Supply Of Supply & Erection of LT distribution board.
Tender Overview
Project Description
Supply Of supply & erection of lt distribution board. , supply & erection of lt distribution board asper pcee/grcs specification(annexure a) and m ake of cpri approvedmanufacturer consist with 3 numbers 800 a 4 pole mccb, 50kabreaking strength(2 n umbers as incoming & 1 number asoutgoing) with suitable capacity aluminum 4 pole bus bar consistwith 2 nos. 250 amps 4 pole mccb with 36 ka breaking strength,2nos 160 amps 4 pole mccb with 36 ka breakin g strength, 2 nos100 a mccb 4 pole mccb with 25 ka breaking strength, 1 no. 63a dp d-series mcb as out going including metering arrangementi.e. 3 numbers voltmeter in incoming side & ampere meter everyout going feeder. all incoming feeders to be interlocked & allswitch gears to be adjusted overload with short cir cuit setting.make: hpl, havells, l&t, legrand, t&s, bch & similar. [ warranty period: 30 months after th e date of delivery ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender