Tender For Dismantle,Transportation & Installation Of Pony Belt Driveheads From D-19 B/G,10Th D/R Jn. To D-20 B/G,9Th D/R Jn Etc In Xvi(T) Seam At Moonidih Colliery, W.J. Area
Tender Overview
Project Description
Tender for Dismantle,Transportation & Installation Of Pony Belt Driveheads From D-19 B/G,10Th D/R Jn. To D-20 B/G,9Th D/R Jn Etc In Xvi(T) Seam At Moonidih Colliery, W.J. Area
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Sep-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 15-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Dismantle,Transportation & Installation of Pony belt driveheads from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn etc in XVI(T) seam at Moonidih Colliery, W.J. Area |
| 2 | Dismantalling of Pony drive head at D-19 B/G,10th D/R Jn. required shift 2 Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift |
| 3 | Manual Transportation of jib drum,gear box,motor of pony drivehead from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn. i.e.(Total Distance=230m) Analysis: 10 unskilled manshift required for manual transportation of one item/60m = Cost/mt/item= 10*1437.6 /60 =Rs.239.60/mt/item Total items=3 no.;Therefore cost/mt=(Rs 239.6 *3)=Rs 718.8/mt |
| 4 | Manual Transportation of Drive frames of pony drivehead from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn. i.e.(Total Distance=230m) required shift 2 Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift |
| 5 | Manual Transportation of starter and starting cable of pony drivehead from D-19 B/G,10th D/R Jn. to D-20 B/G,9th D/R jn. i.e.(Total Distance=230m) required shift 2 Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift |
| 6 | Installation of Pony Drivehead at D-20 B/G,9th D/R jn. required shift 4 Analysis: Unskilled manshift required/shift=8 cost/shift=8*1437.6 =Rs11500.8/shift |
| 7 | Dismantalling of TATA belt drive head at D-19 T/G,10th D/R Jn. required shift 4 Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift |
| 8 | Manual Transportation of base frame of Tata belt drive head from D-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 2 Analysis:unskilled manshift Reqired/shift= 8 unskilled Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift |
| 9 | Manual Transportation of 3 no. of drums(2 drive driven drums,1 discharge drum)of Tata belt drive head fromD-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 3 Analysis: 10 unskilled manshift Reqired/shift= Cost/shift= 10*1437.6 =Rs14376/shift |
| 10 | Manual Transportation of gear box of Tata belt drive head from D-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 1 Analysis 10 unskilled manshift Reqired/shift= Cost/shift= 10*1437.6 =Rs14376/shift |
| 11 | Manual Transportation of Motor of Tata belt drive head from D-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn. transport distance=70m Analysis: 12 unskilled manshift required for manual transportation of motor/35m = Cost/mt= 12*1437.60/35 =Rs.480.89/mt |
| 12 | Manual Transportation of starter and starting cable of Tata belt drive head from D-19 T/G,10th D/R jn. To D-20 B/G,10th D/R Jn.(distance=70m) required shift 1 Analysis: 8 unskilled manshift Reqired/shift= Cost involved= 8*1437.6 =Rs11500.8/shift |
| 13 | Cleaning for installation =25 x 2 x0.3=15 m3 Analysis: 3 unskilled manshift required for cleaning of 4 m3 i.e 3/4x1437.60=Rs1078.2/m3 |
| 14 | Installation of Tata belt drivehead required shift 8 Analysis: 8 unskilled manshift Reqired/shift= Cost/shift= 8*1437.6 =Rs11500.8/shift |
| 15 | Transportation of material for PCC work from surface to D-20 B/G through track and haulages. Analysis:No. of mine car required=2 6 unskilled manshift required X 2 shift /minecar= Cost/minecar= (Rs 1437.6 X 6 X2)=Rs17251.2/minecar |
| 16 | Pcc work for drivehead installation in 1:2:4 (1 cement:2 course sand :4 grade stone aggregate 40mm normal size) for volume 3mX2.75mx0.4m=3.3 m3 |
| 17 | 1)Loading of 400m(1000mm) conveyor belting on 2 flat trollies surface Analysis:Total unskilled manshift requred/shift=12 unskilled 2)Transportation of 400m(1000mm) conveyor belting from 7th D/R jn of 400mh main line to D-18 B/G,10th D/R jn. via track & haulages. Analysis: Manshift required for transportation =6 unskilled manshift/shift/200m.So,for 400m=12 unskilled 3)Laying & fitting of 400m(1000mm) belting on 10th D/R conveyor belt . Analysis:manshift required =14 unskilled/shift/200m. So,For 400m=28 unskilled Final analysis:(12+12+28)=52 unskilled. Cost involved @Rs 1402.6/unskilled |
| 18 | Dismantling of 500m belt structure and Withdrwal of 1000m conveyor belting from D-19 T/G. required shift 8 Analysis:unskilled manshift required/shift=8 cost/shift=8*1437.6 =Rs11500.8/shift t |
| 19 | Transporting,Laying and fitting of 150m belting on conveyor belt in 9th D/R between D-19 T/G to D-20 B/G. required shift 2 Analysis:unskilled manshift required/shift=12 cost/shift=12*1437.6 =Rs17251.2/shift |
| 20 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR |
| 21 | CMPF, Pension and admin. Charge of Employee Un Skilled surface |
| 22 | CMPF, Pension and admin. Charge of Employee Semi-Skilled surface |
| 23 | CMPF, Pension and admin. Charge of Employee Skilled surface |
| 24 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender