Drinking Water Supply and Sanitation Local Bodies Closing in 0 days TDR #57299395

Tender For Construction Of Bridge Across The Channel At Rajiv Gandhiroad In Ward No.31, Central Zone. Roc No.3189/2026/Md5

Issued by Local Bodies · Coimbatore, Tamil Nadu
Tender Value
49.90 Lakhs
Estimated cost
Bid Submission
15 Sep 2026
0 days left
EMD
49900
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Coimbatore → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Bridge Across The Channel At Rajiv Gandhiroad In Ward No.31, Central Zone. Roc No.3189/2026/Md5

BOQ

Name of Work:- Construction of Bridge across the channel at rajiv gandhiRoad in Ward No.31, Central Zone. ROC No.3189/2026/MD5
Sl. No. Item Description
1Cleaning the Channel Using Poclain on either Sides of the 1 bridge including dismantling the old Structure and Providing Temorary Odai
2A Foundation
3Earthwork excavation in all classes of soil except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing 3 and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS & RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013)
4Depth 0m to 2.0m
5Earthwork excavation in Soft Disintegrated Rock not requiring blasting except medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013)
6Depth 2.0m to 3.0m
7Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for LEVELLING COURSE. Under footing as per 2100 of MORT&H Specficaton (Fifth Revision-2013)
8Depth 2.0m to 3.0m
9Supplying and erection shuttering, including necessary supports for plain in all floors using mild steel sheets of size 90x 60 cms 5 and BG 10 stiffed with surfacewelded mild steel angles for boarding supported by casuarina props at suitable intervals etc. completecomplying with standard specifications as directed.
10For Vertical Wall for Bridge Footing
11For Slope Centring Abutment & Pier
12For Beam Slab
13Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF ABUTMENT AND RETURN WALLS. as per Section 1500,1700 & 2100 of MORT&H Specficaton (Fifth Revision-2013)
14B Sub Structure
15Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at 7 depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, RETURN WALL AND PIERS ABOVE SILL LEVEL. as per Section 1500,1700 & 2200 of MORT&H Specficaton (Fifth Revision-2013)
16Vibrated Reinforced Cement Concrete of grade M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.as per Section 1500,1700 & 2200 of MORT&H Specficaton (Fifth Revision-2013)
17Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.
18Vibrated Reinforced Cement Concrete of grade M30 Design Mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB and Safety Kerb. as per Section 1500,1700 & 2300 of MORT&H Specficaton (Fifth Revision-2013
19Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc.,, complete for RCC Hand Rail. as per Section 811,1700 & 2703.3 of MORT&H Specficaton (Fifth Revision-2013)
20Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013)
21Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing 13 to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete. FOR WEARING COAT as Mesh Reinforcement. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013)
22D Protection Work
23Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton (Fifth Revision-2013)
24Supplying and fixing GI DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc., complete as per cl 2705 of MORT&H specification. (V Revision)
25Providing FILTER MEDIA behind Abutment and Returns for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-Rev.5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite including labour charges and all other incidental charges, etc complete. as per CI.710.1.4 & Appendix 6 of IRC:78-2014
26Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete(In Deck slab)
27Filling behind Abutments and return wall with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete. as per CI.710.1.4 & Appendix 6 of IRC:78-2014
28Providing and fixing class1 PVC seepage pipes of 100 mm dia of required lengths for retaining walls including costs and conveyance of all materials to work site and labour charges for fixing, including backing aggregate for draining seepage water etc., (Weep hole)
29Painting two coats with Ready mix plastic enamel paint and approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts over cement surface Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57299395
AUTHORITY Local Bodies
TENDER VALUE 49.90 Lakhs
LAST DATE 15-09-2026
Authority
Authority Name Municipal Adminitration And Water Supply Department
Work Description Tender for Construction Of Bridge Across The Channel At Rajiv Gandhiroad In Ward No.31, Central Zone. Roc No.3189/2026/Md5
Basic Detail
Tender No e62/2026-cz two cover
Bidding Type Tender
Location
City Coimbatore
State Tamil Nadu
Key Dates
Publish Date 02 Sep 2026
Submission Date 15 Sep 2026
Open Date 16 Sep 2026
Finance
Tender Value 49.90 Lakhs
Tender Fee Ref. Documents
EMD 49900
Exemption Not Available
Document List
3e4f348f-fa76-4a39-a79f-f169f6e58211.html
BOQ_841901.xls
Bridge.pdf
ITB.pdf
Tendernotice_1 (14).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 02, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Sep 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 1 day

Tender Documents

Download All (ZIP) ↓
html

3e4f348f-fa76-4a39-a79f-f169f6e58211.html

xls

BOQ_841901.xls

pdf

Bridge.pdf

pdf

ITB.pdf

pdf

Tendernotice_1 (14).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders