Tender For Reconstruction Of Certain Married Accomodation Under Ge (Af) Gurgaon No.1
Tender Overview
Project Description
Tender For Reconstruction Of Certain Married Accomodation Under Ge (Af) Gurgaon No.1
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Oct-2026 | Corrigendum02 | Date | 26-Oct-2026 |
| 2 | 28-Sep-2026 | Corrigendum01 | Date | 19-Oct-2026 |
| 3 | 23-Oct-2026 | Corrigendum04 | Date | 17-Nov-2026 |
| 4 | 16-Oct-2026 | Corrigendum03 | Date | 02-Nov-2026 |
| 5 | 09-Oct-2026 | Corrigendum02 | Date | 26-Oct-2026 |
| 6 | 16-Oct-2026 | Corrigendum03 | Date | 02-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Lumpsum price worked out by the contractor for \\"Srl Item No. 1 of Schedule 'A' Part -I DESIGN AND CONSTRUCTION 02 Nos OF MD ACCN BUILDING FOR 16 SMQ's, in EACH BLOCK) (G+4) INCLUDING STILT PARKING Sch ‘A’ part I on srl page No. 31 |
| 2 | Lumpsum price worked out by the contractor for “SITE CLEARANCE/ EARTHWORK” as listed in Sch '‘A” part II above/below the lumpsum price of Rs.15,82,370.49 as inserted by MES for Sch ‘A’ part II on srl page No.32 |
| 3 | Lumpsum price worked out by the contractor for “DEMOLITION OF B/R PORTION” as listed in Sch '‘A” part IIIA above/below the lumpsum price of Rs. 44,56,911.90 as inserted by MES for Sch ‘A’ part IIIA on srl page No.34 |
| 4 | Lumpsum price worked out by the contractor for “DEMOLITION OF E/M PORTION” as listed in Sch '‘A” part-III B above/below the lumpsum price of Rs. 2,69,184.58 as inserted by MES for Sch ‘A’ part IIIB on srl page No.35 |
| 5 | Lumpsum price worked out by the contractor for “INTERNAL WATER SUPPLY\\" as listed in Sch ‘A” part IV representing above/below the lumpsum price of Rs. 5,70,926.92 inserted by MES for Sch ‘A’ Part IV on srl page No.36 |
| 6 | Lumpsum price worked out by the contractor for “INTERNAL ELECTRIFICATION\\" as listed in Sch ‘A” part V representing above/below the lumpsum price of Rs. 36,82,754.47 inserted by MES for Sch ‘A’ Part V on srl page No.43 |
| 7 | Lumpsum price worked out by the contractor for “ROAD/ PATH/ CULVERT/ HARDSTANDING” as listed in Sch ‘A” part VI representing above / below the lumpsum price of Rs. 40,89,988.88 as inserted by MES for Sch ‘A’ Part VI on srl page No.44 |
| 8 | Lumpsum price worked out by the contractor for “SEWAGE DISPOSAL” as listed in Sch ‘A” part VII representing above / below the lumpsum price of Rs. 5,35,971.22 as inserted by MES for Sch ‘A’ Part VII on srl page No.46 |
| 9 | Lumpsum price worked out by the contractor for “AREA DRAINAGE” as listed in Sch ‘A” part VIII representing above / below the lumpsum price of Rs.10,67,385.26 as inserted by MES for Sch ‘A’ Part VIII on srl page No.47 |
| 10 | Lumpsum price worked out by the contractor for “EXTERNAL WATER SUPPLY” as listed in Sch ‘A” part IX representing above / below the lumpsum price of Rs.1,79,024.92 as inserted by MES for Sch ‘A’ Part VIII on srl page No.48 |
| 11 | Lumpsum price worked out by the contractor for “EXTERNAL ELECTRIFICATION” as listed in Sch ‘A” part X representing above / below the lumpsum price of Rs.11,10,413.52 as inserted by MES for Sch ‘A’ Part X on srl page No.50 |
| 12 | Lumpsum price worked out by the contractor for “LIFT” as listed in Sch ‘A” part XI representing above / below the lumpsum price of Rs.2,36,480.20 as inserted by MES for Sch ‘A’ Part XI on srl page No.51 |
| 13 | Lumpsum price worked out by the contractor for “FIRE FIGHTING” as listed in Sch ‘A” part XII representing above / below the lumpsum price of Rs.5,85,828.00 as inserted by MES for Sch ‘A’ Part XII on srl page No.53 |
| 14 | Lumpsum price worked out by the contractor for “LIGHTENING PROTECTION” as listed in Sch ‘A” part XIII representing above / below the lumpsum price of Rs.2,33,723.20 as inserted by MES for Sch ‘A’ Part XIII on srl page No.55 |
| 15 | Lumpsum price worked out by the contractor for “DG SET” as listed in Sch ‘A” part XIV representing above / below the lumpsum price of Rs.30,292.00 as inserted by MES for Sch ‘A’ Part XIV on srl page No.56 |
| 16 | SCH 'A' PART XV (MISC B/R & E/M ITEMS) Note:- Excavation and earthwork to the extent required for execution of relevant item under this schedule unless otherwise specified shall be measured and paid under relevant items of Sch 'A' Part-II. |
| 17 | (A) DEMOLITION (E/M) |
| 18 | Taking down sub main wiring of any size and description and removable the same from site and removing materials for taking credit complete all as specified and directed. |
| 19 | Taking down U/S GI earthing alongwith GI wire, GI pipe and allied accessories from the depth upto 2.50 mtr complete all as specified and directed. |
| 20 | Taking down MCCB/MCB of any type any capacity and any make from DB complete all as specified and directed. |
| 21 | Taking up or down cable XLPE insulated screened PVC bedded galvanized steel strap or wire armoured, electric power cable (heavy duty) 1100 volt grade with stranded aluminium conductor of size 25 sqmm, 3.5 core for taking credit complete all as specified and directed. |
| 22 | Taking down 15/20mmdia gate valve and deposit the same at MES store for reuse complete all as specified and directed. |
| 23 | (B) INTERNAL WATER SUPPLY |
| 24 | Supply and fix 15 mm bore (concealed) angle valve of cast copper alloy chromium plated fancy type screwed down high pressure with crutch or butterfly handle screwed both ends for CPVC pipe or for unions and fixed complete all as specified & directed. |
| 25 | Supply and fix two way bib taps, 15 mm size fancy type cast copper alloy chromium plated with crutch or butterfly handle, screwed down, for CPVC pipe or for brass ferrule and fixed complete all as specified & directed. |
| 26 | (C) INTERNAL ELECTRIFICATION |
| 27 | Supply and fix in repair LED batten suitable for indoor application 10 W, 2' length, wall mounted with polycarbonate housing, end cap made of ABS plastic of white colour finish and high efficiency translucence (HET) diffuser and integral electronic driver including two point surface mounting on wall/ ceiling and connecting up with twin core twisted flexible copper conductor cable of suitable size complete all as specified and as directed . |
| 28 | Supply and fixing LED Lamp 9 watt 220 volts AC of suitable size complete all as specified and as directed. |
| 29 | Supply and fix in repair LED Building Security light fitting 25 watt including GI light grade pipe 1.5 m long bend to 45 degree and of diameter 25 mm suitable to building security light power cord pipe diameter with necessary clamps of for fixing security light, all as specified and directed including making hole to wall if necessary complete all as specified and directed. |
| 30 | Supply and fixing for indoor Floor Mounted cubical LT Feeder Pillar Box, self supported, front & rear openable, double door, hinged type with locking arrangement & sloping top canopy, suitable ventilation on both side, with wire mesh, IP52 protection with Dust & Vermin proof etc made of 3.15 mm CRCA sheet duly powder coated, mounted/fixed on MS Angle 50x50x6 mm thick duly painted with black enamel synthetic paint over coat of red oxide zinc chrome primer, duly grouted in PCC 1:3:6 Type C1 using foundation, suitable size of MS Gland with gland plate, and aluminium lugs for all incoming and outgoing cables, TPN aluminium busbar of capacity 250 amps with pvc insulator heat shrink colour sleeves, mounted on procelin insulators complete volt and amp meter, selector switch with all accessories etc. complete all as directed including and accommodating with the following, (Bldg Meter Panel)(i) Aluminium bus bar 3 phase & neutral & earth of capacity 100 Amps (Incoming)(ii) MCCB 4 pole 100 amps 35 KA - 01 No |
| 31 | (D) EXTERNAL WATER SUPPLY |
| 32 | Supply and lay 100 mm dia ductile Iron pipe, S/S including specials, Class “K-7” complete all as specified and directed. |
| 33 | Material and Labour for cutting existing 150 mm steel tubing for alterations or additions necessarily done in position without taking down and inserting Tee of 150 x 150 x 100 mm for tapping all as specified and directed.(Tapping point shown and as directed) |
| 34 | Material and Labour for valve chamber of internal size 750x750x750mm comprising of 50mm thick PCC 1:5:10 type E2 foundation, 200mm thick brick wall in CM 1:6, 15mm thick plastering in CM 1:4 internally and externally up to 50mm below GL, 100mm thick PCC 1:3:6 type C1 as in copings, 3mm thick MS sheet cover with suitable hinges and locking arrangement, painting steel surfaces with two coats of synthetic enamel paint over a coat of primer including necessary earth work and excavation in any type of soil complete all as specified and as directed. |
| 35 | (E) EXTERNAL ELECTRIFICATION |
| 36 | Material & Labour for cement concrete in foundation, filling and mass concrete type B2 1:2:4 (40mm graded aggregate), not exceeding 15 CM in depth for plinth protection for path including dismantling of old surface complete all as specified and directed. |
| 37 | Material & Labour for DWC pipe of 63 mm dia for cable protection complete all as specified and as directed |
| 38 | Supply and fix LT Panel made out of CRCA sheet 3.15 mm thick outdoor Pedestal type CPRI approved, totally enclosed with front and rear opening, hinged doors with projected and raised platform of suitable size, weather and water proof with necessary locking arrangements along with lugs, cable glands of various sizes for cables, danger notice plate, stickering of Switch gear about termination of switch gear, and fire nuts/bolts etc used are to be made of rust proof material incl as per IS: 8623 tinned aluminium bus bar with insulators suitable for three phase and four wire, LT AC, 50 Hz 415 V 2000 A capacity complete with powder coating, necessary internal electric connection as required and provision of the following: (Main Panel) |
| 39 | Incoming:(a) MCCB 4 Pole, 415 V, 36 kA (ICS=ICU=ICW for 1 Sec), with magnetic release of capacity 750 Amps, with adjustable type overload protection, short circuit protection - 01 No Outgoing:(b) MCCB 4 Pole, 415 V, 25 kA (ICS=ICU=ICW for 1 Sec), with magnetic release of capacity 100 Amps, with adjustable type overload protection, short circuit protection - 03 Nos (for LTP-1, LTP-2 & DG PANEL)c) MCCB 4 Pole, 415 V, 16 kA (ICS=ICU=ICW for 1 Sec), with thermal release of capacity 63 Amps, with fixed type overload protection, short circuit protection - 01 No (SPARE) d) Intelligent Panel meter to measure voltage, current, frequency, power factor etc with all connected CTs of each breakers e) LED Indicating Lamps for each phase with colour code Red Yellow Blue for R, Y and B Phases for each breakers |
| 40 | Supply and fixing LT Panel made out of CRCA sheet 3.15 mm thick outdoor Pedestal type CPRI approved, totally enclosed with front and rear opening, hinged doors with projected an raised platform of suitable size, weather and water proof with necessary locking arrangements along with lugs, cable glands of various sizes for cables, danger notice plate, stickering of Switch gear about termination of switch gear, and the nuts/ bolts etc used are to be made of rust proof material incl as per IS: 8623 tinned aluminum bus bar with insulators suitable for three phase and four wire LT AC, 50 Hz 415 V 2000 A capacity complete with powder coating, necessary internal electric connection as required and provision of the following: (DG Panel) |
| 41 | Incoming:(a) MCCB 4 Pole, 415 V, 16 kA (ICS=ICU=ICW for 1 Sec), with magnetic release of capacity 100 Amps, with adjustable type overload protection, short circuit protection - 01 No Outgoing:(b) MCCB 4 Pole, 415 V, 16 kA (ICS=ICU=ICW for 1 Sec), with magnetic release of capacity 63 Amps, with adjustable type overload protection, short circuit protection - 02 Nos for (Lift Panel-1 & Lift Panel-2)(c) MCB SP 20 A, 230 V, 10 kA C CURVE-03 No (for streetlight , Staircase -1 & 2 + Street Light)(d) Astro timer switch-01 for street light(e) Intelligent Panel meter to measure voltage, current, frequency, power factor etc with all connected CTs of each breakers(f) LED Indicating Lamps for each phase with colour code Red Yellow Blue for R, Y and B Phases for each breakers |
| 42 | Supply and fix LT Panel made out of CRCA sheet 3.15 mm thick outdoor Pedestal type CPRI approved, totally enclosed with front and rear opening, hinged doors with projected an raised platform of suitable size weather and water proof with necessary locking arrangements along with lugs, cable glands of various sizes for cables, danger notice plate, stickering of Switch gear about termination of switch gear, and the nuts/bolts etc used are to be made of rust proof material incl as per IS: 8623 tinned aluminum bus bar with insulators suitable for three phase and four wire LT AC, 50 Hz 415 V 2000 A capacity complete with powder coating, necessary internal electric connection as required and provision of the following: (LIFT Panel-1 & 2) |
| 43 | Incoming:(a) MCCB 4 Pole, 415 V, 16 kA (ICS=ICU=ICW for 1 Sec), with magnetic release of capacity 63 Amps, with adjustable type overload protection, short circuit protection - 01 NoOutgoing:(b) MCCB 4 Pole, 415 V, 16 kA (ICS=ICU=ICW for 1 Sec), with magnetic release of capacity 40 Amps, with adjustable type overload protection, short circuit protection - 01 Nos for (Lift DB)(c) MCB TPN 32 A, 230 V, 10 kA C CURVE-03 No (for TERRACE PUMP)(d) DOL Starter 10 HP, 01 Nos(e) MCB SP 20 A, 230 V, 10 kA C CURVE-01 No (spare)(f) Astro timer switch-01 for street light(g) Intelligent Panel meter to measure voltage, current, frequency, power factor etc with all connected CTs of each breakers(h) LED Indicating Lamps for each phase with colour code Red Yellow Blue for R, Y and B Phases for each breakers |
| 44 | Supply and fix Sheet metal enclosure for 4way Distribution Boards (DB's), double door, Tripple pole & neutral with 100 amps rated bus bar, IP-20 protection suitable for fixing MCB's/Isolators complete all as specified and directed. (LIFT DB-1 & LIFT DB-2)IN COMERa) MCCB 40 Amp 4 pole 415 v 16 KAOUT GOINGb) Supply and Fixing RCBO 32 Amp 4 pole 30 mA suitable for 415 volts-01 Nos (for LIFT)c) Supply and Fixing MCB SP 16 Amp 50 Hz, suitable for 415 volts-01 Nos (M/C Room Light) |
| 45 | Supply and fix Loop in loop out box (minimum size 210mm x 155 mm x 92 mm) of FRP made with IP 65 protection of thermoplastic circuit breaker boxes with metric knockouts for cable entry and exit, Combi climate Cable Glands of IP 66/ IP 67 for cable entry with MCB 10 Amps, C Curve terminals as bus terminals for cable fixing arrangements and with cable glands, complete. all as specified and directed. |
| 46 | Material and labour for PVC insulated copper conductor of size 1.5 sqmm 3 core for each street light complete. all as specified and directed. Name of Work: RECONSTRUCTION OF CERTAIN MARRIED ACCOMMODATION UNDER GE (AF) GURGAON NO. 1 Contract No: CE(AF)/NGP/GUR/TEMP 10 OF 2026-2027 Name of the Bidder/ Bidding Firm / Company : SCHEDULE OF CREDITNOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, thesame shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount.2. The building/structure to be demolished under the contract shall be deemed handed over to the contractor on the same date when site for work under this contract is handed over.3. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.4. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible.5. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.6. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.7. The credit amount of this schedule will be carried over to General Summary hereinafter to arrive at the Lumpsum.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of Engineer-in-Charge without any extra cost to the Department only after adjustment of the amount of credit from his payment.9. The materials listed in this schedule shall be recorded in the measurement book and accordingly to be abstracted as per work done of the respective items of schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done. NOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, thesame shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount.2. The building/structure to be demolished under the contract shall be deemed handed over to the contractor on the same date when site for work under this contract is handed over.3. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.4. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible.5. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.6. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.7. The credit amount of this schedule will be carried over to General Summary hereinafter to arrive at the Lumpsum.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of Engineer-in-Charge without any extra cost to the Department only after adjustment of the amount of credit from his payment.9. The materials listed in this schedule shall be recorded in the measurement book and accordingly to be abstracted as per work done of the respective items of schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done. Sl No Description of material Unit Approx Nos of unit Assessed Rate in Rs. per unit Amount in Rs. Quoted by the contractor Rate per unit Amount in Rs |
| 47 | Material and labour for PVC insulated copper conductor of size 1.5 sqmm 3 core for each street light complete. all as specified and directed. Name of Work: RECONSTRUCTION OF CERTAIN MARRIED ACCOMMODATION UNDER GE (AF) GURGAON NO. 1 Contract No: CE(AF)/NGP/GUR/TEMP 10 OF 2026-2027 Name of the Bidder/ Bidding Firm / Company : SCHEDULE OF CREDITNOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, thesame shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount.2. The building/structure to be demolished under the contract shall be deemed handed over to the contractor on the same date when site for work under this contract is handed over.3. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.4. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible.5. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.6. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.7. The credit amount of this schedule will be carried over to General Summary hereinafter to arrive at the Lumpsum.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of Engineer-in-Charge without any extra cost to the Department only after adjustment of the amount of credit from his payment.9. The materials listed in this schedule shall be recorded in the measurement book and accordingly to be abstracted as per work done of the respective items of schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done. NOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, thesame shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount.2. The building/structure to be demolished under the contract shall be deemed handed over to the contractor on the same date when site for work under this contract is handed over.3. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.4. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible.5. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.6. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.7. The credit amount of this schedule will be carried over to General Summary hereinafter to arrive at the Lumpsum.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of Engineer-in-Charge without any extra cost to the Department only after adjustment of the amount of credit from his payment.9. The materials listed in this schedule shall be recorded in the measurement book and accordingly to be abstracted as per work done of the respective items of schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done. Sl No Description of material Unit Approx Nos of unit Assessed Rate in Rs. per unit Amount in Rs. Quoted by the contractor Rate per unit Amount in Rs |
| 48 | 2.0 SCHEDULE OF CREDIT (B/R) |
| 49 | Scrap iron, Separating, scraping and cleaning of reinforcement |
| 50 | Old brick works |
| 51 | Old Chowkhats or frames with shutters Steel/ wooden n exceeding 1.5 Sqm |
| 52 | Old Chowkhats or frames with shutters Steel/ wooden Exc 1.5 but n Exc 4.00 Sqm |
| 53 | Old U/S shutters Steel/ wooden Exc 1.0 but n Exc 2.00 Sqm |
| 54 | Old U/S GI tubing dia 15/ 20 mm bore |
| 55 | Old U/SPVC pipe |
| 56 | Old U/S water tank |
| 57 | Old U/S kitchen sink |
| 58 | Old U/S tap/ angle cock/ stop cock etc |
| 59 | Old U/S curtain rod with brackets |
| 60 | Old U/S flushing cistern |
| 61 | Old U/S AC sheet SCHEDULE OF CREDIT (E/M) |
| 62 | Old U/S point wiring alongwith switches, sockets, ceiling roses, fan regulator, lamp holders and alike. |
| 63 | Old U/S TPN DB any type, size and any condition |
| 64 | Old U/S MCB DB any type, size and any condition |
| 65 | Old U/S Sheet metal closure of A/C of any type, size and any condition |
| 66 | Old U/S Sub main wiring. |
| 67 | Old U/S tube light/ bldg light fittings |
| 68 | Old U/S MCB/MCCB any size, type and capacity |
| 69 | Old U/S earthing material |
| 70 | Old U/S XLPE cable, of size 25 sqmm 3.5 core. |
| 71 | Old U/S GI tubing 20 mm bore. |
| 72 | Old U/S GI tubing 40 mm bore. |
| 73 | Old U/S gate valve 15/20 mm bore. Total amount as applicable with respect to Note No. 1 shall be carried over to General Summary. 665535.5 0.0 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 20 daysCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 27 daysTender Documents