali.
Sl. No. Item Description
1Construction of library room, toilet and other repair/renovation of Upper Primary School Gandapatrapali.
2Site clearance with cutting of bushes benath and tree branches above the compressed air line ( out side unit area ) .
3M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
5Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
6M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
7Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
8Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
9M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
10Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
11Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
12M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
13Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
14Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
15M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
16Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
17Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
18M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
19Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
20Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
21M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
22Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
23Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
24M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
25Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
26Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
27M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
28Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
29Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
30M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
31Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
32Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
33M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
34Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
35Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
36M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
37Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
38Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
39M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
40Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
41Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
42M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
43Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
44Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
45M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
46Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
47Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
48M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
49Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
50Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
51M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
52Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
53Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
54M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
55Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
56Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
57M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
58Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
59Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
60M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
61Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
62Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
63M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
64Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
65Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
66M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
67Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
68Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
69M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
70Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
71Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
72M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
73Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
74Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
75M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
76Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
77Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
78M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
79Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
80Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
81M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
82Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
83Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
84M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
85Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
86Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
87M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
88Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
89Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
90M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
91Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
92Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
93M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
94Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
95Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
96M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
97Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
98Applying priming coat with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works and Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : two coats on old work .
99M & L for 15 mm cement plaster on concrete/brick work of mix : 1:4 (1 cement: 4 fine sand) sqm as per site requirment .
100Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) .
101M & L for welding in repairs exc 2.5cm but n exc 5cm in length ( For top angles, clamps, other stifners etc.of supports and pipe line where required. Thickness of metal to be welded not more than 6mm) . Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57346048
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 36.04 Lakhs
LAST DATE 28-09-2026
Authority
Authority Name Munitions India Limited
Work Description Tender for Construction Of Library Room, Toilet And Other Repair/Renovation Of Upper Primary School Gandapatrapali.
Basic Detail
Tender No 3012/OFBL/RD2618/TE-19-2026-27
Bidding Type Tender
Location
City Balangir
State Odisha
Key Dates
Publish Date 03 Sep 2026
Submission Date 28 Sep 2026
Open Date 01 Oct 2026
Finance
Tender Value 36.04 Lakhs
Tender Fee Ref. Documents
EMD 72100
Exemption Not Available
Document List
1-BiddersComplianceforTE-_1.xls
2-IMPORTANT-NOTE-CIVIL-WORKS.pdf
3-IndemnityBond.pdf
4-Remedial-Measure-of-Saf_2.pdf
6722d2a4-6c62-4557-899e-78f6469b89be.html
Basis-of-estimate.pdf
BOQ_338044.xls
Tendernotice_1 (9).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Oct 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
xls

1-BiddersComplianceforTE-_1.xls

pdf

2-IMPORTANT-NOTE-CIVIL-WORKS.pdf

pdf

3-IndemnityBond.pdf

pdf

4-Remedial-Measure-of-Saf_2.pdf

html

6722d2a4-6c62-4557-899e-78f6469b89be.html

pdf

Basis-of-estimate.pdf

xls

BOQ_338044.xls

pdf

Tendernotice_1 (9).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders