Tender For Consultancy Services For Authoritys Engineer For Supervision Of Construction Of Intermediate Lane Of Pango To Jorging Road From Design Km 40+000 To Design Km 82+060 Section Of Frontier Highway (Nh-913) (Design Length: 42.06 Km, Package-Ii,
Tender Overview
Project Description
Tender for Consultancy Services For Authoritys Engineer For Supervision Of Construction Of Intermediate Lane Of Pango To Jorging Road From Design Km 40+000 To Design Km 82+060 Section Of Frontier Highway (Nh-913) (Design Length: 42.06 Km, Package-Ii, Greenfield Alignment) In The State Of Arunachal Pradesh On Epc Mode. (Total Project Length = 42.06 Km).
BOQ
| Sl. No. | Item Description |
| 1 | Professional Staff |
| 2 | Team Leader Cum Senior Highway Engineer 1 No. |
| 3 | Resident cum Highway Engineer 1 No. |
| 4 | Bridge/Structural Engineer 1 No. |
| 5 | Senior Pavement Specialist 1 No. |
| 6 | Senior Quality Cum Material Expert 1 No. |
| 7 | Road Safety Expert 1 No. |
| 8 | Senior Geotechnical Expert 1 No. |
| 9 | Sub-Professional Staff |
| 10 | Survey Engineer, 1 Nos. |
| 11 | Assistant Highway Engineer, 2 Nos. |
| 12 | Lab Technician, 2 No. |
| 13 | Assistant Bridge Engineer, 1 Nos. |
| 14 | Assistant Quality cum Material Engineer, 2 Nos. |
| 15 | Quantity Surveyor, 1 No. |
| 16 | Support Staff (inclusive of per diem allowance) |
| 17 | Office Manager (1 No) |
| 18 | Accountant Cum Cashier (1 No) |
| 19 | Steno cum Computer operator (1 No) |
| 20 | Office Boy (1 No) |
| 21 | Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 6000km/month run |
| 22 | Scorpio or equivalent vehicle (not more than 3 years old) (1 nos .) |
| 23 | Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.) |
| 24 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 45 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete) |
| 25 | Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. |
| 26 | One Office of Minimum 200 sqm area shall be rented at one location in midway of project during Construction Period |
| 27 | Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc. |
| 28 | During Construction Period |
| 29 | During Maintenance Period |
| 30 | Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. |
| 31 | During Construction Period |
| 32 | During Maintenance Period |
| 33 | Reports and Document Printing |
| 34 | Monthly reports |
| 35 | Half yearly Reports |
| 36 | Various other reports as provided in the Concession Agreement such as Completion Report |
| 37 | Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc. |
| 38 | Surface defects detection and roughness measurement using Network Survey Vehicle(39 kms) |
| 39 | Pavement strength measurement using FWD ((39 kms) |
| 40 | Bridge inspection using Mobile Bridge Inspection Unit (1.08 Km) |
| 41 | Road signs inspection using Retro Reflectometer (39 km) |
| 42 | Contingencies |
| 43 | Overhead in % of Total CostThe consultant shall quote a fixed percentage of overhead, which may include overhead charges over the salary of key personnel, sub professional staff and other parts of financial proposal except contingencies , cost of the coordinator/ other support staff and profits. |
| 44 | Amount of Performance Security to be submitted by the Bidder (Minimum Amount to be 5% of the Financial Quote) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 41 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 42 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender