Supply Of PRIMARY FUME EXTRACTION SYSTEMS(PFES) I&II OF ELECTRIC ARC FURNACES.
Tender Overview
Project Description
Supply Of primary fume extraction systems(pfes) i&ii of electric arc furnaces. , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - b (pfes - i) (1) spark arrestor with screw conveyor and sub assemblies (qty = 01 set). (2) bag house with associated sub assemblies - (qty = 01 set). (3 ) air compressor and air drier (one set consists of one air compressor and one air drier)- (q ty = 02 set). (4) id fan and motor - (qty = 01 set). (5) dust handling and disposal arrangement: silo with screw conveyor and associated accessories - (qty = 01 set). (6) plc a nd scada - (qty = 01 set). note: 01 set of schedule b consists of sl no. 1 to 6 ] , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - c (pfes - ii) (1) spark arrestor with screw conveyor and sub assemblies - (qty = 01 set). (2)bag house with associated sub assemblies - (qty = 01 set). ( 3) air compressor and air drier (one set consists of one air compressor and one air drier)- ( qty = 02 set). (4) id fan and motor - (qty = 01 set). (5) dust handling and disposal arrangeme nt: silo with screw conveyor and associated accessories - (qty = 01 set). (6) plc and scada ( qty = 01 set). note: 01 set of schedule c consists of sl. no. 1 to 6 ] , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - g residual fume duct line for hook up with existing du ct ( to process the shop floor residual fume duct ) - (qty = 06 nos.). note: 01 set consists of 06 nos as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02 and rwf ga. dr g.no. 711900310780. ] , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - a (1) chimney with associated accessories (qty= 01 no.) (2) vfd (qty= 1 set consisting of 3 nos.) note:1 set consists of sl. no. 1 & 2. ] , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - d (1) civil works (one set consists of two systems i.e. p fes- i& ii) - (qty = 01 set). (2) erection and labor - (qty = 02 sets). note: 01 set of schedule d con sists of sl no. 1 to 2 ] , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - e transportation including packing, fowarding and ins urance. (one set consists of transportation, packing, forwarding and insurance of supplies of pfes - i & ii)- (qty = 1 set) ] , design, supply, installation and commissioning of primary fume extraction syst ems(pfes) i & ii of electric arc furnaces a & b on turnkey basis, as per the detailed technical specification - rwf/m/mms/pfes-i &ii rev-02(attached) and rwf ga drg.no.711900310780(attache d). including dismantling of existing pfes, complete civil and electrical works. the scope of supply shall be as under:- schedule - f essential spares as per clause 5.18 (a) of technical sp ecification -rwf/m/mms/pfes-i &ii rev-02 (attached) (qty = 1 set). [ warranty period: 24 months af ter the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - B (PFES - I) (1) SPARK ARRESTOR WITH SCREW CONVEYOR AND SUB ASSEMBLIES (QTY = 01 SET). (2) BAG HOUSE WITH ASSOCIATED SUB ASSEMBLIES - (QTY = 01 SET). (3 ) AIR COMPRESSOR AND AIR DRIER (ONE SET CONSISTS OF ONE AIR COMPRESSOR AND ONE AIR DRIER)- (Q TY = 02 SET). (4) ID FAN AND MOTOR - (QTY = 01 SET). (5) DUST HANDLING AND DISPOSAL ARRANGEMENT: SILO WITH SCREW CONVEYOR AND ASSOCIATED ACCESSORIES - (QTY = 01 SET). (6) PLC A ND SCADA - (QTY = 01 SET). NOTE: 01 SET of Schedule B CONSISTS OF SL NO. 1 TO 6 ] |
| 2 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - C (PFES - II) (1) SPARK ARRESTOR WITH SCREW CONVEYOR AND SUB ASSEMBLIES - (QTY = 01 SET). (2)BAG HOUSE WITH ASSOCIATED SUB ASSEMBLIES - (QTY = 01 SET). ( 3) AIR COMPRESSOR AND AIR DRIER (ONE SET CONSISTS OF ONE AIR COMPRESSOR AND ONE AIR DRIER)- ( QTY = 02 SET). (4) ID FAN AND MOTOR - (QTY = 01 SET). (5) DUST HANDLING AND DISPOSAL ARRANGEME NT: SILO WITH SCREW CONVEYOR AND ASSOCIATED ACCESSORIES - (QTY = 01 SET). (6) PLC AND SCADA ( QTY = 01 SET). NOTE: 01 SET of Schedule 'C' CONSISTS OF SL. NO. 1 TO 6 ] |
| 3 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - G RESIDUAL FUME DUCT LINE FOR HOOK UP WITH EXISTING DU CT ( TO PROCESS THE SHOP FLOOR RESIDUAL FUME DUCT ) - (QTY = 06 NOS.). NOTE: 01 SET CONSISTS OF 06 NOS AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02 AND RWF GA. DR G.No. 711900310780. ] |
| 4 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - A (1) CHIMNEY WITH ASSOCIATED ACCESSORIES (QTY= 01 NO.) (2) VFD (QTY= 1 set consisting of 3 NOS.) NOTE:1 SET CONSISTS OF SL. NO. 1 & 2. ] |
| 5 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - D (1) CIVIL WORKS (ONE SET CONSISTS OF TWO SYSTEMS i.e. P FES- I& II) - (QTY = 01 SET). (2) ERECTION AND LABOR - (QTY = 02 SETS). NOTE: 01 SET of Schedule D CON SISTS OF SL NO. 1 TO 2 ] |
| 6 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - E TRANSPORTATION INCLUDING PACKING, FOWARDING AND INS URANCE. (ONE SET CONSISTS OF TRANSPORTATION, PACKING, FORWARDING AND INSURANCE OF SUPPLIES OF PFES - I & II)- (QTY = 1 SET) ] |
| 7 | DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF PRIMARY FUME EXTRACTION SYST EMS(PFES) I & II OF ELECTRIC ARC FURNACES A & B ON TURNKEY BASIS, AS PER THE DETAILED TECHNICAL SPECIFICATION - RWF/M/MMS/PFES-I &II Rev-02(ATTACHED) AND RWF GA DRG.No.711900310780(ATTACHE D). INCLUDING DISMANTLING OF EXISTING PFES, COMPLETE CIVIL AND ELECTRICAL WORKS. THE SCOPE OF SUPPLY SHALL BE AS UNDER:- SCHEDULE - F ESSENTIAL SPARES AS PER CLAUSE 5.18 (A) OF TECHNICAL SP ECIFICATION -RWF/M/MMS/PFES-I &II Rev-02 (ATTACHED) (QTY = 1 SET). [ Warranty Period: 24 Months af ter the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 25 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender