Chemicals and Fertilizers Government Departments Closing in 3 days TDR #57309057

Tender For Replacement Of Conveyor Drums, Bearings, Idlers, Idler Frames Etc. Of Various Conveyors In Offsite Area And The Np Plant, Fact Cd

Issued by Government Departments · Ernakulam, Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Sep 2026
3 days left
EMD
5000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Replacement Of Conveyor Drums, Bearings, Idlers, Idler Frames Etc. Of Various Conveyors In Offsite Area And The Np Plant, Fact Cd

BOQ

Name of Work:- REPLACEMENT OF CONVEYOR DRUMS, BEARINGS, IDLERS, IDLER FRAMES ETC. OF VARIOUS CONVEYORS IN OFFSITE AREA AND THE NP PLANT, FACT CD
Sl. No. Item Description
1Replacement of damaged Drums, Bearings, Idlers, Idler Frames etc. of various Product Conveyors in Offsite area and the NP Plant, FACT CD.
2Replacement of drive drums, tripper drums and gravity pulley of product conveyors at NP Plant/OffsiteWork involves: Collection and transportation of required tools and tackles from the Workshop/Toolcrib department. The spare drum shall be transported from the off-site/stores/workshop to the work location and positioned appropriately. Upon receiving clearance from the Process Department, the conveyor belt shall be properly arrested using belt clamps after lifting the gravity weight. The damaged drum, along with the Plummer blocks and bearings, shall then be dismantled and shifted to the Off-site Mechanical Workshop. New bearings and Plummer blocks on both sides shall be installed with proper lubrication. After completion, the belt clamps shall be released, the required gravity weight reapplied, and the conveyor tested under load without any sway. Rigging assistance shall be provided for coupling/decoupling and alignment of the drums
3Replacement of Tail drums, Bend pulleys and Snub pulleys etc. of product conveyors at NP Plant/ OffsiteWork involves: Collection and transportation of tools and tackles required for the work from Workshop/Toolcrib dept. Spare drum shall be transported to work site from Off site / stores / workshop and positioned at the required place. After getting the process clearance, the belt shall be arrested properly with belt clamps, after lifting the gravity weight. The damaged drum with Plummer block and bearings shall be dismantled and taken to Offsite Mechanical workshop. New bearings and plummer block at both side shall be fixed properly with lubricant. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway. Rigging assistance shall be provided for the alignment of drums. Dismantling and refixing of the zero speed sensor, to facilitate drum replacement, falls under the scope of the contractor.
4Removal and Refixing of the product conveyor drums for lagging purpose at NP Plant/ OffsiteThe work involves collection and transportation of the necessary tools and tackles from the Workshop/Toolcrib department. The specific drums to be lagged will be identified by the shift engineer. After obtaining process clearance, the conveyor belt shall be properly arrested using belt clamps, following the lifting of the gravity weight. The drum requiring lagging, along with its Plummer block and bearings, shall be dismantled and kept aside for lagging purposes. Note: The drum lagging work is not under the contractor’s scope. Once lagging is completed and clearance is received from the shift engineer for reinstallation, the drum shall be positioned properly, bearings inspected, and Plummer blocks on both sides reassembled with appropriate lubrication. After completing all mechanical works, release the belt clamps, reapply the required gravity weight, and test the conveyor under load to ensure smooth operation without sway. Rigging assistance shall be provided for the coupling/decoupling and alignment of the drums. Dismantling and refixing of the zero speed sensor, to facilitate drum replacement, falls under the scope of the contractor.
5Replacement of Troughing/Imapact idlers in bagging plant / product conveyors.Work involves: The required troughing/impact idlers shall be transported from the plant area or stores to the work site. Upon receiving work clearance from the Process Department, the damaged troughing idlers of conveyors in the NP Offsite and Bagging Plant areas shall be replaced as per the instructions of the Officer-in-Charge. The removed damaged idlers shall then be transported to the off-site/scrap yard.
6Replacement of return idlers / clamps of bagging plant / product conveyors.Work involves: The required return idlers / clamps shall be transported from Plant area or stores to the work site. Upon receiving the work clearance from Process Department., the damaged return Idlers/clamps of conveyors in NP offsite/bagging plant areas shall be replaced, as per the instructions of Officer-in-Charge. The removed damaged return Idlers/clamps shall be transported to off-site/scrap yard.
7Replacement of Troughing Idler Frames, Impact Idlers Frames And Self Aligning Idler Frames With Rollers Of All Sizes of Product Conveyors at NP & Offsite.Work involves: The required materials shall be transported from Plant area or stores to the work site. Upon receiving the work clearance from Process Department., dismantle the defective idler frames with roller from the position in the conveyor line, clean the area properly, repair/replace the frame with rollers, and fix them back in position as per the instructions from the Officer-in-Charge. Damaged repairable frames shall be kept at the proper location as per the instructions from the Officer-in-Charge, damaged unrepairable frames shall be transported to the scrapyard.
8Servicing of damaged return idlers of 750mm wide bagging plant / product conveyors.Work involves : Re usable rubber disc shall be removed from the damaged return idlers. Return idlers shall be serviced / repaired by replacing the rubber discs / bearings as per the instructions of the Officer-in-Charge. The serviced return idlers shall be kept properly at Offsite area as spare.
9Replacement of bearings of various conveyor drums.Work involves: The belt shall be arrested properly with belt clamps, after lifting the gravity weight. The bearing & plummer block of drum/pulley shall be replaced with new/serviced one. Bearings shall be lubricated properly with grease. The drum shall be aligned / fixed to the connecting part, as per instruction of the Officer-in -Charge. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway.
10Servicing bearings of various conveyor drums.Work involves: The belt shall be arrested properly with belt clamps, after lifting the gravity weight. The bearing & plummer block of drum/pulley shall be serviced. Bearing's locknut and clearance to be checked as per instruction of the Officer-in-Charge. Bearings shall be lubricated properly with grease after the inspection. The drum shall be aligned/fixed to the connecting part, as per instruction of the Officer-in-Charge. Release belt clamps, provide required gravity weight and service the conveyor on load with out any sway. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57309057
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-09-2026
Authority
Authority Name Fertilisers And Chemicals Travancore Limited
Work Description Tender for Replacement Of Conveyor Drums, Bearings, Idlers, Idler Frames Etc. Of Various Conveyors In Offsite Area And The Np Plant, Fact Cd
Basic Detail
Tender No 4096/2026-2027/E34094
Bidding Type Tender
Location
City Ernakulam
State Kerala
Key Dates
Publish Date 02 Sep 2026
Submission Date 17 Sep 2026
Open Date 18 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5000
Exemption Available
Document List
9e3fec15-6648-4a2f-ac34-f869960b7f9e.html
BOQ_971501.xls
Compliance.pdf
SpecialConditions.pdf
Tenderdocuments.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 02, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Sep 18, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

9e3fec15-6648-4a2f-ac34-f869960b7f9e.html

xls

BOQ_971501.xls

pdf

Compliance.pdf

pdf

SpecialConditions.pdf

pdf

Tenderdocuments.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders