Tender For Breakdown & Major Repair/Replacement Work Of Mansarover Ghat Sps And Trilochan Ghat Sps At Varanasi.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Sep 2026
1 days left
EMD
85100
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Varanasi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Breakdown & Major Repair/Replacement Work Of Mansarover Ghat Sps And Trilochan Ghat Sps At Varanasi.
BOQ
| Sl. No. | Item Description |
| 1 | Breakdown & major repair/replacement work of Mansarover Ghat SPS and Trilochan Ghat SPS at Varanasi. |
| 2 | Breakdown & major repair/replacement work of Mansarover Ghat SPS, at Varanasi. |
| 3 | Repairing of Pump No. 1,2 3, 4 & 5 works |
| 4 | Carting of Pump No. 1, 2, 3, 4 & 5 from Mansarovar Ghat SPS to workshop with loading and unloading complete. |
| 5 | Repairing of Pump No. 1, 3 & 5 (2600 LPM 21 mtr. head)Kirloskar Make |
| 6 | Dismantling of pump and cleaning of all parts etc. complete. |
| 7 | Metalizing turning and polishing of pump shaft. |
| 8 | Supply and fitting of S.S. gland sleeve as per old sample. |
| 9 | Supply and fitting of bearing No-6411 reputed make- 2Nos. |
| 10 | Supply and fitting of oil seal 78x50x12, 30x55x12. |
| 11 | Supply of Rubber bush L-225-2Nos. |
| 12 | Repairing of Pump No. 2 & 4 (1300 lpm, 15 meter head) |
| 13 | Dismantling of pump and cleaning of all parts etc. complete. |
| 14 | Supply and fitting of gland sleeve of SS as per old sample. |
| 15 | Metalizing, turning and polishing of pump shaft. |
| 16 | S/F of Impeller neck ring of Gun metal. |
| 17 | Supply and fitting of housing neck ring of CI. |
| 18 | S/F of bearing No. 6309 and 6310. |
| 19 | S/F of oil seal No. 60x45x10 and 60x40x10 |
| 20 | Assembling of pump all parts including filling of gland dori, packing, nut-bolt, stud nut, greasing etc complete. |
| 21 | Carting of pump from workshop to Mansarovar Ghat SPS with loading, unloading, stacking at site. |
| 22 | Assembling of pump including cost of required Mobil oil and packing etc. |
| 23 | Lowering of Pumps in Pump well and installed on foundation. lowering of motor and making electric connection & setting of Pump-Motor alignment including all labour charges T&P etc. complete. work with all respect. |
| 24 | Repairing of 25 HP CGL make Motor No. 1,3 & 5 |
| 25 | Dismantling of 25 HP CGL make motor from pump well at Mansarover Ghat SPS, lifting upto the surface and stacking at suitable place in pump house. |
| 26 | Shifting of motor from pump house to road side loading on trolley, carting from Mansarover Ghat SPS to workshop and unloading at workshop. |
| 27 | Dismantling of all parts of motor at workshop, cutting and snatching of burnt copper wire, cleaning of slots, rewinding of motor with suitable size of supper enamel copper wire varnishing, heating and drying after rewinding of motor with all material labour and T&P. |
| 28 | Supply and fitting of new bearing size 6212 and 6312- 2 set SKF/FAG make. |
| 29 | S/F of terminal plate etc. complete. |
| 30 | Assembling of all parts of motor at workshop. |
| 31 | Carting of 25 HP motor from workshop to Mansarover Ghat SPS unloading and shifting of motor at site. |
| 32 | Lowering of motor in pump well at Mansarover Ghat SPS, fitting properly on pump, making electrical connection and testing of motor etc. complete with all respect. |
| 33 | Repairing of 10 HP Motor No. 2 & 4 |
| 34 | Dismantling of 10 HP motor from Pump foundation and shifting upto floor and loading on hand trolley and carting upto workshop unloading etc. complete. |
| 35 | Opening of motor at workshop and snatching of burnt stator winding and cleaning properly. Rewinding of motor starter by varnished , heating, varnishing etc. complete. |
| 36 | S/F of all bearing size 6409 and 6309 etc. complete reputed make. |
| 37 | S/F of terminal plate etc. complete. |
| 38 | After repairing assembling of all parts at workshop. |
| 39 | Carting of 10 HP motor from workshop to Mansarover Ghat SPS unloading and shifting of motor at site. |
| 40 | Lowering of motor pump well, making electric connection, testing on load at site. |
| 41 | Servicing & repairing of 70 KVA DG Set Kirloskar make Engine- |
| 42 | Cleaning of silencer of 70 KVA DG set with removal of old asbestos rope. |
| 43 | Supply & fitting of asbestos rope on silencer. |
| 44 | Finishing of covered silencer by coating soap stone powder with supply of material & labour charges etc. |
| 45 | Draining out of HSD oil from service tank and lube oil form engine sump and cleaning it properly. |
| 46 | Filling of new mobil oil, in engine sump of required level, Supply and fitting of Diesel filter, mobil filter required ring, packing etc. complete. |
| 47 | Fitment of fuel line including fuel pipe, banjo, copper washer etc. |
| 48 | Supply and fitting of air filter. |
| 49 | Cleaning of Radiator, pressure testing including fitment of hose clips, filling of coolant. |
| 50 | Cleaning of all parts & testing of engine on load at site with all labour T&P etc. complete. |
| 51 | Painting work- |
| 52 | 1. Motors 10 HP- 2 Nos. & 25 HP - 3Nos.2. Pumps 1300 LPM- 2 Nos. & 2600 LPM-3Nos.3. Jumbo dewatering set – 1No.4. Change over – 1No.5. Starter panels – 5Nos., APFC Panel- 1No., LT Panel- 1No. & PLC Panel- 1No.6. All supporting structure of panels.7. Complete header line S.V/N.R.V. and all fitting in Pump well.8. Railing, Stair/ Platform in pump well, campus railing and sump well complete.9. 70 KVA DG set with alternator oil tank etc. complete.10. Screen fitted on ground level.11. Dewatering control panel.12. Air Blower set- 2Nos.13. MS meter box and safety box.14. Canopy of 70 KVA DG set-1No |
| 53 | Painting of all above by two coat enamel paint with Smoke grey/ green, black etc.enamel paint as required with all materials, labours and T&P compete required for completion of works. |
| 54 | Making name plate ( Radium stickers) of all equipment and fitting properly at site. |
| 55 | SITC of Electric resistance sheet 10mm thikness size 1mtr.x 2mtr. for LT, PLC Panel, HT Panel, change over, DG set, APFC panel, APRU panel etc. complete. |
| 56 | SITC of flood light - 200 watt-5 No. in Pump well, sump well & special sump well. |
| 57 | SITC of flood light - 100 watt-6 No. in Pump well, sump well & special sump well, control panel, LT Panel, DG Room. Campus |
| 58 | SITC of flood light - 50 watt-3 No. in LT Panel, DG Room. HT Panel room, TF yard etc. |
| 59 | SITC of LED Bulb with cover injector - 9 watt-12 No. in Bridge with bathroom, etc. |
| 60 | SITC of LED Jhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete. |
| 61 | Repairing/Replecment of 12 volt self for 70 KVA DG set- 1No. |
| 62 | SITC of sign board (8x2 feet) including all material, labour charges etc. complete. |
| 63 | Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.(9 months) |
| 64 | Repairing/replacment of Invertor for PLC & DG set Including all cost of material and labour charge etc. complete. |
| 65 | Miscellaneous work (like as Supply of broom-12, cloth-10 kg, damaged parts, harpic, Acid, Dettol shop, mustard oil diesel carting- charge, electric fault, with Greasing, Gland dori of pump, campus and Transformer side grass cutting (9 months) etc. on periodic basis as per requirement. |
| 66 | Comprehensive maintenance, Repairing of 25 HP Star delta starter- 3No. 10 HP ATS starter- 2No. and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. - 9 months |
| 67 | Comprehensive maintenance of APFC Panel- 30 KVAR with its calibration certificate including all cost of material and labour charges T&P. 9 months |
| 68 | Comprehensive maintenance of LT Panel (main SFU-250 Amp. 1 Nos., SFU-150 Amp. 2 Nos.,- 100 Amp.- 5 Nos., and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, including all cost of material and labour charges. 1 Year |
| 69 | Repairing/Replacement of existing IP Cameras along with its 12 Month recharge. etc. complete Subjected to verification of EIC. |
| 70 | Repairing of suction sluice valve/Reflex valves with pipe fitting 200/250/300/350 mm - 4Nos. of chockages from NRV, Pumps and dewatering, (9 month) whenever necessary as per requirement and direction of EIC. |
| 71 | Repairing of bypass gate actuator, gear box and filling of fresh grease with Comprehensive maintenance of by pass gate including all cost of material, labour charge etc. complete. |
| 72 | Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete. |
| 73 | Calebriation of flow meter 300mm dia (Burahan make) with totalizer in PLC biases including all cost of material, labour charges etc. complete. |
| 74 | Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment- Pumping Plant. of GI Strips as per side condition. |
| 75 | Refiling of ABC type/CO2 fire extinguisher- 6 Nos. direction of EIC at Trilochan Ghat SPS, Varanasi |
| 76 | Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Pump & motor, DG set etc. complete a( one year) as per requirement and direction of EIC. |
| 77 | Breakdown & major repair/ replacement work of Trilochan Ghat SPS, at Varanasi. |
| 78 | Repairing of Pump no. 1,2,3 & 4 at Trilochan Ghat SPS, Varanasi. |
| 79 | Pump No.1 40 HP 2600 lpm, 25 metre head |
| 80 | Carting of pump from Trilochan ghat SPS to workshop including shifting of pump on the road and loading hand trolly etc. complete. |
| 81 | Dismantling of pump and cleaning of all parts etc. complete. |
| 82 | Supply and fitting of bearing 6309-2Nos. SKF/FAG make including all cost of material and labour charges, T&P. |
| 83 | Supply and fitting of oil seal size (72x42x10)mm and (62x45x10)mm etc. complete including all cost of material labour charges T&P. |
| 84 | Supply and fitting of 12mm nut bolt including all cost of material and labour charges, T&P. |
| 85 | Supply and fitting of gland sleeve as per old sample etc. complete. |
| 86 | Supply and fitting of rubber bush-226L. |
| 87 | Pump No. 2, 3 & 4, 5300 lpm, 26 mtr. head |
| 88 | Carting of pump from Trilochan ghat SPS to workshop including shifting of pump on the road and loading hand trolley etc. complete. |
| 89 | Dismantling of pump and cleaning of all parts etc. complete. |
| 90 | Supply and fitting of bearing 6411-2Nos. SKF/FAG make |
| 91 | Supply and fitting of oil seal size (60x80x12)mm and (65x85x12)mm -2Nos. |
| 92 | Supply and fitting of gland sleeve as per old sample etc. complete. |
| 93 | Supply and fitting of 16mm nut bolt-10 Nos. etc. complete. |
| 94 | Supply and fitting rubber bush size 225L-1No. |
| 95 | After repairing of pump assembling of all and carting back to site from workshop etc. complete including loading, unloading and shifting. |
| 96 | Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. |
| 97 | Repairing of pump No. 4 body and welding etc. including all material labour charges etc. complete. |
| 98 | Repairing of Pump shoft by metalizing truning, polishing including all material labour charge etc. complete. |
| 99 | Repairing of water protector of gland plate. |
| 100 | Repairing of Pump housing by retheading and fitting of new gland 12mm including all material, labour charges etc. complete. |
| 101 | Repairing of sluice valve, spindle (SS) rod, stemnut, flapper ring GM, gland dori etc. valve No. 2 & 4. |
| 102 | Servicing of 200 KVA DG Set KOEL make- |
| 103 | Draining out of HSD oil from service tank and lube oil from engine sump and cleaning it properly. |
| 104 | Replacement of Diesel filter & lube filter and fitting of both new filter required ring, packing etc. complete |
| 105 | Replacement of fuel water separator filter. |
| 106 | Replacement of air filters (outer & inner both) |
| 107 | Supply and filling (top up 40 ltr.) of coolant including all cost of material, labour charges etc. complete. |
| 108 | Complete fitting of accessories including cleaning & testing of engine on load at site with all labour T&P etc. complete. |
| 109 | Painting at Trilochan Ghat SPS |
| 110 | Rubbing, Scrubing and cleaning of following equipments at Trilochan Ghat SPS at Pumping station with all materials labours and T&P complete for preparing the surface to painting works including safety devices to prevent accident. 1. Motors 40 HP- 1 No. &75 HP - 3Nos.2. Pumps 2600 LPM- No. & 5300 LPM-3Nos.3. dewatering set – 1No.4. Change over – 1No.5. Starter panels – 4Nos., APFC Panel- 1No., LT Panel- 1No. & PLC Panel- 1No.6. All supporting structure of panels. 7. Complete header line S.V/N.R.V. and all fitting in Pump well.8. Railing, Stair/ Platform in pump well, campus railing, Pump and sump well complete.9. 200 KVA DG set with alternator oil tank etc. complete.10. Screen fitted on ground level.11. Dewatering control panel.12. Air Blower set- 2Nos. 13. MS meter box and safety box.14. Canopy of 200 KVA DG set-1No.15. Screen fitted on ground level. |
| 111 | Painting of all above by spray machine with Smoke grey/ black enamel paint as required with all materials, labours and T&P compete required for completion of works. |
| 112 | Making Name Plate (Radium stickers) of all equipment few Danger plate symbol & fire etc and fitting properly at site. |
| 113 | Repairing of 40 HP Motor at Trilochan Ghat SPS, Varanasi. |
| 114 | Opening of motor 40 HP and taking out damaged bearing supply and fitting of new bearing size 6212 set SKF/FAG make. |
| 115 | Supply and fitting of washer 36 Nos. spring type in 40 HP. |
| 116 | Supply and fitting of nut-bolt 1”- 20 Nos., ½” – 20 Nos. 40 HP etc. complete. |
| 117 | Supply and fitting of Terminal plat – 1No. in 40 HP motor. |
| 118 | Supply and fitting of lugs aluminum in motor as per old size or sample. |
| 119 | Cutting and snatching of burnt copper wire from 40 HP motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges. |
| 120 | Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. |
| 121 | Repairing of 75 HP Motor at Trilochan Ghat SPS, Varanasi. |
| 122 | Opening of motor 75 HP and taking out damaged bearing supply and fitting of new bearing size 6312-1set SKF/FAG make. |
| 123 | Supply and fitting of washer 36 Nos. spring type in 75 HP. |
| 124 | Supply and fitting of nut-bolt 1”- 20 Nos., ½” – 20 Nos. 75 HP etc. complete. |
| 125 | Supply and fitting of Terminal plat – 1No. in 75 HP motor. |
| 126 | Supply and fitting of lugs aluminum in all motor as per old size or sample. |
| 127 | Cutting and snatching of burnt copper wire from 75 HP motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges. |
| 128 | Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. |
| 129 | Repairing/SITC of ladder, mesh, MS Rod size - 12mm x 175 mtr. C channel size 100mm x 5mm x 50mm gudder size 100mm x 15mm x 15mtr. MS angle in Pump well- 18mtr. deep, & pump well - 18mtr. Deep and MS plateform size (2.6 x 3 feet)- 3Nos. as per old structure and dismantling of old Mesh gadder, ladder etc. including all cost of material labour charges etc. complete. |
| 130 | SITC of LED Bulb with cover injector - 9 watt-12 No. in Bridge with bathroom, etc. |
| 131 | SITC of LED Jhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete. |
| 132 | Repairing/Replacement of 12 volt self for 200 KVA DG set- 1No. |
| 133 | SITC of Electric resistance sheet 10mm thickness size 1mtr.x 2mtr. for LT, PLC Panel, HT Panel, change over, DG set, APFC panel, APRU panel etc. complete. |
| 134 | Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete. |
| 135 | Miscellaneous work (like as Supply of broom-12, cloth-10 kg, damaged parts, harpic, Acid, Dettol shop, mustard oil diesel carting- charge, electric fault, with Greasing, Gland dori of pump campus and Transformer side grass cutting (9 months) etc. on periodic basis as per requirement. |
| 136 | Comprehensive maintenance, Repairing of 75 HP Star delta starter, 60 HP ATS starter and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. -9 months |
| 137 | SITC of 100 watt LED bulb including all material, labour charge etc. complete.. |
| 138 | SITC of 50 watt LED bulb including all material, labour charge etc. complete.. |
| 139 | Comprehensive maintenance of APFC Panel- 200 KVAR with its calibration certificate Including all cost of material and labour charges T&P.( 9 months) |
| 140 | Comprehensive maintenance of LT Panel (main SFU-250 Amp. 1 Nos., SFU-150 Amp. 2 Nos.,- 100 Amp.- 5 Nos., and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, Including all cost of material and labour charges. ( 9 months) |
| 141 | Repairing/Replacement of existing IP Cameras along with its 12 Month recharge. etc. complete Subjected to verification of EIC. |
| 142 | Comprehensive maintenance, Repairing of suction sluice valve/Reflex vlaves with pipe fitting 200/250/300/350 mm - 4Nos. of chock ages from NRV, Pumps and dewatering, (9 months) whenever necessary as per requirement and direction of EIC. |
| 143 | Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.( 1Year) |
| 144 | Repairing of bypass gate actuator, gear box and filling of fresh grease with Comprehensive maintenance of by pass gate including all cost of material, labour charge etc. complete. |
| 145 | Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment- Pumping Plant. of GI Strips as per side condition. ( 9 months) |
| 146 | Refiling of ABC type/CO2 fire extinguisher - 6 Nos. direction of EIC at Trilochan Ghat SPS, Varanasi |
| 147 | Calibration of flow meter 400mm dia (Burahan make) with totalizer in PLC baises including all cost of material, labour charges etc. complete. |
| 148 | Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Pump & motor, DG set etc complete (9 months) as per requirement and direction of EIC. |
| 149 | SITC of water tank with PVC pipe wiring etc. including all material, labour charge etc. complete. |
| 150 | SITC of sign board ( 8x2 feet) including all material, labour charge etc. complete. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 daySep 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender