Bids Are invited for Custom Bid For Services - De-Equipping And De-Storing Of Ins Vipul - Removal Pcgt With Accessories , Removal Scgt With Accessories , Removal Pbgt With Accessories , Removal Sbgt With Accessories , Removal Pcrg With Accessories ,
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - De-Equipping And De-Storing Of Ins Vipul - Removal Pcgt With Accessories , Removal Scgt With Accessories , Removal Pbgt With Accessories , Removal Sbgt With Accessories , Removal Pcrg With Accessories , Removal Scrg With Accessories , Removal Pbrg With Accessories , Removal Sbrg With Accessories , Removal All Gts And Rgs Control Station. Qty-06 (Cgt-02, Bgt-02, Crg-02) , Removal Fuel Transfer Pump , Removal Hpac 1 With Accessories , Removal Hpac 2 With Accessories , Removal Da 1 With Accessories , Removal Da 2 With Accessories , Removal Da 3 With Accessories , Removal Firemain Strainer , Removal Firemain Compansator , Removal Bgt Exhaust Door , Removal Bgt Exhaust Door Hydraulic System , Removal Ptog Bottle , Removal Of Gt L/O Coolers , Removal Of Gt L/O Coolers , Removal Eductors , Removal Steering Gear Pp With Motor And Hydraulic Ram Unit , Removal Centrifuge , Removal Ccc Panel , Removal Orion Panel Of All 04 Gts, 02 Orion Panel Of Scoop And Orion Pump , Removal Of Ro Plant With All Accessories , Removal Of Pac , Removal Ref Plants , Removal Hold Pp , Removal F/W Pp , Removal Galley Pp , Removal Fuel Booster Pp Fwd , Removal Fuel Booster Pp Aft , Removal Of All Hp Air Bottles , Removal 9-11 Reducer , Removal 25-30 Reducer , Removal 100-110 Reducer , Removal Firemain Pumps , Removal Fuel Pressure Regulator (Rdt-40) , Removal Ac Cooling Pp , Degutting Of Electro Hydraulic Capstan Will All Its Accessories , Degutting Of Electro Mechanical Capstan Will All Its Accessories , Degutting And Removal Of Diesel Alternator , Degutting And Removal Of Ships Convertor 220V 400Hz , Degutting And Removal Of Bakc Rectifier (Ships Rectifier) , Degutting And Removal Of Bakc Rectifier (Ships Rectifier) , Degutting And Removal Of Rectifier For Gt Starter , Degutting And Removal Of Rectifier Bak (E)(P) – 22-28 – 5 Pbm Missile , Degutting And Removal Of Acos (Automatic Change Over Switch) , Degutting And Removal Of Diesel Generator Control , Degutting And Removal Of Orion System , Degutting And Removal Of Lidyne (Ak 176) , Degutting And Removal Of Convertor Ato--2-400 , Degutting And Removal Of Bakc Rectifier (Ak 630) , Degutting And Removal Of Convertor (Baza) , Degutting And Removal Of Motor Steering Pump , Degutting And Removal Of Battery Charging Rectifier , Degutting And Removal Of Degaussing System , Degutting And Removal Of Motor Gt Lube Oil , Degutting And Removal Of Motor (Fresh Water Pump) 240 Mw-22-11 Ms (Bathroom) , Degutting And Removal Of Motor Fuel Feed Pump 2Mdw112 S4 Om5 , Degutting And Removal Of Motor Fire Main (02 In Nos) , Degutting And Removal Of Lp Switch Board Apc-231B , Degutting And Removal Of Switch Board Apc-231B , Degutting And Removal Of Motor Ventilation 2Smw80 B2 Om5 , Degutting And Removal Of Ccc Panel (Gt Starting Panel) , Degutting And Removal Of Convertor For Degaussing System , Degutting And Removal Of Stater Pp & Cooling Pp , Degutting And Removal Of Convertor Garpun , Degutting And Removal Of Convertor For Fcs Computer (Vymple) , Degutting And Removal Of Starter For F/W Pump (1.5 Kw) , Degutting And Removal Of Starter Panel Refrigeration Plant , Degutting And Removal Of Capstan Controller Panel , Degutting And Removal Of Iccp M/S Sargam Metals , Degutting And Removal Of Capstan Motor Fwd & Aft And Their Subunits , Degutting And Removal Of Electric Siren , Degutting And Removal Of Gyro Std 22M And Its Subunits , Degutting And Removal Of Keltron Em Log V2 And Its Subunits , Degutting And Removal Of Keltron Echosounder V3.1 And Its Subunits , Degutting And Removal Of Ots Wsds , Degutting And Removal Of Igtsr , Degutting And Removal Of Vision Master , Degutting And Removal Of Mod Cms And Its Subunits , Degutting And Removal Of Saurya (Varuna Lite) And Its Subunits , Degutting And Removal Of Ecdis 4000 , Degutting And Removal Of Iff Jat , Degutting And Removal Of Ais Jotron Tr 8000 , Degutting And Removal Of St 1075 And Its Subunits , Degutting And Removal Of Pae M7 Ans Its Subunits , Degutting And Removal Of Sdr-Nc And Its Subunits , Degutting And Removal Of Sdr-Tac And Its Subunits , Degutting And Removal Of Ek 896 And Its Subunits , Degutting And Removal Of Ccs Mk Ii And Its Subunits , Degutting And Removal Of Link Ii And Its Subunits , Degutting And Removal Of Uhf Satcom And Its Subunits , Degutting And Removal Of Sirs And Its Subunits , Degutting And Removal Of Mb/Sre/Intercom/ And Its Subunits , Interphone Rack And Its Subunits , Degutting And Removal Of Hd Vlf Hf Receiver And Its Subunits , Degutting And Removal Of Rukmani Ssst And Its Subunits , Degutting And Removal Of Dmr 16A , Degutting And Removal Of Gps , Degutting And Removal Of Nads-B And Its Subunits , Degutting And Removal Of Fm 8900S (Mmb Set) , Degutting And Removal Of Telephone Exchange , Degutting And Removal Of Gun Mount Ak-630 And Its Subunits , Degutting And Removal Of Gun Mount Ak-176 And Its Subunits , Degutting And Removal Of Fire Control Radar/ Lynx U2 And Its Subunits , Degutting And Removal Of Fire Control Radar/Ssr And Its Subunits , Degutting And Removal Of Srcg Gun Mount And Its Subunits , Degutting And Removal Of Navigational Light Control Panel And Its Subunits , Degutting And Removal Of Battery Charger , Degutting And Removal Of Lead Acid Battery , Degutting And Removal Of Maintenance Free Battery , Requirement Of Tractor And Trailer For Shifting Of Items From Ship To Center For A Probable Duration Of 50 Days (Payment On Actual Days Used) , Requirement Of One Tonner For Shifting Of Items From Ship To Center For A Probable Duration Of 50 Days (Payment On Actual Days Used) , Requirement Of Crane Service With Sling (25T, 20T, 10T, 5T, 2T And 1T) For A Probable Duration Of 50 Days (Payment On Actual Days Used) , Manufacturing Of Cradle/ Foundation Base As Required For Ak 176 (01 Nos) And Ak 630 (02 Nos) , Opening/ Degutting Of Fer Softpatch And Regutting Upon Completion Of De Equipping In Fer , Opening/ Degutting Of Aer Softpatch And Regutting Upon Completion Of De Equipping In Aer
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | REMOVAL PCGT WITH ACCESSORIES | REMOVAL PCGT WITH ACCESSORIES |
| 2 | REMOVAL SCGT WITH ACCESSORIES | REMOVAL SCGT WITH ACCESSORIES |
| 3 | REMOVAL PBGT WITH ACCESSORIES | REMOVAL PBGT WITH ACCESSORIES |
| 4 | REMOVAL SBGT WITH ACCESSORIES | REMOVAL SBGT WITH ACCESSORIES |
| 5 | REMOVAL PCRG WITH ACCESSORIES | REMOVAL PCRG WITH ACCESSORIES |
| 6 | REMOVAL SCRG WITH ACCESSORIES | REMOVAL SCRG WITH ACCESSORIES |
| 7 | REMOVAL PBRG WITH ACCESSORIES | REMOVAL PBRG WITH ACCESSORIES |
| 8 | REMOVAL SBRG WITH ACCESSORIES | REMOVAL SBRG WITH ACCESSORIES |
| 9 | REMOVAL ALL GT’s AND RG’s CONTROL STATION. QTY-06 (CGT-02, BGT-02, CRG-02) | REMOVAL ALL GT’s AND RG’s CONTROL STATION. QTY-06 (CGT-02, BGT-02, CRG-02) |
| 10 | REMOVAL FUEL TRANSFER PUMP | REMOVAL FUEL TRANSFER PUMP |
| 11 | REMOVAL HPAC 1 WITH ACCESSORIES | REMOVAL HPAC 1 WITH ACCESSORIES |
| 12 | REMOVAL HPAC 2 WITH ACCESSORIES | REMOVAL HPAC 2 WITH ACCESSORIES |
| 13 | REMOVAL DA 1 WITH ACCESSORIES | REMOVAL DA 1 WITH ACCESSORIES |
| 14 | REMOVAL DA 2 WITH ACCESSORIES | REMOVAL DA 2 WITH ACCESSORIES |
| 15 | REMOVAL DA 3 WITH ACCESSORIES | REMOVAL DA 3 WITH ACCESSORIES |
| 16 | REMOVAL FIREMAIN STRAINER | REMOVAL FIREMAIN STRAINER |
| 17 | REMOVAL FIREMAIN COMPANSATOR | REMOVAL FIREMAIN COMPANSATOR |
| 18 | REMOVAL BGT EXHAUST DOOR | REMOVAL BGT EXHAUST DOOR |
| 19 | REMOVAL BGT EXHAUST DOOR HYDRAULIC SYSTEM | REMOVAL BGT EXHAUST DOOR HYDRAULIC SYSTEM |
| 20 | REMOVAL PTOG BOTTLE | REMOVAL PTOG BOTTLE |
| 21 | REMOVAL OF GT L/O COOLERS | REMOVAL OF GT L/O COOLERS |
| 22 | REMOVAL OF GT L/O COOLERS | REMOVAL OF GT L/O COOLERS |
| 23 | REMOVAL EDUCTORS | REMOVAL EDUCTORS |
| 24 | REMOVAL STEERING GEAR PP WITH MOTOR AND HYDRAULIC RAM UNIT | REMOVAL STEERING GEAR PP WITH MOTOR AND HYDRAULIC RAM UNIT |
| 25 | REMOVAL CENTRIFUGE | REMOVAL CENTRIFUGE |
| 26 | REMOVAL CCC PANEL | REMOVAL CCC PANEL |
| 27 | REMOVAL ORION PANEL OF ALL 04 GT’s, 02 ORION PANEL OF SCOOP AND ORION PUMP | REMOVAL ORION PANEL OF ALL 04 GT’s, 02 ORION PANEL OF SCOOP AND ORION PUMP |
| 28 | REMOVAL OF RO PLANT WITH ALL ACCESSORIES | REMOVAL OF RO PLANT WITH ALL ACCESSORIES |
| 29 | REMOVAL OF PAC | REMOVAL OF PAC |
| 30 | REMOVAL REF PLANTS | REMOVAL REF PLANTS |
| 31 | REMOVAL HOLD PP | REMOVAL HOLD PP |
| 32 | REMOVAL F/W PP | REMOVAL F/W PP |
| 33 | REMOVAL GALLEY PP | REMOVAL GALLEY PP |
| 34 | REMOVAL FUEL BOOSTER PP FWD | REMOVAL FUEL BOOSTER PP FWD |
| 35 | REMOVAL FUEL BOOSTER PP AFT | REMOVAL FUEL BOOSTER PP AFT |
| 36 | REMOVAL OF ALL HP AIR BOTTLES | REMOVAL OF ALL HP AIR BOTTLES |
| 37 | REMOVAL 9-11 REDUCER | REMOVAL 9-11 REDUCER |
| 38 | REMOVAL 25-30 REDUCER | REMOVAL 25-30 REDUCER |
| 39 | REMOVAL 100-110 REDUCER | REMOVAL 100-110 REDUCER |
| 40 | REMOVAL FIREMAIN PUMPS | REMOVAL FIREMAIN PUMPS |
| 41 | REMOVAL FUEL PRESSURE REGULATOR (RDT-40) | REMOVAL FUEL PRESSURE REGULATOR (RDT-40) |
| 42 | REMOVAL AC COOLING PP | REMOVAL AC COOLING PP |
| 43 | DEGUTTING OF ELECTRO HYDRAULIC CAPSTAN WILL ALL ITS ACCESSORIES | DEGUTTING OF ELECTRO HYDRAULIC CAPSTAN WILL ALL ITS ACCESSORIES |
| 44 | DEGUTTING OF ELECTRO MECHANICAL CAPSTAN WILL ALL ITS ACCESSORIES | DEGUTTING OF ELECTRO MECHANICAL CAPSTAN WILL ALL ITS ACCESSORIES |
| 45 | DEGUTTING AND REMOVAL OF DIESEL ALTERNATOR | DEGUTTING AND REMOVAL OF DIESEL ALTERNATOR |
| 46 | DEGUTTING AND REMOVAL OF SHIPS CONVERTOR 220V 400HZ | DEGUTTING AND REMOVAL OF SHIPS CONVERTOR 220V 400HZ |
| 47 | DEGUTTING AND REMOVAL OF BAKC RECTIFIER (SHIPS RECTIFIER) | DEGUTTING AND REMOVAL OF BAKC RECTIFIER (SHIPS RECTIFIER) |
| 48 | DEGUTTING AND REMOVAL OF BAKC RECTIFIER (SHIPS RECTIFIER) | DEGUTTING AND REMOVAL OF BAKC RECTIFIER (SHIPS RECTIFIER) |
| 49 | DEGUTTING AND REMOVAL OF RECTIFIER FOR GT STARTER | DEGUTTING AND REMOVAL OF RECTIFIER FOR GT STARTER |
| 50 | DEGUTTING AND REMOVAL OF RECTIFIER BAK (E)(P) – 22-28 – 5 PBM MISSILE | DEGUTTING AND REMOVAL OF RECTIFIER BAK (E)(P) – 22-28 – 5 PBM MISSILE |
| 51 | DEGUTTING AND REMOVAL OF ACOS (AUTOMATIC CHANGE OVER SWITCH) | DEGUTTING AND REMOVAL OF ACOS (AUTOMATIC CHANGE OVER SWITCH) |
| 52 | DEGUTTING AND REMOVAL OF DIESEL GENERATOR CONTROL | DEGUTTING AND REMOVAL OF DIESEL GENERATOR CONTROL |
| 53 | DEGUTTING AND REMOVAL OF ORION SYSTEM | DEGUTTING AND REMOVAL OF ORION SYSTEM |
| 54 | DEGUTTING AND REMOVAL OF AMPLIDYNE (AK 176) | DEGUTTING AND REMOVAL OF AMPLIDYNE (AK 176) |
| 55 | DEGUTTING AND REMOVAL OF CONVERTOR ATO--2-400 | DEGUTTING AND REMOVAL OF CONVERTOR ATO--2-400 |
| 56 | DEGUTTING AND REMOVAL OF BAKC RECTIFIER (AK 630) | DEGUTTING AND REMOVAL OF BAKC RECTIFIER (AK 630) |
| 57 | DEGUTTING AND REMOVAL OF CONVERTOR (BAZA) | DEGUTTING AND REMOVAL OF CONVERTOR (BAZA) |
| 58 | DEGUTTING AND REMOVAL OF MOTOR STEERING PUMP | DEGUTTING AND REMOVAL OF MOTOR STEERING PUMP |
| 59 | DEGUTTING AND REMOVAL OF BATTERY CHARGING RECTIFIER | DEGUTTING AND REMOVAL OF BATTERY CHARGING RECTIFIER |
| 60 | DEGUTTING AND REMOVAL OF DEGAUSSING SYSTEM | DEGUTTING AND REMOVAL OF DEGAUSSING SYSTEM |
| 61 | DEGUTTING AND REMOVAL OF MOTOR GT LUBE OIL | DEGUTTING AND REMOVAL OF MOTOR GT LUBE OIL |
| 62 | DEGUTTING AND REMOVAL OF MOTOR (FRESH WATER PUMP) 240 MW-22-11 MS (BATHROOM) | DEGUTTING AND REMOVAL OF MOTOR (FRESH WATER PUMP) 240 MW-22-11 MS (BATHROOM) |
| 63 | DEGUTTING AND REMOVAL OF MOTOR FUEL FEED PUMP 2MDW112 S4 OM5 | DEGUTTING AND REMOVAL OF MOTOR FUEL FEED PUMP 2MDW112 S4 OM5 |
| 64 | DEGUTTING AND REMOVAL OF MOTOR FIRE MAIN (02 IN NOS) | DEGUTTING AND REMOVAL OF MOTOR FIRE MAIN (02 IN NOS) |
| 65 | DEGUTTING AND REMOVAL OF LP SWITCH BOARD APC-231B | DEGUTTING AND REMOVAL OF LP SWITCH BOARD APC-231B |
| 66 | DEGUTTING AND REMOVAL OF SWITCH BOARD APC-231B | DEGUTTING AND REMOVAL OF SWITCH BOARD APC-231B |
| 67 | DEGUTTING AND REMOVAL OF MOTOR VENTILATION 2SMW80 B2 OM5 | DEGUTTING AND REMOVAL OF MOTOR VENTILATION 2SMW80 B2 OM5 |
| 68 | DEGUTTING AND REMOVAL OF CCC PANEL (GT STARTING PANEL) | DEGUTTING AND REMOVAL OF CCC PANEL (GT STARTING PANEL) |
| 69 | DEGUTTING AND REMOVAL OF CONVERTOR FOR DEGAUSSING SYSTEM | DEGUTTING AND REMOVAL OF CONVERTOR FOR DEGAUSSING SYSTEM |
| 70 | DEGUTTING AND REMOVAL OF STATER PP & COOLING PP | DEGUTTING AND REMOVAL OF STATER PP & COOLING PP |
| 71 | DEGUTTING AND REMOVAL OF CONVERTOR GARPUN | DEGUTTING AND REMOVAL OF CONVERTOR GARPUN |
| 72 | DEGUTTING AND REMOVAL OF CONVERTOR FOR FCS COMPUTER (VYMPLE) | DEGUTTING AND REMOVAL OF CONVERTOR FOR FCS COMPUTER (VYMPLE) |
| 73 | DEGUTTING AND REMOVAL OF STARTER FOR F/W PUMP (1.5 KW) | DEGUTTING AND REMOVAL OF STARTER FOR F/W PUMP (1.5 KW) |
| 74 | DEGUTTING AND REMOVAL OF STARTER PANEL REFRIGERATION PLANT | DEGUTTING AND REMOVAL OF STARTER PANEL REFRIGERATION PLANT |
| 75 | DEGUTTING AND REMOVAL OF CAPSTAN CONTROLLER PANEL | DEGUTTING AND REMOVAL OF CAPSTAN CONTROLLER PANEL |
| 76 | DEGUTTING AND REMOVAL OF ICCP M/S SARGAM METALS | DEGUTTING AND REMOVAL OF ICCP M/S SARGAM METALS |
| 77 | DEGUTTING AND REMOVAL OF CAPSTAN MOTOR FWD & AFT AND THEIR SUBUNITS | DEGUTTING AND REMOVAL OF CAPSTAN MOTOR FWD & AFT AND THEIR SUBUNITS |
| 78 | DEGUTTING AND REMOVAL OF ELECTRIC SIREN | DEGUTTING AND REMOVAL OF ELECTRIC SIREN |
| 79 | DEGUTTING AND REMOVAL OF GYRO STD 22M AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF GYRO STD 22M AND ITS SUBUNITS |
| 80 | DEGUTTING AND REMOVAL OF KELTRON EM LOG V2 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF KELTRON EM LOG V2 AND ITS SUBUNITS |
| 81 | DEGUTTING AND REMOVAL OF KELTRON ECHOSOUNDER V3.1 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF KELTRON ECHOSOUNDER V3.1 AND ITS SUBUNITS |
| 82 | DEGUTTING AND REMOVAL OF OTS WSDS | DEGUTTING AND REMOVAL OF OTS WSDS |
| 83 | DEGUTTING AND REMOVAL OF IGTSR | DEGUTTING AND REMOVAL OF IGTSR |
| 84 | DEGUTTING AND REMOVAL OF VISION MASTER | DEGUTTING AND REMOVAL OF VISION MASTER |
| 85 | DEGUTTING AND REMOVAL OF MOD CMS AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF MOD CMS AND ITS SUBUNITS |
| 86 | DEGUTTING AND REMOVAL OF SAURYA (VARUNA LITE) AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF SAURYA (VARUNA LITE) AND ITS SUBUNITS |
| 87 | DEGUTTING AND REMOVAL OF ECDIS 4000 | DEGUTTING AND REMOVAL OF ECDIS 4000 |
| 88 | DEGUTTING AND REMOVAL OF IFF JAT | DEGUTTING AND REMOVAL OF IFF JAT |
| 89 | DEGUTTING AND REMOVAL OF AIS JOTRON TR 8000 | DEGUTTING AND REMOVAL OF AIS JOTRON TR 8000 |
| 90 | DEGUTTING AND REMOVAL OF ST 1075 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF ST 1075 AND ITS SUBUNITS |
| 91 | DEGUTTING AND REMOVAL OF PAE M7 ANS ITS SUBUNITS | DEGUTTING AND REMOVAL OF PAE M7 ANS ITS SUBUNITS |
| 92 | DEGUTTING AND REMOVAL OF SDR-NC AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF SDR-NC AND ITS SUBUNITS |
| 93 | DEGUTTING AND REMOVAL OF SDR-TAC AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF SDR-TAC AND ITS SUBUNITS |
| 94 | DEGUTTING AND REMOVAL OF EK 896 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF EK 896 AND ITS SUBUNITS |
| 95 | DEGUTTING AND REMOVAL OF CCS MK II AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF CCS MK II AND ITS SUBUNITS |
| 96 | DEGUTTING AND REMOVAL OF LINK II AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF LINK II AND ITS SUBUNITS |
| 97 | DEGUTTING AND REMOVAL OF UHF SATCOM AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF UHF SATCOM AND ITS SUBUNITS |
| 98 | DEGUTTING AND REMOVAL OF SIRS AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF SIRS AND ITS SUBUNITS |
| 99 | DEGUTTING AND REMOVAL OF MB/SRE/INTERCOM/ AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF MB/SRE/INTERCOM/ AND ITS SUBUNITS |
| 100 | INTERPHONE RACK AND ITS SUBUNITS | INTERPHONE RACK AND ITS SUBUNITS |
| 101 | DEGUTTING AND REMOVAL OF HD VLF HF RECEIVER AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF HD VLF HF RECEIVER AND ITS SUBUNITS |
| 102 | DEGUTTING AND REMOVAL OF RUKMANI SSST AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF RUKMANI SSST AND ITS SUBUNITS |
| 103 | DEGUTTING AND REMOVAL OF DMR 16A | DEGUTTING AND REMOVAL OF DMR 16A |
| 104 | DEGUTTING AND REMOVAL OF GPS | DEGUTTING AND REMOVAL OF GPS |
| 105 | DEGUTTING AND REMOVAL OF NADS-B AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF NADS-B AND ITS SUBUNITS |
| 106 | DEGUTTING AND REMOVAL OF FM 8900S (MMB SET) | DEGUTTING AND REMOVAL OF FM 8900S (MMB SET) |
| 107 | DEGUTTING AND REMOVAL OF TELEPHONE EXCHANGE | DEGUTTING AND REMOVAL OF TELEPHONE EXCHANGE |
| 108 | DEGUTTING AND REMOVAL OF GUN MOUNT AK-630 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF GUN MOUNT AK-630 AND ITS SUBUNITS |
| 109 | DEGUTTING AND REMOVAL OF GUN MOUNT AK-176 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF GUN MOUNT AK-176 AND ITS SUBUNITS |
| 110 | DEGUTTING AND REMOVAL OF FIRE CONTROL RADAR/ LYNX U2 AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF FIRE CONTROL RADAR/ LYNX U2 AND ITS SUBUNITS |
| 111 | DEGUTTING AND REMOVAL OF FIRE CONTROL RADAR/SSR AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF FIRE CONTROL RADAR/SSR AND ITS SUBUNITS |
| 112 | DEGUTTING AND REMOVAL OF SRCG GUN MOUNT AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF SRCG GUN MOUNT AND ITS SUBUNITS |
| 113 | DEGUTTING AND REMOVAL OF NAVIGATIONAL LIGHT CONTROL PANEL AND ITS SUBUNITS | DEGUTTING AND REMOVAL OF NAVIGATIONAL LIGHT CONTROL PANEL AND ITS SUBUNITS |
| 114 | DEGUTTING AND REMOVAL OF BATTERY CHARGER | DEGUTTING AND REMOVAL OF BATTERY CHARGER |
| 115 | DEGUTTING AND REMOVAL OF LEAD ACID BATTERY | DEGUTTING AND REMOVAL OF LEAD ACID BATTERY |
| 116 | DEGUTTING AND REMOVAL OF MAINTENANCE FREE BATTERY | DEGUTTING AND REMOVAL OF MAINTENANCE FREE BATTERY |
| 117 | REQUIREMENT OF TRACTOR AND TRAILER FOR SHIFTING OF ITEMS FROM SHIP TO CENTER FOR A PROBABLE DURATION OF 50 DAYS (PAYMENT ON ACTUAL DAYS USED) | REQUIREMENT OF TRACTOR AND TRAILER FOR SHIFTING OF ITEMS FROM SHIP TO CENTER FOR A PROBABLE DURATION OF 50 DAYS (PAYMENT ON ACTUAL DAYS USED) |
| 118 | REQUIREMENT OF ONE TONNER FOR SHIFTING OF ITEMS FROM SHIP TO CENTER FOR A PROBABLE DURATION OF 50 DAYS (PAYMENT ON ACTUAL DAYS USED) | REQUIREMENT OF ONE TONNER FOR SHIFTING OF ITEMS FROM SHIP TO CENTER FOR A PROBABLE DURATION OF 50 DAYS (PAYMENT ON ACTUAL DAYS USED) |
| 119 | REQUIREMENT OF CRANE SERVICE WITH SLING (25T, 20T, 10T, 5T, 2T AND 1T) FOR A PROBABLE DURATION OF 50 DAYS (PAYMENT ON ACTUAL DAYS USED) | REQUIREMENT OF CRANE SERVICE WITH SLING (25T, 20T, 10T, 5T, 2T AND 1T) FOR A PROBABLE DURATION OF 50 DAYS (PAYMENT ON ACTUAL DAYS USED) |
| 120 | MANUFACTURING OF CRADLE/ FOUNDATION BASE AS REQUIRED FOR AK 176 (01 NOS) AND AK 630 (02 NOS) | MANUFACTURING OF CRADLE/ FOUNDATION BASE AS REQUIRED FOR AK 176 (01 NOS) AND AK 630 (02 NOS) |
| 121 | OPENING/ DEGUTTING OF FER SOFTPATCH AND REGUTTING UPON COMPLETION OF DE EQUIPPING IN FER | OPENING/ DEGUTTING OF FER SOFTPATCH AND REGUTTING UPON COMPLETION OF DE EQUIPPING IN FER |
| 122 | OPENING/ DEGUTTING OF AER SOFTPATCH AND REGUTTING UPON COMPLETION OF DE EQUIPPING IN AER | OPENING/ DEGUTTING OF AER SOFTPATCH AND REGUTTING UPON COMPLETION OF DE EQUIPPING IN AER |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender