(I) Drainage system rectification measures at RUB No. 130 & 132 with CCTV, W.L. indicator, road signages board & speed breaker between GWH-DEIA section. (II) Drainage system rectification measures at RUB No. 140 & 144 with CCTV, W.L. Indicator, road
Tender Overview
Project Description
Tender for (I) Drainage System Rectification Measures At Rub No. 130 & 132 With Cctv, W.L. Indicator, Road Signages Board & Speed Breaker Between Gwh-Deia Section. (Ii) Drainage System Rectification Measures At Rub No. 140 & 144 With Cctv, W.L. Indicator, Road Signages Board & Speed Breaker Between Gwh-Diea Section. (Iii) Drainage System Rectification Measures At Rub No. 153 & 156 With Cctv, W.L. Indicator, Road Signages Board & Speed Breaker Between Gwh-Deia Section & (Iv) Drainage System Rectification Measures At Rub No. 163 & 166 With Cctv, W.L. Indicator, Road Signages Board & Speed Breaker Between Gwh-Deia Section.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender