Tender For Installation, Capacity Enhancement And Line Related Works Of Distribution Converters Sanctioned In Business Plan 2026-27 Within The Area Of Electricity Distribution Section-Nawabganj/Karnailganj, Gonda.
Tender Value
2.03 Lakhs
Estimated cost
Bid Submission
07 Sep 2026
2 days left
EMD
2035
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Gonda → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Installation, Capacity Enhancement And Line Related Works Of Distribution Converters Sanctioned In Business Plan 2026-27 Within The Area Of Electricity Distribution Section-Nawabganj/Karnailganj, Gonda.
BOQ
| Sl. No. | Item Description |
| 1 | All these below items/materials from S.N. 1.01 to 1.06 shall be given and errected by the contractor on his own cost as per estimate/Resspo Norms. |
| 2 | Holding clamp for fuse set, Top, T-off, dropper, DB box etc. |
| 3 | Suspension clamp with I hook |
| 4 | I hook with clamp |
| 5 | Dead end clamp |
| 6 | LT clamp with I hook |
| 7 | Nut and bolt off. Size |
| 8 | Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.18) from Electricity Store Centre, Gonda to the work site/dump site |
| 9 | 100 KVA Transformer |
| 10 | 63 KVA Transformer |
| 11 | 25 KVA Transformer |
| 12 | PCC Pole |
| 13 | ACSR Weasel Conductor |
| 14 | AB cable |
| 15 | Stay Set complete |
| 16 | Earthing Complete |
| 17 | Top Channel |
| 18 | Dropper Channel |
| 19 | Sub Station Base |
| 20 | 11 KV fuseset |
| 21 | T-Off Channel |
| 22 | 11 KV Polymer Disc Insulator |
| 23 | Disk fitting |
| 24 | 11 KV Polymer Pin Insulator |
| 25 | LT fuseset installed in SMC Box |
| 26 | Other material |
| 27 | (B) Erection1. Any kind of fabrication work including hole in X-arm/clamp etc. shall be done by the contractor at his own cost.2. Fastner including suitable size of washer shall be provided and erected by the contractor at his own cost.3.In case of grouting cement and concrete shall be provided by the contractor at his own cost. |
| 28 | Erection of single Poles alongwith fitting of all accessories on pole. |
| 29 | Erection of sectional double pole alongwith fitting of all accessories. |
| 30 | Earthing with complete fitting |
| 31 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 32 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 33 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
| 34 | 25 KVA T/F |
| 35 | 63 KVA T/F |
| 36 | 100 KVA T/F |
| 37 | Laying, Stringing & Sagging of ABC Cable up to proper sag of different size as per estimate/resspo norms |
| 38 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
| 39 | Installation of 11 KV fuse set |
| 40 | Installation of LT Fuse set installed in SMC Box (Connecting lead shall be provided by the contractor at his own cost) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 02, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysSep 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender