Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships At Naval Dockyard, Mumbai; Repair Rate Contract For Three Years For Degutting And Regutting Of Pipes, Valves, Coolers, Atus And Hes
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships At Naval Dockyard, Mumbai; Repair Rate Contract For Three Years For Degutting And Regutting Of Pipes, Valves, Coolers, Atus And Hes Fitted Onboard In Sh.. - Deguting Of System Pipes Of Dia Up To 125Mmthe Scope Of Work Will Cover The Following:-(I) Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Pipes As Per Layout Drawing.(Iii)Degutting/Removal Of Pipes From System Through Means Of Gas Cutting/Mechanical Cutting/Grinding, Removal Of Fasteners, Electrical Connections, Cl S, Lagging Etc(Iv)Blanking Of Pipe Ends With Plastic/ Wooden Caps. (V)Transporting From Degutting Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing , Degutting Of System Pipes Of Dia Up To 126Mm To 250Mm. The Scope Of Work Will Cover The Following:-(I)Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Pipes As Per Lay Out Drawing.(Iii)Degutting/Removal Of Pipes From System Through Means Of Gas Cutting/Mechanical Cutting/Grinding, Removal Of Fasteners, Electrical Connections, Cl S And Lagging Etc.(Iv)Blanking Of Pipe Ends With Plastic/ Wooden Caps.(V)Transporting From Degutted Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing. , Degutting Of System Pipes Of Dia Up To 251Mm To 350Mm. The Scope Of Work Will Cover The Following:-(I)Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Pipes As Per Lay Out Drawing.(Iii)Degutting/Removal Of Pipes From System Through Means Of Gas Cutting/Mechanical Cutting/Grinding, Removal Of Fasteners, Electrical Connections, Cl S And Lagging Etc.(Iv)Blanking Of Pipe Ends With Plastic/ Wooden Caps.(V)Transporting From Degutted Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing , Regutting Of System Pipes Of Dia Up To 125Mmthe Scope Of Work Will Cover The Following:-(I)Taking Over/ Transportation Of Repaired Pipes From Concerned Work Centre To Regutted Location/ As Indicated By Work Centre-In-Charge.(Ii)Removal Of Plastic/ Wooden End Caps.(Iii)Regutting/ Installation Of Pipes As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ Lagging To Be Provided By The Firm(Iv)Work Done Of Regutting Of Pipes Certified By User Department On Log Book. , Regutting Of System Pipes Of Dia Up To 126Mm To 250Mm.The Scope Of Work Will Cover The Following:-(I)Taking Over/ Transportation Of Repaired Pipes From Concerned Work Centre To Regutted Location/ As Indicated By Work Centre-In-Charge.(Ii)Removal Of Plastic/ Wooden End Caps.(Iii)Regutting/ Installation Of Pipes As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ Lagging To Be Provided By The Firm(Iv)Work Done Of Regutting Of Pipes Certified By User Department On Log Book , Regutting Of System Pipes Of Dia Up To 251Mm To 350Mm. The Scope Of Work Will Cover The Following:-(I)Taking Over/ Transportation Of Repaired Pipes From Concerned Work Centre To Regutted Location/ As Indicated By Work Centre-In-Charge.(Ii)Removal Of Plastic/ Wooden End Caps.(Iii)Regutting/ Installation Of Pipes As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ Lagging To Be Provided By The Firm(Iv)Work Done Of Regutting Of Pipes Certified By User Department On Log Book , Degguting Of System Valve/ Reducer Of Dia Up To 125Mm. The Scope Of Work Will Cover The Following:-(I)Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Valve/ Reducer As Per Lay Out Drawing.(Iii)Degutting/Removal Of Valve/ Reducer From System Through Means Of Gas Cutting/Mechanical Cutting/Grinding, Removal Of Fasteners, Electrical Connections, Cl S And Lagging Etc.(Iv)Blanking Of Valve/ Reducer Ends With Plastic/ Wooden Caps.(V)Transporting From Degutted Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing. , Degguting Of System Valves Of Dia Up To 126Mm To 250Mm. The Scope Of Work Will Cover The Following:-(I)Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Valves As Per Lay Out Drawing.(Iii)Degutting/Removal Of Valves From System Through Means Of Gas Cutting/Mechanical Cutting/Grinding, Removal Of Fasteners, Electrical Connections, Cl S And Lagging Etc.(Iv)Blanking Of Valve/ Reducer Ends With Plastic/ Wooden Caps.(V)Transporting From Degutted Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing. , Degguting Of System Valve/ Reducer Of Dia Up To 251Mm To 350Mm. The Scope Of Work Will Cover The Following:-(I)Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Valve/ Reducer As Per Lay Out Drawing.(Iii)Degutting/Removal Of Valve/ Reducer From System Through Means Of Gas Cutting/Mechanical Cutting/Grinding, Removal Of Fasteners, Electrical Connections, Cl S And Lagging Etc.(Iv)Blanking Of Valve/ Reducer Ends With Plastic/ Wooden Caps.(V)Transporting From Degutted Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing. , Regutting Of System Valve/Reducer Of Dia From 125Mm. The Scope Of Work Will Cover The Following:--(I) Taking Over/ Transportation Of Repaired/ Overhauled Valve/ Reducer As Concerned Work Centre To Regutted Location/ As Indicated By Work Centre-In-Charge.(Ii) Removal Of Plastic/ Wooden End Caps.(Iii) Regutting/ Installation Of Valve Reducer As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ To Be Provided By The Firm(Iv) Work Done Of Regutting Of Valve/ Reducers Certified By User Department On Log Book. , Regutting Of System Valves Of Dia Up To 126Mm To 250Mm. The Scope Of Work Will Cover The Following:-(I) Taking Over/ Transportation Of Repaired/ Overhauled Valve/ Reducer As Concerned Work Centre To Regutted Location/ As Indicated By Work Centre-In-Charge.(Ii) Removal Of Plastic/ Wooden End Caps.(Iii) Regutting/ Installation Of Valve Reducer As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ To Be Provided By The Firm(Iv) Work Done Of Regutting Of Valve/ Reducers Certified By User Department On Log Book. , Regutting Of System Valve/Reducer Of Dia From 251Mm To 350Mm.The Scope Of Work Will Cover The Following:-(I) Taking Over/ Transportation Of Repaired/ Overhauled Valve/ Reducer As Concerned Work Centre To Regutted Location/ As Indicated By Work Centre-In-Charge.(Ii) Removal Of Plastic/ Wooden End Caps.(Iii) Regutting/ Installation Of Valve Reducer As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ To Be Provided By The Firm(Iv) Work Done Of Regutting Of Valve/ Reducers Certified By User Department On Log Book , Degutting Of System Coolers/Atus/Hesthe Scope Of Work Will Cover The Following:-(I)Preparation Of System Layout Drawing.(Ii)Marking And Tallying Of System Coolers/Atus/Hes As Per Lay Out Drawing.(Iii)Degutting/Removal Of Coolers/Atus/Hes From System Through Means Of Gas Cutting/Mechanical Cutting/ Grinding, Removal Of Fasteners, Electrical Connections, And Cl S Etc. Delagging, Disconnection Of Flanges, Hot Work, Tallying Of Coolers, Removal, And Transportation To The Work Centre.(Iv)Blanking Of Coolers/Atus/Hes Ends With Plastic/ Wooden Caps.(V)Removal And Transporting From Degutted Location To System Dept. Shop Floor Using Own Arrangement.(Vi)Handing Over To Concerned Work Centre And Getting Work Certified By The Concerned Work Centre-In-Charge On Log Book Along With Location Drawing. , Regutting Of System Coolers/Atus/Hesthe Scope Of Work Will Cover The Following:-(I) Taking Over/ Transportation Of Coolers/Atus/Hes From Concerned Work Centre To Regutting Location As Indicated By Work Centre-In-Charge.(Ii) Removal Of Plastic/ Wooden End Caps.(Iii) Lagging Of System As Per Requirement (Iv) Regutting/ Installation Of Coolers/Atus/Hes As Per System Layout Through Means Of Tightening With Fasteners, Washers, Gasket And Lagging If Required. All Consumable Material For Regutting/ Installation/ To Be Provided By The Firm. Refitting Of Hes/Atus/ Coolers Requisite Trunkings/ Piping And Prove The System For No Leakages.(Iv) Work Done Of Regutting Of Coolers/Atus/Hes Certified By User Department On Log Book.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Deguting of system pipes of dia up to 125mmThe scope of work will cover the following:-(i) Preparation of system layout drawing.(ii) Marking and tallying of system pipes as per layout drawing.(iii) Degutting/removal of pipes from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps, lagging etc(iv) Blanking of pipe ends with plastic/ wooden caps. (v) Transporting from degutting location to System Dept. shop floor using own arrangement.(vi) Handing over to concerned work centre and getting work certified by the concerned work centre-in-Charge on log book along with location drawing | Deguting of system pipes of dia up to 125mmThe scope of work will cover the following:-(i) Preparation of system layout drawing.(ii) Marking and tallying of system pipes as per layout drawing.(iii) Degutting/removal of pipes from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps, lagging etc(iv) Blanking of pipe ends with plastic/ wooden caps. (v) Transporting from degutting location to System Dept. shop floor using own arrangement.(vi) Handing over to concerned work centre and getting work certified by the concerned work centre-in-Charge on log book along with location drawing |
| 2 | Degutting of system pipes of dia up to 126mm to 250mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system pipes as per lay out drawing.(iii)Degutting/removal of pipes from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of pipe ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-Charge on log book along with location drawing. | Degutting of system pipes of dia up to 126mm to 250mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system pipes as per lay out drawing.(iii)Degutting/removal of pipes from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of pipe ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-Charge on log book along with location drawing. |
| 3 | Degutting of system pipes of dia up to 251mm to 350mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system pipes as per lay out drawing.(iii)Degutting/removal of pipes from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of pipe ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing | Degutting of system pipes of dia up to 251mm to 350mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system pipes as per lay out drawing.(iii)Degutting/removal of pipes from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of pipe ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing |
| 4 | Regutting of system pipes of dia up to 125mmThe scope of work will cover the following:-(i)Taking over/ transportation of repaired pipes from concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii)Removal of plastic/ wooden end caps.(iii)Regutting/ installation of pipes as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ lagging to be provided by the firm(iv)Work done of regutting of pipes certified by user department on log book. | Regutting of system pipes of dia up to 125mmThe scope of work will cover the following:-(i)Taking over/ transportation of repaired pipes from concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii)Removal of plastic/ wooden end caps.(iii)Regutting/ installation of pipes as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ lagging to be provided by the firm(iv)Work done of regutting of pipes certified by user department on log book. |
| 5 | Regutting of system pipes of dia up to 126mm to 250mm.The scope of work will cover the following:-(i)Taking over/ transportation of repaired pipes from concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii)Removal of plastic/ wooden end caps.(iii)Regutting/ installation of pipes as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ lagging to be provided by the firm(iv)Work done of regutting of pipes certified by user department on log book | Regutting of system pipes of dia up to 126mm to 250mm.The scope of work will cover the following:-(i)Taking over/ transportation of repaired pipes from concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii)Removal of plastic/ wooden end caps.(iii)Regutting/ installation of pipes as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ lagging to be provided by the firm(iv)Work done of regutting of pipes certified by user department on log book |
| 6 | Regutting of system pipes of dia up to 251mm to 350mm. The scope of work will cover the following:-(i)Taking over/ transportation of repaired pipes from concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii)Removal of plastic/ wooden end caps.(iii)Regutting/ installation of pipes as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ lagging to be provided by the firm(iv)Work done of regutting of pipes certified by user department on log book | Regutting of system pipes of dia up to 251mm to 350mm. The scope of work will cover the following:-(i)Taking over/ transportation of repaired pipes from concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii)Removal of plastic/ wooden end caps.(iii)Regutting/ installation of pipes as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ lagging to be provided by the firm(iv)Work done of regutting of pipes certified by user department on log book |
| 7 | Degguting of system valve/ reducer of dia up to 125mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system valve/ reducer as per lay out drawing.(iii)Degutting/removal of valve/ reducer from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of valve/ reducer ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. | Degguting of system valve/ reducer of dia up to 125mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system valve/ reducer as per lay out drawing.(iii)Degutting/removal of valve/ reducer from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of valve/ reducer ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. |
| 8 | Degguting of system valves of dia up to 126mm to 250mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system valves as per lay out drawing.(iii)Degutting/removal of valves from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of valve/ reducer ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. | Degguting of system valves of dia up to 126mm to 250mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system valves as per lay out drawing.(iii)Degutting/removal of valves from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of valve/ reducer ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. |
| 9 | Degguting of system valve/ reducer of dia up to 251mm to 350mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system valve/ reducer as per lay out drawing.(iii)Degutting/removal of valve/ reducer from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of valve/ reducer ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. | Degguting of system valve/ reducer of dia up to 251mm to 350mm. The scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system valve/ reducer as per lay out drawing.(iii)Degutting/removal of valve/ reducer from system through means of gas cutting/mechanical cutting/grinding, removal of fasteners, electrical connections, clamps and lagging etc.(iv)Blanking of valve/ reducer ends with plastic/ wooden caps.(v)Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. |
| 10 | Regutting of system valve/reducer of dia from 125mm. The scope of work will cover the following:--(i) Taking over/ transportation of repaired/ overhauled valve/ reducer as concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Regutting/ installation of valve reducer as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm(iv) Work done of regutting of valve/ reducers certified by user department on log book. | Regutting of system valve/reducer of dia from 125mm. The scope of work will cover the following:--(i) Taking over/ transportation of repaired/ overhauled valve/ reducer as concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Regutting/ installation of valve reducer as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm(iv) Work done of regutting of valve/ reducers certified by user department on log book. |
| 11 | Regutting of system valves of dia up to 126mm to 250mm. The scope of work will cover the following:-(i) Taking over/ transportation of repaired/ overhauled valve/ reducer as concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Regutting/ installation of valve reducer as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm(iv) Work done of regutting of valve/ reducers certified by user department on log book. | Regutting of system valves of dia up to 126mm to 250mm. The scope of work will cover the following:-(i) Taking over/ transportation of repaired/ overhauled valve/ reducer as concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Regutting/ installation of valve reducer as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm(iv) Work done of regutting of valve/ reducers certified by user department on log book. |
| 12 | Regutting of system valve/reducer of dia from 251mm to 350mm.The scope of work will cover the following:-(i) Taking over/ transportation of repaired/ overhauled valve/ reducer as concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Regutting/ installation of valve reducer as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm(iv) Work done of regutting of valve/ reducers certified by user department on log book | Regutting of system valve/reducer of dia from 251mm to 350mm.The scope of work will cover the following:-(i) Taking over/ transportation of repaired/ overhauled valve/ reducer as concerned work centre to regutted location/ as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Regutting/ installation of valve reducer as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm(iv) Work done of regutting of valve/ reducers certified by user department on log book |
| 13 | Degutting of system coolers/ATUs/HEsThe scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system coolers/ATUs/HEs as per lay out drawing.(iii)Degutting/removal of coolers/ATUs/HEs from system through means of gas cutting/mechanical cutting/ grinding, removal of fasteners, electrical connections, and clamps etc. delagging, disconnection of flanges, hot work, tallying of coolers, removal, and transportation to the work centre.(iv)Blanking of coolers/ATUs/HEs ends with plastic/ wooden caps.(v)Removal and Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. | Degutting of system coolers/ATUs/HEsThe scope of work will cover the following:-(i)Preparation of system layout drawing.(ii)Marking and tallying of system coolers/ATUs/HEs as per lay out drawing.(iii)Degutting/removal of coolers/ATUs/HEs from system through means of gas cutting/mechanical cutting/ grinding, removal of fasteners, electrical connections, and clamps etc. delagging, disconnection of flanges, hot work, tallying of coolers, removal, and transportation to the work centre.(iv)Blanking of coolers/ATUs/HEs ends with plastic/ wooden caps.(v)Removal and Transporting from degutted location to System Dept. shop floor using own arrangement.(vi)Handing over to concerned work centre and getting work certified by the concerned work centre-in-charge on log book along with location drawing. |
| 14 | Regutting of system coolers/ATUs/HEsThe scope of work will cover the following:-(i) Taking over/ transportation of coolers/ATUs/HEs from concerned work centre to regutting location as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Lagging of system as per requirement (iv) Regutting/ installation of coolers/ATUs/HEs as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm. Refitting of HEs/ATUs/ Coolers requisite trunkings/ piping and prove the system for no leakages.(iv) Work done of regutting of coolers/ATUs/HEs certified by user department on log book. | Regutting of system coolers/ATUs/HEsThe scope of work will cover the following:-(i) Taking over/ transportation of coolers/ATUs/HEs from concerned work centre to regutting location as indicated by work centre-in-Charge.(ii) Removal of plastic/ wooden end caps.(iii) Lagging of system as per requirement (iv) Regutting/ installation of coolers/ATUs/HEs as per system layout through means of tightening with fasteners, washers, gasket and lagging if required. All consumable material for regutting/ installation/ to be provided by the firm. Refitting of HEs/ATUs/ Coolers requisite trunkings/ piping and prove the system for no leakages.(iv) Work done of regutting of coolers/ATUs/HEs certified by user department on log book. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender