Tender For Breakdown & Major Repair/Replacement Work Of Mansarover Ghat Sps And Trilochan Ghat Sps At Varanasi.

Issued by Government Departments · Varanasi, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Sep 2026
1 days left
EMD
85100
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Varanasi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Breakdown & Major Repair/Replacement Work Of Mansarover Ghat Sps And Trilochan Ghat Sps At Varanasi.

BOQ

Name of Work:- Breakdown & major repair/replacement work of Mansarover Ghat SPS and Trilochan Ghat SPS at Varanasi.
Sl. No. Item Description
1Breakdown & major repair/replacement work of Mansarover Ghat SPS and Trilochan Ghat SPS at Varanasi.
2Breakdown & major repair/replacement work of Mansarover Ghat SPS, at Varanasi.
3Repairing of Pump No. 1,2 3, 4 & 5 works
4Carting of Pump No. 1, 2, 3, 4 & 5 from Mansarovar Ghat SPS to workshop with loading and unloading complete.
5Repairing of Pump No. 1, 3 & 5 (2600 LPM 21 mtr. head)Kirloskar Make
6Dismantling of pump and cleaning of all parts etc. complete.
7Metalizing turning and polishing of pump shaft.
8Supply and fitting of S.S. gland sleeve as per old sample.
9Supply and fitting of bearing No-6411 reputed make- 2Nos.
10Supply and fitting of oil seal 78x50x12, 30x55x12.
11Supply of Rubber bush L-225-2Nos.
12Repairing of Pump No. 2 & 4 (1300 lpm, 15 meter head)
13Dismantling of pump and cleaning of all parts etc. complete.
14Supply and fitting of gland sleeve of SS as per old sample.
15Metalizing, turning and polishing of pump shaft.
16S/F of Impeller neck ring of Gun metal.
17Supply and fitting of housing neck ring of CI.
18S/F of bearing No. 6309 and 6310.
19S/F of oil seal No. 60x45x10 and 60x40x10
20Assembling of pump all parts including filling of gland dori, packing, nut-bolt, stud nut, greasing etc complete.
21Carting of pump from workshop to Mansarovar Ghat SPS with loading, unloading, stacking at site.
22Assembling of pump including cost of required Mobil oil and packing etc.
23Lowering of Pumps in Pump well and installed on foundation. lowering of motor and making electric connection & setting of Pump-Motor alignment including all labour charges T&P etc. complete. work with all respect.
24Repairing of 25 HP CGL make Motor No. 1,3 & 5
25Dismantling of 25 HP CGL make motor from pump well at Mansarover Ghat SPS, lifting upto the surface and stacking at suitable place in pump house.
26Shifting of motor from pump house to road side loading on trolley, carting from Mansarover Ghat SPS to workshop and unloading at workshop.
27Dismantling of all parts of motor at workshop, cutting and snatching of burnt copper wire, cleaning of slots, rewinding of motor with suitable size of supper enamel copper wire varnishing, heating and drying after rewinding of motor with all material labour and T&P.
28Supply and fitting of new bearing size 6212 and 6312- 2 set SKF/FAG make.
29S/F of terminal plate etc. complete.
30Assembling of all parts of motor at workshop.
31Carting of 25 HP motor from workshop to Mansarover Ghat SPS unloading and shifting of motor at site.
32Lowering of motor in pump well at Mansarover Ghat SPS, fitting properly on pump, making electrical connection and testing of motor etc. complete with all respect.
33Repairing of 10 HP Motor No. 2 & 4
34Dismantling of 10 HP motor from Pump foundation and shifting upto floor and loading on hand trolley and carting upto workshop unloading etc. complete.
35Opening of motor at workshop and snatching of burnt stator winding and cleaning properly. Rewinding of motor starter by varnished , heating, varnishing etc. complete.
36S/F of all bearing size 6409 and 6309 etc. complete reputed make.
37S/F of terminal plate etc. complete.
38After repairing assembling of all parts at workshop.
39Carting of 10 HP motor from workshop to Mansarover Ghat SPS unloading and shifting of motor at site.
40Lowering of motor pump well, making electric connection, testing on load at site.
41Servicing & repairing of 70 KVA DG Set Kirloskar make Engine-
42Cleaning of silencer of 70 KVA DG set with removal of old asbestos rope.
43Supply & fitting of asbestos rope on silencer.
44Finishing of covered silencer by coating soap stone powder with supply of material & labour charges etc.
45Draining out of HSD oil from service tank and lube oil form engine sump and cleaning it properly.
46Filling of new mobil oil, in engine sump of required level, Supply and fitting of Diesel filter, mobil filter required ring, packing etc. complete.
47Fitment of fuel line including fuel pipe, banjo, copper washer etc.
48Supply and fitting of air filter.
49Cleaning of Radiator, pressure testing including fitment of hose clips, filling of coolant.
50Cleaning of all parts & testing of engine on load at site with all labour T&P etc. complete.
51Painting work-
521. Motors 10 HP- 2 Nos. & 25 HP - 3Nos.2. Pumps 1300 LPM- 2 Nos. & 2600 LPM-3Nos.3. Jumbo dewatering set – 1No.4. Change over – 1No.5. Starter panels – 5Nos., APFC Panel- 1No., LT Panel- 1No. & PLC Panel- 1No.6. All supporting structure of panels.7. Complete header line S.V/N.R.V. and all fitting in Pump well.8. Railing, Stair/ Platform in pump well, campus railing and sump well complete.9. 70 KVA DG set with alternator oil tank etc. complete.10. Screen fitted on ground level.11. Dewatering control panel.12. Air Blower set- 2Nos.13. MS meter box and safety box.14. Canopy of 70 KVA DG set-1No
53Painting of all above by two coat enamel paint with Smoke grey/ green, black etc.enamel paint as required with all materials, labours and T&P compete required for completion of works.
54Making name plate ( Radium stickers) of all equipment and fitting properly at site.
55SITC of Electric resistance sheet 10mm thikness size 1mtr.x 2mtr. for LT, PLC Panel, HT Panel, change over, DG set, APFC panel, APRU panel etc. complete.
56SITC of flood light - 200 watt-5 No. in Pump well, sump well & special sump well.
57SITC of flood light - 100 watt-6 No. in Pump well, sump well & special sump well, control panel, LT Panel, DG Room. Campus
58SITC of flood light - 50 watt-3 No. in LT Panel, DG Room. HT Panel room, TF yard etc.
59SITC of LED Bulb with cover injector - 9 watt-12 No. in Bridge with bathroom, etc.
60SITC of LED Jhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete.
61Repairing/Replecment of 12 volt self for 70 KVA DG set- 1No.
62SITC of sign board (8x2 feet) including all material, labour charges etc. complete.
63Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.(9 months)
64Repairing/replacment of Invertor for PLC & DG set Including all cost of material and labour charge etc. complete.
65Miscellaneous work (like as Supply of broom-12, cloth-10 kg, damaged parts, harpic, Acid, Dettol shop, mustard oil diesel carting- charge, electric fault, with Greasing, Gland dori of pump, campus and Transformer side grass cutting (9 months) etc. on periodic basis as per requirement.
66Comprehensive maintenance, Repairing of 25 HP Star delta starter- 3No. 10 HP ATS starter- 2No. and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. - 9 months
67Comprehensive maintenance of APFC Panel- 30 KVAR with its calibration certificate including all cost of material and labour charges T&P. 9 months
68Comprehensive maintenance of LT Panel (main SFU-250 Amp. 1 Nos., SFU-150 Amp. 2 Nos.,- 100 Amp.- 5 Nos., and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, including all cost of material and labour charges. 1 Year
69Repairing/Replacement of existing IP Cameras along with its 12 Month recharge. etc. complete Subjected to verification of EIC.
70Repairing of suction sluice valve/Reflex valves with pipe fitting 200/250/300/350 mm - 4Nos. of chockages from NRV, Pumps and dewatering, (9 month) whenever necessary as per requirement and direction of EIC.
71Repairing of bypass gate actuator, gear box and filling of fresh grease with Comprehensive maintenance of by pass gate including all cost of material, labour charge etc. complete.
72Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete.
73Calebriation of flow meter 300mm dia (Burahan make) with totalizer in PLC biases including all cost of material, labour charges etc. complete.
74Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment- Pumping Plant. of GI Strips as per side condition.
75Refiling of ABC type/CO2 fire extinguisher- 6 Nos. direction of EIC at Trilochan Ghat SPS, Varanasi
76Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Pump & motor, DG set etc. complete a( one year) as per requirement and direction of EIC.
77Breakdown & major repair/ replacement work of Trilochan Ghat SPS, at Varanasi.
78Repairing of Pump no. 1,2,3 & 4 at Trilochan Ghat SPS, Varanasi.
79Pump No.1 40 HP 2600 lpm, 25 metre head
80Carting of pump from Trilochan ghat SPS to workshop including shifting of pump on the road and loading hand trolly etc. complete.
81Dismantling of pump and cleaning of all parts etc. complete.
82Supply and fitting of bearing 6309-2Nos. SKF/FAG make including all cost of material and labour charges, T&P.
83Supply and fitting of oil seal size (72x42x10)mm and (62x45x10)mm etc. complete including all cost of material labour charges T&P.
84Supply and fitting of 12mm nut bolt including all cost of material and labour charges, T&P.
85Supply and fitting of gland sleeve as per old sample etc. complete.
86Supply and fitting of rubber bush-226L.
87Pump No. 2, 3 & 4, 5300 lpm, 26 mtr. head
88Carting of pump from Trilochan ghat SPS to workshop including shifting of pump on the road and loading hand trolley etc. complete.
89Dismantling of pump and cleaning of all parts etc. complete.
90Supply and fitting of bearing 6411-2Nos. SKF/FAG make
91Supply and fitting of oil seal size (60x80x12)mm and (65x85x12)mm -2Nos.
92Supply and fitting of gland sleeve as per old sample etc. complete.
93Supply and fitting of 16mm nut bolt-10 Nos. etc. complete.
94Supply and fitting rubber bush size 225L-1No.
95After repairing of pump assembling of all and carting back to site from workshop etc. complete including loading, unloading and shifting.
96Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC.
97Repairing of pump No. 4 body and welding etc. including all material labour charges etc. complete.
98Repairing of Pump shoft by metalizing truning, polishing including all material labour charge etc. complete.
99Repairing of water protector of gland plate.
100Repairing of Pump housing by retheading and fitting of new gland 12mm including all material, labour charges etc. complete.
101Repairing of sluice valve, spindle (SS) rod, stemnut, flapper ring GM, gland dori etc. valve No. 2 & 4.
102Servicing of 200 KVA DG Set KOEL make-
103Draining out of HSD oil from service tank and lube oil from engine sump and cleaning it properly.
104Replacement of Diesel filter & lube filter and fitting of both new filter required ring, packing etc. complete
105Replacement of fuel water separator filter.
106Replacement of air filters (outer & inner both)
107Supply and filling (top up 40 ltr.) of coolant including all cost of material, labour charges etc. complete.
108Complete fitting of accessories including cleaning & testing of engine on load at site with all labour T&P etc. complete.
109Painting at Trilochan Ghat SPS
110Rubbing, Scrubing and cleaning of following equipments at Trilochan Ghat SPS at Pumping station with all materials labours and T&P complete for preparing the surface to painting works including safety devices to prevent accident. 1. Motors 40 HP- 1 No. &75 HP - 3Nos.2. Pumps 2600 LPM- No. & 5300 LPM-3Nos.3. dewatering set – 1No.4. Change over – 1No.5. Starter panels – 4Nos., APFC Panel- 1No., LT Panel- 1No. & PLC Panel- 1No.6. All supporting structure of panels. 7. Complete header line S.V/N.R.V. and all fitting in Pump well.8. Railing, Stair/ Platform in pump well, campus railing, Pump and sump well complete.9. 200 KVA DG set with alternator oil tank etc. complete.10. Screen fitted on ground level.11. Dewatering control panel.12. Air Blower set- 2Nos. 13. MS meter box and safety box.14. Canopy of 200 KVA DG set-1No.15. Screen fitted on ground level.
111Painting of all above by spray machine with Smoke grey/ black enamel paint as required with all materials, labours and T&P compete required for completion of works.
112Making Name Plate (Radium stickers) of all equipment few Danger plate symbol & fire etc and fitting properly at site.
113Repairing of 40 HP Motor at Trilochan Ghat SPS, Varanasi.
114Opening of motor 40 HP and taking out damaged bearing supply and fitting of new bearing size 6212 set SKF/FAG make.
115Supply and fitting of washer 36 Nos. spring type in 40 HP.
116Supply and fitting of nut-bolt 1”- 20 Nos., ½” – 20 Nos. 40 HP etc. complete.
117Supply and fitting of Terminal plat – 1No. in 40 HP motor.
118Supply and fitting of lugs aluminum in motor as per old size or sample.
119Cutting and snatching of burnt copper wire from 40 HP motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges.
120Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC.
121Repairing of 75 HP Motor at Trilochan Ghat SPS, Varanasi.
122Opening of motor 75 HP and taking out damaged bearing supply and fitting of new bearing size 6312-1set SKF/FAG make.
123Supply and fitting of washer 36 Nos. spring type in 75 HP.
124Supply and fitting of nut-bolt 1”- 20 Nos., ½” – 20 Nos. 75 HP etc. complete.
125Supply and fitting of Terminal plat – 1No. in 75 HP motor.
126Supply and fitting of lugs aluminum in all motor as per old size or sample.
127Cutting and snatching of burnt copper wire from 75 HP motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges.
128Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC.
129Repairing/SITC of ladder, mesh, MS Rod size - 12mm x 175 mtr. C channel size 100mm x 5mm x 50mm gudder size 100mm x 15mm x 15mtr. MS angle in Pump well- 18mtr. deep, & pump well - 18mtr. Deep and MS plateform size (2.6 x 3 feet)- 3Nos. as per old structure and dismantling of old Mesh gadder, ladder etc. including all cost of material labour charges etc. complete.
130SITC of LED Bulb with cover injector - 9 watt-12 No. in Bridge with bathroom, etc.
131SITC of LED Jhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete.
132Repairing/Replacement of 12 volt self for 200 KVA DG set- 1No.
133SITC of Electric resistance sheet 10mm thickness size 1mtr.x 2mtr. for LT, PLC Panel, HT Panel, change over, DG set, APFC panel, APRU panel etc. complete.
134Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete.
135Miscellaneous work (like as Supply of broom-12, cloth-10 kg, damaged parts, harpic, Acid, Dettol shop, mustard oil diesel carting- charge, electric fault, with Greasing, Gland dori of pump campus and Transformer side grass cutting (9 months) etc. on periodic basis as per requirement.
136Comprehensive maintenance, Repairing of 75 HP Star delta starter, 60 HP ATS starter and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. -9 months
137SITC of 100 watt LED bulb including all material, labour charge etc. complete..
138SITC of 50 watt LED bulb including all material, labour charge etc. complete..
139Comprehensive maintenance of APFC Panel- 200 KVAR with its calibration certificate Including all cost of material and labour charges T&P.( 9 months)
140Comprehensive maintenance of LT Panel (main SFU-250 Amp. 1 Nos., SFU-150 Amp. 2 Nos.,- 100 Amp.- 5 Nos., and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, Including all cost of material and labour charges. ( 9 months)
141Repairing/Replacement of existing IP Cameras along with its 12 Month recharge. etc. complete Subjected to verification of EIC.
142Comprehensive maintenance, Repairing of suction sluice valve/Reflex vlaves with pipe fitting 200/250/300/350 mm - 4Nos. of chock ages from NRV, Pumps and dewatering, (9 months) whenever necessary as per requirement and direction of EIC.
143Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.( 1Year)
144Repairing of bypass gate actuator, gear box and filling of fresh grease with Comprehensive maintenance of by pass gate including all cost of material, labour charge etc. complete.
145Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment- Pumping Plant. of GI Strips as per side condition. ( 9 months)
146Refiling of ABC type/CO2 fire extinguisher - 6 Nos. direction of EIC at Trilochan Ghat SPS, Varanasi
147Calibration of flow meter 400mm dia (Burahan make) with totalizer in PLC baises including all cost of material, labour charges etc. complete.
148Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Pump & motor, DG set etc complete (9 months) as per requirement and direction of EIC.
149SITC of water tank with PVC pipe wiring etc. including all material, labour charge etc. complete.
150SITC of sign board ( 8x2 feet) including all material, labour charge etc. complete. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57326769
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 16-09-2026
Authority
Authority Name Uttar Pradesh Jal Nigam
Work Description Tender for Breakdown & Major Repair/Replacement Work Of Mansarover Ghat Sps And Trilochan Ghat Sps At Varanasi.
Basic Detail
Tender No 1873/E-Tender/51 Dated 29.08.2026
Bidding Type Tender
Location
City Varanasi
State Uttar Pradesh
Key Dates
Publish Date 03 Sep 2026
Submission Date 16 Sep 2026
Open Date 17 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee 5900
EMD 85100
Exemption Not Available
Document List
718a9c55-d40c-4328-95fd-d1cb95cee07b.html
BOQ_2221087.xls
DOCTRIMANBD.pdf
Tendernotice_1 (69).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Sep 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

718a9c55-d40c-4328-95fd-d1cb95cee07b.html

xls

BOQ_2221087.xls

pdf

DOCTRIMANBD.pdf

pdf

Tendernotice_1 (69).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders