Tender For Attending Repairs And Renewal Of 50Hp Pump At Cavery Palam Wtp And 30Hp Vt Pumpset ,20Hp Blower At Cavery Palam Raw Water Intakewell At Mettur Municipality
Tender Value
9.60 Lakhs
Estimated cost
Bid Submission
21 Sep 2026
6 days left
EMD
9600
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Attending Repairs And Renewal Of 50Hp Pump At Cavery Palam Wtp And 30Hp Vt Pumpset ,20Hp Blower At Cavery Palam Raw Water Intakewell At Mettur Municipality
BOQ
| Sl. No. | Item Description |
| 1 | 30HP Raw water VT pumpset Removal of 30HP oil lubricated vertical turbine pump with motor at site of work including removing bolts and nuts of bed, cutting required shims , dismantling of bowl assembly, impellor shaft, line shaft, column pipes , head soft, discharge head, bearings, drive unit, delivery side pipes , suitable tappers ,valves and specials and relevant electrical cables with motor properly etc. |
| 2 | supply and fixing of suitable size bearings of DE and NDE side of motor with applying lithium based grease. (Motor Driven size bearing No. 6313 - Roller bearing - SKF motor Non - driven side bearing No.6310 - Ball bearing - SKF) |
| 3 | Supply and fixing of motor terminal and copper stud bolt and nut applying high quality Dr.Beck air drying insulating varnish for protect the winding and connection to the motor terminals checking winding resistance, IR value of stator core complete the rate after adjusting the old scrap etc. |
| 4 | Charges for 30HP( 2609Lpm x34M )head VT Pump by cleaning and Painting of all column pipes, oil tubes, bowls discharge tee complete by scraping with wire mesh and applying two coats of anti-corrosive black paint including cost of paint and labour |
| 5 | Supply and Fixing of the SS 410 line shafts-6 Nos by Machining to true size,threading at required sides cost include Labour and Maachineing charges |
| 6 | Supply and Fixing of the Bronze Bearings-6 Nos by Machining to true size,threading at required sides cost include Labour and Maachineing charges |
| 7 | Charges for Replacing of Damaged Sch 80 Shafts Enclosing Pipe as per Standard ,cleaning of bowls and reconditioning the inner portion of bowl by filling cast iron material using welding and grinding. |
| 8 | Re-erection of 30HP oil lubricated vertical turbine pump with motor at site of work including Assembling bolts and nuts of bed, with required shims , bowl assembly, impellor shaft, line shaft, column pipes , head soft, discharge head, bearings, drive unit, delivery side pipes , suitable tappers ,valves and specials and relevant electrical cables with motor properly etc. |
| 9 | 50 HP PUMP at Cavery Plam WTP Removal of 1820Lpm x 68m HSC Pump from pumphouse and dismantling the pump rotating element bearing housing, wornout bearings, checknuts, sleeves, gun metal , impeller, damaged stainless steel shaft at workshop by using hydraulic mechanism arrangements for proper removing without damaging the gunmetal impeller. |
| 10 | Supply and fixing of SS 410 Sleeve-2 Nos ,SS 304 Shaft with Zero - Zero accuracy etc complete |
| 11 | Supply and fixing of Bronze Wearing ,DE Side SKF 6203 NDE Side SKF 6202 bearings ,Tyre coupling with Zero - Zero accuracy etc complete |
| 12 | Assembling the pump rotating element fixing gunmetal impeller and checking the alignment, and conveying the pump from workshop to pump house .bed alignment commissioning lead lift, tools and takles Zero - Zero accuracy and painting etc complete |
| 13 | 20 HP Filter bed Blower Removing and dismantling of electrical connections , 20HP Kirloskar Induction motor and Air Blower lifting from base frame to floor by movable pulley block arrangements at pump house including conveyence charges from pump house to work shop, complete, Dismantling end covers, both side wornut bearings, rotor core assembly carefully, etc.,Dismandling the blower assembly of main cover and outer cover, Lobe of the Rotor damaged roller bearing's gear set & pressing bush, ring & flange, Injection ring, splash guard, distance ring & bush, Air breather, oil level side glass, Inermediate ring, Lock Net & star wahser's, sealing bush & flanges, and star washer complete etc, |
| 14 | Charges for cleaning the stator core of motor by compressor air, pressurising water with cleaning agents, preheating of the stator core in the high capacity oven for removing the moisture in the stator core and applyng two coat of Dr. beg insulating varnish in stator core, complete etc, |
| 15 | Charges towards making grooving in the damaged portion of the Driven side of bearing seating area of motor and filling with high Quality cast iron rod by using welding,welding the wornout portion of rotor shaft bearing seating portion, metal filling, machining to match the new bearing etc machining, grinding and Properly checking the alignment and providing sleeve, etc. Complete |
| 16 | Charges for supply and fixing of suitable size bearings of DE and NDE side of motor with applying lithium based grease. (Motor Driven size bearing No. NU 312 - Roller bearing - SKF motor Non driven side bearing No.6312- Ball bearing - SKF) |
| 17 | Supply and fixing of heavy duty spherical brase gauge rollerbearing (double row) SKF 22208 E-C3 (Imported) after deducting old scrap. |
| 18 | Supply and fixing Cl pressing bush |
| 19 | Supply and fixing of injection ring after deducting old scrab |
| 20 | Supply and fixing of distance ring and bush after deducting old scrab |
| 21 | Supply and fixing of lock nut and washer |
| 22 | Supply and fixing of pressing ring, Intermediate ring after deducting old scrab |
| 23 | Supply and fixing of ceiling bush and star wahser |
| 24 | Supply and fixing of V Belt |
| 25 | Charges for Supply and fixing new shield ring and 'O' ring in centre Lobe (Rotor ) and main cover and outer cover right & left using bolt nuts etc |
| 26 | Supply and filling of Servo compreser oil - 150 grade |
| 27 | Assembling the complete Air blower compressor with motor fixing with the base frame bed. Using new bolt nuts connecting the motor pulley and finalising the allignment work and transporing charges from workshop to pump house |
| 28 | Removing the damage control cable contractor over load relay, timer, ammeter, voltmeter, selector switch fuses, bush batton from the starter complete cleaning and painting control box. |
| 29 | Supply and fixing 50 amps contactor with complete control connections. |
| 30 | Supply and fixing overload relay, timer, bush button, Indicator lamp, ammeter, voltmeter new bold nut, crimping the leg for the cable end checking the wiring complete etc. |
| 31 | Provision for GST 18% 32mm Pipe Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysSep 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender