Tender For Tender For Providing 100 Kva Sub Station A/W Ht Line And 3 Phase Lt Line At Balh Uesd Mcleodganj.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Sep 2026
0 days left
EMD
6305
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kangra → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Tender For Providing 100 Kva Sub Station A/W Ht Line And 3 Phase Lt Line At Balh Uesd Mcleodganj.
BOQ
| Sl. No. | Item Description |
| 1 | 100 kVA Substation |
| 2 | S/T Pole 9 Mtr Long (Prov by HPSEBL) |
| 3 | RCC Muff with Concrete filling |
| 4 | X-Arm [Channel Iron (100*50*5mm), Length 2800 mm *2 Nos] for Incomer line. |
| 5 | MS Angle Iron X-Arm for LA (2800*50*50*6 mm) |
| 6 | X-Arm [Channel Iron (75*40*6mm), Length 2800 mm *4 Nos] for supporting DO Fuse Unit & GO Switch |
| 7 | X-Arm Channel Iron 100*50*6 mm Length 2800*2 Nos for Transformer bed |
| 8 | X-Arm Channel Iron 100*50*6 mm Length 460 mm*2 Nos |
| 9 | MS Angle Iron X-Arm 50*50*6 mm Length 2800mm*2 Nos |
| 10 | MS Angle Iron X-Arm 50*50*6 mm Length 460mm*2 Nos |
| 11 | MS Angle Iron X-Arm 50*50*6 mm Length 950mm*2 Nos |
| 12 | MS Angle Iron X-Arm 50*50*6 mm Length 2800mm*2 Nos |
| 13 | X-Arm Channel Iron 50*50*6 mm Length 460mm*1 Nos |
| 14 | GO Switch Handle Supporting Length 460 mm |
| 15 | G.O Switch Unit (11Kv, 400A, 25KA) tripple pole O/D type |
| 16 | D.O Fuse Unit |
| 17 | Surge Arrester, 9 kV Station Class (Porcelain Type)Porecelain |
| 18 | Stay Set Complete |
| 19 | Stay Wire 7/3.15 mm (8.0 Kg Per Stay Set) |
| 20 | Pipe Earthing Set |
| 21 | Half clamp (M.S Flat 50*6 mm) |
| 22 | Full clamp (M.S Flat 50*6 mm) |
| 23 | M.S Nuts and Bolts (Off Sizes) |
| 24 | Aluminium Thimbles |
| 25 | Aluminium Thimbles |
| 26 | Danger Plate |
| 27 | Barbed Wire |
| 28 | 11 kV Disc insulator set |
| 29 | LT swiched capacitor for 100kVA Dtr ( prov by HPSEBL) |
| 30 | Chain Link Fencing |
| 31 | LT CT Meter for 63 kVA DTR ( prov by HPSEBL) |
| 32 | AAAC 7/3.15 for Earthing ( prov by HPSEBL) |
| 33 | LT Panel MCCB 200 A , Kit kat 200 Amp |
| 34 | Erection and Dismantling charges in all respect |
| 35 | HT line |
| 36 | Prov. ST Pole 9 mtr long (Prov by HPSEBL) |
| 37 | Prov. AAAC 50/55 sqmm (Prov by HPSEBL) |
| 38 | Prov. Muff (with Concrete filling) |
| 39 | AI knee bracing set 2(750x50x50)mm for single pole str |
| 40 | CI FG X-arm 1270x100x50mm for single pole |
| 41 | Prov. Pin Insulator with pin |
| 42 | Prov. Disc Insulator set complete |
| 43 | Prov. HT stay set |
| 44 | Prov. Stay wire 7/8 |
| 45 | Prov Danger Plate 203x200x1.6 mm |
| 46 | Prov. GI wire for earthing 8 No. |
| 47 | Prov Nut Bolt off size |
| 48 | Prov Barbed wire |
| 49 | Prov AL Paint |
| 50 | Eye hook for earth wire |
| 51 | Earth reel |
| 52 | Pole top Bracket 100x50x6mm- 100mm |
| 53 | Half Clamp |
| 54 | Full Clamp |
| 55 | Erection of Conductor 7/3.15mm sq |
| 56 | Erection Charges of GI wire |
| 57 | Erection of Pole 9 mtr long |
| 58 | Erection of HT Stay set |
| 59 | Pipe Earthing set for HT Line |
| 60 | Erection of Earthing set |
| 61 | LT Line |
| 62 | Providing ST Pole 08 Mtr. Long (prov by HPSEBL) |
| 63 | Providing RCC Muff concerete filling |
| 64 | AI 50x506mm Length-460mmx3 |
| 65 | Providing ACSR 6/1/3.35 SQMM or 7/3.15mm (prov by HPSEBL) |
| 66 | Providing Shackle insulator (16 KN) |
| 67 | Providing D-Iron (U-Clamp) |
| 68 | Providing LT Stay Set |
| 69 | Providing Stay wire (7/3.15 mm) |
| 70 | Providing Nuts & Bolts of various size |
| 71 | Providing Aluminium Paint |
| 72 | Providing Red Oxide |
| 73 | LT earthing set |
| 74 | Providing G.I Wire 8 No. SWG |
| 75 | Providing Egg Insulator (LT) |
| 76 | Providing Eye Hook |
| 77 | Erection of 08 Mtr. ST Pole complete in all respect. |
| 78 | Erection of LT Earthing Set complete in all respect. |
| 79 | Erection of LT Stay Set complete in all respect. |
| 80 | Erection of AAAC 7/3.15 sq.mm mix complete in all respect. |
| 81 | Erection of G.I Wire complete in all respect. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodaySep 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender