Science and Technology Boards / Undertakings / PSU Closing in 0 days TDR #57344955

Tender For General-Development Of Micro Watershed 2026-27-Gandhinagar-General Civil Work

Issued by Boards / Undertakings / PSU · Wayanad, Kerala
Tender Value
16.80 Lakhs
Estimated cost
Bid Submission
14 Sep 2026
0 days left
EMD
42009
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Wayanad → Kerala
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for General-Development Of Micro Watershed 2026-27-Gandhinagar-General Civil Work

BOQ

Name of Work:- GENERAL-DEVELOPMENT OF MICRO WATERSHED 2026-27-GANDHINAGAR-General Civil Work
Sl. No. Item Description
1ALT WORKS - Stone bund 1 m height -26 Rm sree shankara vidhya mandir school
22.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
3OD1849/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
45.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
55.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
65.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
7Stone bund 1 m height- 20 Rm A D Yashoda Edappetty
82.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
9OD1847/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
105.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
115.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
125.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
13Stone bund 1 m height - 19 Rm Rajalakshmi K P Vidhyanagar
142.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
15OD1850/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
165.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
175.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
185.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
19Stone bund 1 m height -20 Rm Unnikrishnan Ambadi
202.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
21OD1844/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
225.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
235.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
245.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
25Stone bund 1 m height -20 Rm Bhrahmadevan
262.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
27OD1851/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
285.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
295.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
305.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
31Stone bund 1 m height -20 Rm Vinod
322.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
33OD1842/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
345.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
355.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
365.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
37Stone bund 1 m height -25 Rm Rathnagaran Gandhinagar road
382.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
39OD1845/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
405.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
415.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
425.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
43DLT WORKS - Retaining wall 1.5 m height 100 Rm
442.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
45OD2115/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc..
465.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
475.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
485.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57344955
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 16.80 Lakhs
LAST DATE 14-09-2026
Authority
Authority Name Directorate Of Soil Survey And Soil Conservation
Work Description Tender for General-Development Of Micro Watershed 2026-27-Gandhinagar-General Civil Work
Basic Detail
Tender No SOIL/DSSSC/33/2026-2027
Bidding Type Tender
Location
City Wayanad
State Kerala
Key Dates
Publish Date 03 Sep 2026
Submission Date 14 Sep 2026
Open Date 16 Sep 2026
Finance
Tender Value 16.80 Lakhs
Tender Fee 2760
EMD 42009
Exemption Available
Document List
BOQ_1468543.xls
cd8b2984-ba97-4171-89c1-f1abc9902f92.html
GandhinagarBidDocument.pdf
Tendernotice_1 (14).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Sep 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1468543.xls

html

cd8b2984-ba97-4171-89c1-f1abc9902f92.html

pdf

GandhinagarBidDocument.pdf

pdf

Tendernotice_1 (14).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender