Tender For Tirunelveli Generation Circle - Maintenance Of The Head Works, Periyar Forebay Dam With Gallary, Suruliyar Power House, C S, Tailrace,Penstock ,Culverts,Roads,Penstock Steps ,Cleaning Of Open Channel Drain With Tank, Water Storage Tanks &
Tender Overview
Project Description
Tender for Tirunelveli Generation Circle - Maintenance Of The Head Works, Periyar Forebay Dam With Gallary, Suruliyar Power House, C S, Tailrace,Penstock ,Culverts,Roads,Penstock Steps ,Cleaning Of Open Channel Drain With Tank, Water Storage Tanks & Filter Media And All Official Buildings By Cleaning, Sweeping, Jungle Cleaning, Providing Uninterrupted Water Supply, Maintaining The Sanitation Arrangements Under Works Contract In Periyar Upper And Suruliyar Lower C S For A Period Of 12 Months From The Date Of Utilization For The Year 2026 - 2027.
BOQ
| Sl. No. | Item Description |
| 1 | Light Jungle clearing along with road both sides, Forebay dam Upstream, Downstream sides ,Penstock,Tailrace and clearing away from the site including cost of labour, T&P, head load, loading & unloading etc., |
| 2 | Periyar Upper Camp |
| 3 | Suruliyar Lower Camp |
| 4 | Sweeping and Cleaning inside & open spaces around the surrounding areas of office, Regulating gate,around rooms and shed in Forebay dam, Suruliyar power House and clear away the waistes / debris from the location including cost of broom sticks, baskets, safety appliances, labour charges, lead, lift etc., complete and it can be done in alternative woking days. |
| 5 | Periyar Upper Camp |
| 6 | Suruliyar Lower Camp |
| 7 | Cleaning the toilets in Head works Thekkady Office, Forebay dam and Valve house, Suruliyar Power House, Office buildings including cost of cleaning materials like brush, bleaching powder, phenoil,labour for cleaning, safety appliances, lead, lift, etc., complete it can be done in all woking days. |
| 8 | Periyar Upper Camp |
| 9 | Suruliyar Lower Camp |
| 10 | Cleaning of open house drains and clearing away the waistes / debris from the location including cost of cleaning materials, bleaching powder, labour charges,safety applicances, lead, lift, etc., complete and it can be done once in Fifteen days. |
| 11 | Suruliyar Lower Camp |
| 12 | Cleaning the Inspection chamber / manhole and clear away the solid wastes / debrises from the particular location including cost of cleaning materials, bleaching powder, phenoil, labour charges, lead, lift, etc., complete and it can be done once in four months. |
| 13 | Periyar Upper Camp |
| 14 | Suruliyar Lower Camp |
| 15 | Cleaning of sewer line including removing the block wherever required and clear away the debris from the location including cost of cleaning materials, bleaching powder, phenoil, labour, lead, lift, etc, complete and it can be done once in three months per year. |
| 16 | Periyar Upper Camp |
| 17 | Suruliyar Lower Camp |
| 18 | Attending Masonry works such as chipping, plastering, brick works and concreting works /carpentry works / plumbing works wherever essentially required and clear away the debris from the location including cost of labour, lead, lift, etc, complete but material wlll be supplied by the department. |
| 19 | Periyar Upper Camp |
| 20 | Attending Masonry works |
| 21 | Attending Plumbing works |
| 22 | Attending Carpentry works |
| 23 | Suruliyar Lower Camp |
| 24 | Attending Masonry works |
| 25 | Attending Plumbing works |
| 26 | Attending Carpentry works |
| 27 | Maintenance of Water supply arrangements to Camp,Offices,Police guard of Tamil Nadu & Kerala Police, Suruliyar Power House,Camp and Office buildings including cost of required materials, labour charges, Safety apliances,T&P etc., Complete and it can be done daily. |
| 28 | Periyar Upper Camp |
| 29 | Suruliyar Lower Camp |
| 30 | Cleaning of Open channel drain, Water tank, Filter tank and Storage tank including cost of bleaching powder, labour charges , safety appliances,lead, lift etc, complete and it can be done once in one month. |
| 31 | Periyar Upper Camp |
| 32 | Suruliyar Lower Camp |
| 33 | Thorough cleaning of cobweb and dirts on walls inside, outside and ceiling of Power House and other office building for Inside 60% of the total area and for Outside 25% of the total area and clear away the debris from the location including cost of broom sticks, baskets, labour charges, safety appliances,lead, lift etc., complete and it can be done once in four months. |
| 34 | Suruliyar Lower Camp |
| 35 | Cleaning the open drain in road sides and clearing the vegetative items in both sides of the drains as required and clearing away the deposited / dragged silt / debris from the location including cost of cleaning materials, labour, lead, lift, etc, complete and it can be done once in four months per year. |
| 36 | Periyar Upper Camp |
| 37 | Maintenance of Drinking Water Diversion bund and Main Water Tank removing the block due to debris, sand and wastes etc., for free and full flow of water including cost labour charges , safety applicances, lead, lift, etc, complete and it can be done once in one month. |
| 38 | Suruliyar Lower Camp |
| 39 | Clearing the Open Terraces of Power House, all Buildings and disposing away the debris from the location as directed including cost of broom sticks, baskets, labour, all lead, lift etc., complete and it can be done once in two months per year. |
| 40 | Periyar Upper Camp |
| 41 | Suruliyar Lower Camp |
| 42 | Maintenence of Dam by sweeping the top,cleaning the silt from the drain and floor of Inspection Gallery and clearing away the debris from the location as directed including cost of all labour charges , safety appliances, lead, lift, etc., complete once in three months per year. |
| 43 | Periyar Upper Camp |
| 44 | Cleaning the Culverts across the roads by removing the draagged deposited silt/ debris inside & disposing away from the location as directed including cost of hire charges for T&P, labour charges , all lead, lift, etc, complete once in three months (before and after monsoon Period) |
| 45 | Periyar Upper Camp |
| 46 | Cleaning of steps along penstock, surge tank and Dam Gallery by scrapping alage, removal of dragged silt / debris earth and clearing away weeds/vegetative growth for width of 50 cm wide on each side of steps including cost of labour charges ,Safety appliances, lead, lift etc.,complete and it can be done once in Six months per year. |
| 47 | Periyar Upper Camp |
| 48 | GST 18% as per Govt. Norms Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender