Bids Are invited for Job Contract For E And M Installations At Terminal Building Operational Area And Allied Works
Tender Overview
Project Description
Bids Are invited for Job Contract For E And M Installations At Terminal Building Operational Area And Allied Works Providing Operation And Maintenance Services Of Electrical And Mechanical Installations For 1St Year - Providing Operation And Maintenance Services Of Electrical & Mechanical Installations I.E Power Supply System, Electrical Installation Of Terminal Building, Operation Area, Car Parking Area, Street Light, Civil Office, Covering The Scope Of Operation, Repairs & Maintenance, Attending Faults / Breakdowns Rectifications, Ensuring Serviceability / Satisfactory Working Condition Of The Systems, Performing Preventive Maintenance On Daily/ Weekly/ Monthly/ Quarterly/ Half Yearly/Yearly Basis, Maintaining Of Records In All Pmi Register Etc. By Deploying 01 No High Skilled, 05 Nos Skilled, 01 No. Semi-Skilled And 02 Nos Unskilled Manpowers (Including Reliever) As Per Scope Of Work Given In Additional Terms Of Contract To Ensure Round The Clock Operation By Providing Adequate Manpower (I.E. In Three Shifts Basis, Each Shift Of 8 Hours) On All Days Including Sundays & National Holidays As Per Direction Of Eic.A) For 1St Year , Providing Maintenance Services And Operation Of Electrical And Mechanical Installations For 2Nd Year - Providing Operation And Maintenance Services Of Electrical & Mechanical Installations I.E Power Supply System, Electrical Installation Of Terminal Building, Operation Area, Car Parking Area, Street Light, Civil Office, Covering The Scope Of Operation, Repairs & Maintenance, Attending Faults / Breakdowns Rectifications, Ensuring Serviceability / Satisfactory Working Condition Of The Systems, Performing Preventive Maintenance On Daily/ Weekly/ Monthly/ Quarterly/ Half Yearly/Yearly Basis, Maintaining Of Records In All Pmi Register Etc. By Deploying 01 No High Skilled, 05 Nos Skilled, 01 No. Semi-Skilled And 02 Nos Unskilled Manpowers (Including Reliever) As Per Scope Of Work Given In Additional Terms Of Contract To Ensure Round The Clock Operation By Providing Adequate Manpower (I.E. In Three Shifts Basis, Each Shift Of 8 Hours) On All Days Including Sundays & National Holidays As Per Direction Of Eic.B) For 2Nd Year , Providing Operation And Maintenance Services Of Glf System For 1St Year - Providing Operation And Maintenance Services Of Glf Systems At Operational Area (Comprising Of Mirl/ Taxi Apron /Guidance Illuminated Signage /Afl Cables Etc.) Covering The Scope Of Operation, Repairs & Maintenance, Attending Faults / Breakdowns Rectifications, Ensuring Serviceability / Satisfactory Working Condition Of The Systems, Performing Preventive Maintenance On Daily/ Weekly/ Monthly/ Quarterly/ Half Yearly/Yearly Basis, Maintaining Of Records In All Pmi Register Etc. By Deploying 02 Nos Skilled, 01 No Semi-Skilled And 02 Nos Unskilled Manpowers (Including Reliever) As Per Scope Of Work Given In Additional Terms Of Contract To Ensure Round The Clock Operation By Providing Adequate Manpower (I.E. In Three Shifts Basis, Each Shift Of 8 Hours) On All Days Including Sundays & National Holidays As Per Direction Of Eic.A) For 1St Year , Providing Operation And Maintenance Services Of Glf System For 2Nd Year - Providing Operation And Maintenance Services Of Glf Systems At Operational Area (Comprising Of Mirl/ Taxi Apron /Guidance Illuminated Signage /Afl Cables Etc.) Covering The Scope Of Operation, Repairs & Maintenance, Attending Faults / Breakdowns Rectifications, Ensuring Serviceability / Satisfactory Working Condition Of The Systems, Performing Preventive Maintenance On Daily/ Weekly/ Monthly/ Quarterly/ Half Yearly/Yearly Basis, Maintaining Of Records In All Pmi Register Etc. By Deploying 02 Nos Skilled, 01 No Semi-Skilled And 02 Nos Unskilled Manpowers (Including Reliever) As Per Scope Of Work Given In Additional Terms Of Contract To Ensure Round The Clock Operation By Providing Adequate Manpower (I.E. In Three Shifts Basis, Each Shift Of 8 Hours) On All Days Including Sundays & National Holidays As Per Direction Of Eic.B) For 2Nd Year , Deploying 03 Nos High Skilled Computer Operator As Per Scope Of Work Given In Special Conditions Of Contract For 1St Year - Providing Of Services For Preperation Of Various Reports, Maintaining The Records, Preparation Of Rate Analysis, Estimates, Tender Documents, Sap Billings Etc Along With Various Day To Day Office Works By Deploying 03 Nos High Skilled Computer Operator As Per Scope Of Work Given In Special Conditions Of Contract On All Days Excluding Sundays And National Holidays & As Per Direction Of Eic.For 1St Year , Complete Overhuling And Repairing Of 3.5 Hp Capacity Water Pump - Complete Overhuling & Repairing Of 3.5 Hp Capacity Water Pump I/C Replacement Of Defective Keys, Necessary Lathe Work, Replacement Of Ball Bearing & Gland Packing Including Replacement Of Bush Bearing, Replacement Of Minor Hardware Items And Painting After Dismantling From The Existing Location, Transporation Upto The Workshop If Necessary & Reinstallation Of The Same, Testing Etc Complete As Required As Per Site Condition. Location - Overhead Refining For Cft At Apron Area , Complete Re-Winding Of Burnt Out Stator Coils Of 3 Ph. 3.5 Hp Induction Motor - Complete Re-Winding Of Burnt Out Stator Coils Of 3 Ph. 3.5 Hp Induction Motor Along With Removal Of The Burnt Out Copper Coil/Wire And Providing New Super Anamel Coated Copper With Insulation And Varnishing With Suitable Quality Of Varnish And Replacement Of Minor Wornout Hardware Items Etc. As Required I/C Giving Less Credit For The Burnt Out Copper Coil.Location - Overhead Refining For Cft At Apron Area , Complete Overhuling And Repairing Of 7.5 Hp Capacity Water Pump - Complete Overhuling & Repairing Of 7.5 Hp Capacity Water Pump I/C Replacement Of Defective Keys, Necessary Lathe Work, Replacement Of Ball Bearing & Gland Packing Including Replacement Of Bush Bearing, Replacement Of Minor Hardware Items And Painting After Dismantling From The Existing Location, Transporation Upto The Workshop If Necessary & Reinstallation Of The Same, Testing Etc Complete As Required As Per Site Condition.Location - Water Treatment Plant , Complete Re-Winding Of Burnt Out Stator Coils Of 3 Ph. 7.5 Hp Induction Motor - Complete Re-Winding Of Burnt Out Stator Coils Of 3 Ph. 7.5 Hp Induction Motor Along With Removal Of The Burnt Out Copper Coil/Wire And Providing New Super Anamel Coated Copper With Insulation And Varnishing With Suitable Quality Of Varnish And Replacement Of Minor Wornout Hardware Items Etc. As Required I/C Giving Less Credit For The Burnt Out Copper Coil.Location - Water Treatment Plant , Cleaning And Painting Of Street Light Tubular Pole Including Light Fitting Bracket And All Other Associated Accessories Of Height Above 5 Mtr Upto 12 Mtr - Cleaning And Painting Of Street Light Tubular Pole Including Light Fitting Bracket And All Other Associated Accessories Of Height Above 5 Mtr Upto 12 Mtr With One Coat Of Red-Oxide Metal Primer Of Anti-Corrosive Paint On Rusted Surface And One Or More Coats Of Enamelled Paint Including Numbering On The Pole Etc As Required. The Pole Shall Be Painted With Obstruction Color Upto Required Height Above The Masonary Pedestal ( 1.0 To 1.5M) As Per Direction Of Eic. , Cleaning And Painting Of Street Light Tubular Pole Including Light Fitting Bracket And All Other Associated Accessories Of Height Upto 05 Mtr - Cleaning And Painting Of Street Light Tubular Pole Including Light Fitting Bracket And All Other Associated Accessories Of Height Upto 05 Mtr With One Coat Of Red-Oxide Metal Primer Of Anti-Corrosive Paint On Rusted Surface And One Or More Coats Of Enamelled Paint Including Numbering On The Pole Etc As Required. The Pole Shall Be Painted With Obstruction Color Upto Required Height Above The Masonary Pedestal ( 1.0 To 1.5M) As Per Direction Of Eic. , Painting Of Collar Of Street Light Pole - Painting Of Collar Of Street Light Pole With One Or More Coat Of Synthetic Enamelled Paint And Application Of Red-Oxide Paint Wherever Required In Bicolour ( Black And Yellow Strip ) Complete Etc As Required And As Per Direction Of Eic. , Painting Of Glf Fittings Mirl Including Base Plate - Painting Of Glf Fittings (Mirl) Including Base Plate With One Or More Coats Of Synthetic Enamelled Paint Of Required Colour As Per Icao Standard Of Approved Make To Give An Even Shade Including Cleaning The Surface And Numbering Of The Same Etc.As Required & As Per Direction Of Eic. , Painting Of Outdoor Feeder Panel Or Lt Panel - Painting Of Outdoor Feeder Panel / Lt Panel At Switch Room In All Area With One Coat Of Metal Primer Of Anti-Corrosive Paint On Rusted Surface And Two Coats Of Approved Synthetic Enamel Paint. The Outdoor Feeder Panel Should Be Painted By Alternate White And Red Colour Strips Of Suitable Size For Operartional Area Complete As Required As Per Direction Of E.I.C.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Providing Operation and Maintenance Services of Electrical and Mechanical Installations For 1st Year | Providing Operation and Maintenance Services of Electrical & Mechanical Installations i.e power supply system, Electrical installation of terminal building, operation area, Car parking area, Street Light, Civil Office, covering the scope of operation, repairs & maintenance, attending faults / breakdowns rectifications, ensuring serviceability / satisfactory working condition of the systems, performing preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintaining of records in all PMI register etc. by deploying 01 No High skilled, 05 Nos skilled, 01 No. Semi-Skilled and 02 Nos unskilled manpowers (Including Reliever) as per scope of work given in Additional Terms of Contract to ensure round the clock operation by providing adequate manpower (i.e. in three shifts basis, each shift of 8 hours) on all days including Sundays & National Holidays as per direction of EIC.a) For 1st Year |
| 2 | Providing Maintenance Services and operation of Electrical and Mechanical Installations For 2nd Year | Providing Operation and Maintenance Services of Electrical & Mechanical Installations i.e power supply system, Electrical installation of terminal building, operation area, Car parking area, Street Light, Civil Office, covering the scope of operation, repairs & maintenance, attending faults / breakdowns rectifications, ensuring serviceability / satisfactory working condition of the systems, performing preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintaining of records in all PMI register etc. by deploying 01 No High skilled, 05 Nos skilled, 01 No. Semi-Skilled and 02 Nos unskilled manpowers (Including Reliever) as per scope of work given in Additional Terms of Contract to ensure round the clock operation by providing adequate manpower (i.e. in three shifts basis, each shift of 8 hours) on all days including Sundays & National Holidays as per direction of EIC.b) For 2nd Year |
| 3 | Providing Operation and Maintenance Services of GLF system For 1st Year | Providing Operation and Maintenance Services of GLF systems at operational area (comprising of MIRL/ TAXI APRON /Guidance Illuminated Signage /AFL cables etc.) covering the scope of operation, repairs & maintenance, attending faults / breakdowns rectifications, ensuring serviceability / satisfactory working condition of the systems, performing preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintaining of records in all PMI register etc. by deploying 02 Nos skilled, 01 No Semi-Skilled and 02 Nos Unskilled manpowers (Including Reliever) as per scope of work given in Additional Terms of Contract to ensure round the clock operation by providing adequate manpower (i.e. in three shifts basis, each shift of 8 hours) on all days including Sundays & National Holidays as per direction of EIC.a) For 1st Year |
| 4 | Providing Operation and Maintenance Services of GLF system For 2nd Year | Providing Operation and Maintenance Services of GLF systems at operational area (comprising of MIRL/ TAXI APRON /Guidance Illuminated Signage /AFL cables etc.) covering the scope of operation, repairs & maintenance, attending faults / breakdowns rectifications, ensuring serviceability / satisfactory working condition of the systems, performing preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintaining of records in all PMI register etc. by deploying 02 Nos skilled, 01 No Semi-Skilled and 02 Nos Unskilled manpowers (Including Reliever) as per scope of work given in Additional Terms of Contract to ensure round the clock operation by providing adequate manpower (i.e. in three shifts basis, each shift of 8 hours) on all days including Sundays & National Holidays as per direction of EIC.b) For 2nd Year |
| 5 | Deploying 03 Nos High Skilled Computer Operator as per scope of work given in special conditions of contract For 1st Year | Providing of services for preperation of various reports, maintaining the records, preparation of rate analysis, estimates, tender documents, SAP billings etc along with various day to day office works by deploying 03 Nos High Skilled Computer Operator as per scope of work given in special conditions of contract on all days excluding sundays and National holidays & as per direction of EIC.For 1st Year |
| 6 | Complete Overhuling and repairing of 3.5 HP capacity water pump | Complete Overhuling & repairing of 3.5 HP capacity water pump i/c replacement of defective keys, necessary lathe work, replacement of ball bearing & gland packing including replacement of bush bearing, replacement of minor hardware items and painting after dismantling from the existing location, transporation upto the workshop if necessary & reinstallation of the same, testing etc complete as required as per site condition. Location - Overhead refining for CFT at Apron area |
| 7 | Complete Re-winding of burnt out stator coils of 3 Ph. 3.5 HP induction motor | Complete Re-winding of burnt out stator coils of 3 Ph. 3.5 HP induction motor along with removal of the burnt out copper coil/wire and providing new super anamel coated copper with insulation and varnishing with suitable quality of varnish and replacement of minor wornout hardware items etc. as required i/c giving less credit for the burnt out copper coil.Location - Overhead refining for CFT at Apron area |
| 8 | Complete Overhuling and repairing of 7.5 HP capacity water pump | Complete Overhuling & repairing of 7.5 HP capacity water pump i/c replacement of defective keys, necessary lathe work, replacement of ball bearing & gland packing including replacement of bush bearing, replacement of minor hardware items and painting after dismantling from the existing location, transporation upto the workshop if necessary & reinstallation of the same, testing etc complete as required as per site condition.Location - Water Treatment Plant |
| 9 | Complete Re-winding of burnt out stator coils of 3 Ph. 7.5 HP induction motor | Complete Re-winding of burnt out stator coils of 3 Ph. 7.5 HP induction motor along with removal of the burnt out copper coil/wire and providing new super anamel coated copper with insulation and varnishing with suitable quality of varnish and replacement of minor wornout hardware items etc. as required i/c giving less credit for the burnt out copper coil.Location - Water Treatment Plant |
| 10 | Cleaning and painting of street light tubular pole including light fitting bracket and all other associated accessories of height above 5 mtr upto 12 mtr | Cleaning and painting of street light tubular pole including light fitting bracket and all other associated accessories of height above 5 mtr upto 12 mtr with one coat of red-oxide metal primer of anti-corrosive paint on rusted surface and one or more coats of enamelled paint including numbering on the pole etc as required. The pole shall be painted with obstruction color upto required height above the masonary pedestal ( 1.0 to 1.5m) as per direction of EIC. |
| 11 | Cleaning and painting of street light tubular pole including light fitting bracket and all other associated accessories of height upto 05 mtr | Cleaning and painting of street light tubular pole including light fitting bracket and all other associated accessories of height upto 05 mtr with one coat of red-oxide metal primer of anti-corrosive paint on rusted surface and one or more coats of enamelled paint including numbering on the pole etc as required. The pole shall be painted with obstruction color upto required height above the masonary pedestal ( 1.0 to 1.5m) as per direction of EIC. |
| 12 | Painting of collar of street light pole | Painting of collar of street light pole with one or more coat of synthetic enamelled paint and application of red-oxide paint wherever required in bicolour ( black and yellow strip ) complete etc as required and as per direction of EIC. |
| 13 | Painting of GLF fittings MIRL including base plate | Painting of GLF fittings (MIRL) including base plate with one or more coats of synthetic enamelled paint of required colour as per ICAO standard of approved make to give an even shade including cleaning the surface and numbering of the same etc.as required & as per direction of EIC. |
| 14 | Painting of outdoor feeder panel or LT Panel | Painting of outdoor feeder panel / LT Panel at Switch Room in all area with one coat of metal primer of anti-corrosive paint on rusted surface and two coats of approved Synthetic Enamel paint. The outdoor feeder panel should be painted by alternate white and red colour strips of suitable size for operartional area complete as required as per direction of E.I.C. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender