Tender For Supplying, Installation, Testing And Commissioning Of Plc And Scada System For Energy Monitoring And Control For Various 11 Kv Substation, Lifts And Reservoirs At Iit Delhi.
Tender Value
2.49 Crore
Estimated cost
Bid Submission
23 Sep 2026
8 days left
EMD
4.99 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supplying, Installation, Testing And Commissioning Of Plc And Scada System For Energy Monitoring And Control For Various 11 Kv Substation, Lifts And Reservoirs At Iit Delhi.
BOQ
| Sl. No. | Item Description |
| 1 | Description (Section-A)Design, development, supplying, installation, testing and commissioning of Duly wired Control panel fabricated out of C.R.C.A 2 mm M.S sheet for housing PLC hardware, Redundant 24V DC power supply, interposing relays for Digital Outputs & Consumables with complete as required.Make: - Hoffman/Pyrotech Having following PLC Hardware:- |
| 2 | Main Sub-Station [01 Nos.]1.1.1 --logic controller, Modicon M241, 40 IO, transistor, PNP, Ethernet- 1 Nos1.1.2 -- discrete input module, Modicon TM3, 32 inputs, HE10, 24V DC-3 nos1.1.3 -- discrete output module, Modicon TM3, 32 outputs transistor PNP, HE10-1 nos1.1.4 -- preformed cable, Twido, for IO extension, 2m- 8 Nos1.1.5 -- Modbus to Modbus TCP Gateway-6 Nos1.1.6 -- 16PORT unmanage switch - 1 nos1.1.7 -- 10amp Redundant Power supply with diode ORing -1 nos1.1.8 -- Interposing relays 1C/O 24VDC ON DO/DI ONLY- 128 nos |
| 3 | Bharti Sub-Station [01 Nos.]1.2.1 --logic controller, Modicon M241, 40 IO, transistor, PNP, Ethernet-1 Nos1.2.2 -- discrete input module, Modicon TM3, 32 inputs, HE10, 24V DC- 3 nos1.2.3 -- discrete output module, Modicon TM3, 16 relay outputs, screw, 24V DC-1 nos1.2.4 -- preformed cable, Twido, for IO extension, 2m- 8 nos1.2.5 -- Modbus to Modbus TCP Gateway- 8 nos1.2.6 -- 16PORT unmanage switch - 1 nos1.2.7 -- 10amp Redundant Power supply with diode ORing - 1 nos1.2.8 -- Interposing relays 1C/O 24VDC ON DO/DI ONLY- 112 nos |
| 4 | TIFAC Sub-Station, Library Substation, Computer Sub Station, Civil eng Sub station, Zanskar Sub station, Himadri Substation, Girnar Sub Station, Dronagiri sub station, Shayadri sub station, Reservoir 2, Reservoir 3 [11 Nos.]1.3.1 --logic controller, Modicon M241, 40 IO, transistor, PNP, Ethernet- 1 NOS1.3.2 -- discrete input module, Modicon TM3, 32 inputs, HE10, 24V DC-1 NOS1.3.3 -- discrete output module, Modicon TM3, 16 relay outputs, screw, 24V DC-1 NOS1.3.4 -- preformed cable, Twido, for IO extension, 2m- 4 NOS1.3.5 -- Modbus to Modbus TCP Gateway- 4 NOS1.3.6 -- 16PORT unmanage switch - 1 NOS1.3.7 -- 10amp Redundant Power supply with diode ORing - 1 NOS1.3.8 -- Interposing relays 1C/O 24VDC ON DO/DI ONLY- 48 NOS |
| 5 | Chemical Engg Sub-Station, MSB Sub Station, Nilgiri Sub station, Hospital Sub Station, Synergy Sub station, 6 RMU sub station, Block-VI NRF Sub-Station, LHC sub station, RI Park substation, 99 B Sub-Station, 99 C Sub-Station, Data Center Sub station [12 Nos.]1.4.1 --logic controller, Modicon M241, 40 IO, transistor, PNP, Ethernet- 1 NOS1.4.2 -- discrete input module, Modicon TM3, 32 inputs, HE10, 24V DC- 2NOS1.4.3 -- discrete output module, Modicon TM3, 16 relay outputs, screw, 24V DC-1 NOS1.4.4 -- preformed cable, Twido, for IO extension, 2m- 6 NOS1.4.5 -- Modbus to Modbus TCP Gateway- 4 NOS1.4.6 -- 16PORT unmanage switch - 1 NOS1.4.7 -- 10amp Redundant Power supply with diode ORing - 1 NOS1.4.8 -- Interposing relays 1C/O 24VDC ON DO/DI ONLY- 80 NOS |
| 6 | Reservoir 1 [01 Nos.]1.5.1 --logic controller, Modicon M241, 40 IO, transistor, PNP, Ethernet- 1 NOS1.5.2 -- discrete input module, Modicon TM3, 32 inputs, HE10, 24V DC- 1 NOS1.5.3 -- discrete output module, Modicon TM3, 16 relay outputs, screw, 24V DC- 1NOS1.5.4 -- preformed cable, Twido, for IO extension, 2m- 4 NOS1.5.5 -- analog input module, Modicon TM3, 8 inputs, screw, 24V DC- 1 NOS1.5.6 -- analog output module, Modicon TM3, 4 outputs, screw, 24V DC- 1 NOS1.5.7 -- Modbus to Modbus TCP Gateway- 4 NOS1.5.8 -- 16PORT unmanage switch - 1 NOS1.5.9 -- 10amp Redundant Power supply with diode ORing - 1 NOS1.5.10 -- Interposing relays 1C/O 24VDC ON DO/DI ONLY- 60 NOS |
| 7 | Description (Section-B) |
| 8 | Design, development, supplying, installation, testing and commissioning of Power SCADA/Plant SCADA with 10000 Tag with Driver IEC61850 compatible. IEC 61850 data modelling and communications: Maer and Client SCADA PC with Licence for Redundancy (2 SCADA package software with license ) Up to 10,000 configurable data points (“tags”) for SCADA monitoring and control,Built-in historian for data logging, analytics, alarms and events. Scalable architecture (can expand beyond licensing by upgrade) Report Development and Generation as per the direction of Engineer in charge. |
| 9 | Description Section - C Hardware & Assessories |
| 10 | Supplying, installation, testing and commissioning of PC with Latest generation processor, Core i7, 14thGen, 16 Gb Ram , 1Tb SSD, Key Board Mouse Set , K.B Mouse Set Dual Lan Port 6 No. USB port, Windows 10 proff. Original , 24”inch Hp Screen , Mac Fee ANTIVIRUS 1 Year , 1 GB Graphics card ,3 Year Warranty , MS Office std PC (2 SCADA SERVER + 1 SCADA WORKSTATION ), (24\\" MONITOR), + (1 REPORT SERVER) complete as required and as per the direction of Engineer in charge. |
| 11 | Supplying, installation, testing and commissioning of ethernet STP cable CAT6A as complete as required. |
| 12 | Supplying, installation, testing and commissioning of ethernet patch cable of 2 metre length as complete as required. |
| 13 | Supplying, installation, testing and commissioning of RJ45 ethernet connector as complete as required. |
| 14 | Supplying, installation, testing and commissioning of 6 PORT LIU ( FULLY LOADED) as complete as required. |
| 15 | Supplying, installation, testing and commissioning of PATCH CORDS FO (SM) as complete as required. |
| 16 | Supplying, installation, testing and commissioning of ARMOURED CONTROL CABLE 1X18C as complete as required. |
| 17 | Supplying, installation, testing and commissioning of ARMOURED POWER CABLE 2.5X3C as complete as required. |
| 18 | Supplying, installation, testing and commissioning of ARMOURED MODBUS CABLE 2.5X3C |
| 19 | Supplying, installation, testing and commissioning of JB FOR FIELD TERMINAL as complete as required. |
| 20 | Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) ON LINE Uninterrupted Power Supply (UPS) system suitable for Single Phase input, Single Phase output AC Supply. The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. The UPS systems shall be Microprocessor based Digital Control, using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter with PWM (Pulse Width Modulation) Technology. The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >95% at 100% non-linear loads. Current total harmonic distortion(ITHD)/ total demand distortion (TDD) on the input grid shall be < 5% at 100 %load. (The required LC filters shall be included in UPS cost), extreme power factor kit to be include to limit the input pf to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ) |
| 21 | however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factor loads. UPS shall be suitable for incoming supply AC single phase 160-270V 50 Hz and delivering output AC supply true sine wave single phase 220/230/240 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins and 150% for 1 minute. Operating temperature 0 to 40 0C, Relative humidity 0-95% non condensing, noise level less than 60db at 1 meter distance, Protection for Under voltage, over voltage, abnormal output voltage, battery over charging, output over current, short circuit, battery deep discharge , 10 KV surge. Display for watt/VA,Amp and Voltage power parameters etc. UPS shall comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI) type UPS (as per standard IEC 62040-1, 2 & 3) . The UPS should be with IGBT Based Inverter Technology, Communication RS232/ RS485/ SNMP port open protocol for BMS integration as per approved by Engineering in charge. Required battery racks, DC breaker of suitable rating and interconnecting copper conductor cable of suitable size and connectors and all required accessories are inclusive in the cost. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etcSr. No. as per SOQ 3.11.1--6KVA |
| 22 | Supplying and installing following size of perforated Hot Dipped Galvanised Iron cable tray (Galvanisation thickness not less than 50 microns) with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I. bolts & nuts, etc. as required.Sr. No. as per SOQ 3.12.1 --- 300 mm width X 50 mm depth X 1.6 mm thickness |
| 23 | Supplying and installing following size of perforated Hot Dipped Galvanised Iron cable tray \\"bends\\" (galvanisation not less than 50 microns) with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I. bolts & nuts, etc. as required.Sr. No. as per SOQ 3.13.1 --- 300 mm width X 50 mm depth X 1.6 mm thickness Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 02, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 23, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysSep 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender