Bids Are invited for Custom Bid For Services - Spraying Of Water Through Mobile Water Tanker On Siding No-03 And 04 Of Bhubaneswari Ocp Bhubaneswari Area For A Period Of 730 Days - Spraying Of Water On Coal Transportation Road For Suppression Of Dust
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Spraying Of Water Through Mobile Water Tanker On Siding No-03 And 04 Of Bhubaneswari Ocp Bhubaneswari Area For A Period Of 730 Days - Spraying Of Water On Coal Transportation Road For Suppression Of Dust By Mobile Tanker Having Spraying Arrangement, Loading Of Water Into Tankers By Departmental Arrangement With All Lead And Lift Including The Hire Charges Of Water Tanker, Cost Of Diesel, Mobile, Repair And Maintenance And Wages Of Driver And Helper Etc. All Complete (The Details/Specification Of The Work Enclosed). , Owning And Operation Cost For Installation Of Vehicle Tracking Machine In Trucks/ Tanker/Tractor For Route Length Tracking Including Rest Hour For Movement Analysis And Positioning With Submission Of Report Etc. Complete As Per Instruction Of Eic.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Spraying of water on Coal Transportation Road for suppression of dust by mobile tanker having spraying arrangement, loading of water into tankers by departmental arrangement with all lead and lift including the hire charges of water tanker, cost of diesel, mobile, repair and maintenance and wages of driver and helper etc. all complete (The details/specification of the work enclosed). | Spraying of water on Coal Transportation Road for suppression of dust by mobile tanker having spraying arrangement, loading of water into tankers by departmental arrangement with all lead and lift including the hire charges of water tanker, cost of diesel, mobile, repair and maintenance and wages of driver and helper etc. all complete (The details/specification of the work enclosed). |
| 2 | Owning and operation cost for installation of vehicle tracking machine in Trucks/ Tanker/Tractor for route length tracking including rest hour for movement analysis and positioning with submission of report etc. complete as per instruction of EIC. | Owning and operation cost for installation of vehicle tracking machine in Trucks/ Tanker/Tractor for route length tracking including rest hour for movement analysis and positioning with submission of report etc. complete as per instruction of EIC. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender