Bids Are invited for Custom Bid For Services - ---- - Trenching For Lawn:Trenching In Ordinary Soil Up To A Depth Of 0.50M Including Removal And Stacking Of Serviceable Materials And Then Disposing Of By Spreading And Neatly Levelling With In A Lead
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Trenching For Lawn:Trenching In Ordinary Soil Up To A Depth Of 0.50M Including Removal And Stacking Of Serviceable Materials And Then Disposing Of By Spreading And Neatly Levelling With In A Lead Of 50 M And Making Up The Trenched Area To Proper Levels By Fillingwith Earth Or Earth Mixed With Sludge Or/And Manure Before And After Flooding Trench With Water. , Supply And Stacking Of Good Earth:Supplying And Stacking Of Good Earth At Site Including Royalty And Carriage Up To 1Km (Earth Measured In Stackswill Be Reduced By 20% Ior Payment). , Supply And Stacking Of Organic Manure (Vermicompost) And Flower Beds: Supplying And Stacking Of Vermicompost At Site Including Royalty And Carriage Up To 1 Km (Earth Measured In Stacks Will Be Reduced By 8% For Payment). , Rough Dressing: Rough Dressing The Trenched Ground Including Breaking Clods. , Uprooting Of Weeds: Uprooting Weeds From The Trenched Area After 10 To 15 Days Of Its Flooding With Water Including Disposal Of Uprooted Vegetation. , Fine Dressing: Fine Dressing The Ground , Spreading Of Sludge: Spreading Of Good Earth Inrequired Thickness , Mixing Of Good Earth And Sludge: Mixing Earth And Sludge Or Manure In Proportion Specified Or Directed , Turfing With Bermuda Grass: Grassing With Selection No.1 Grass Including Watering And Maintenance Of The Lawn For 30 Days Or More Till The Grass Forms A Thick Lawn Free From Weeds And Fit For Mowing Including Supplying Good Earth If Needed , Preparation Of Flower Beds ,Shrubberies And Ground Covers Trenching - Preparation Of Beds For Hedging And Shrubbery By Excavating 60Cm Deep And Trenching The Excavated Base To A Further Depth Of 30Cm, Refilling The Excavated Earth After Breaking Clods And Mixing With Sludge Or Manure In The Ratio Of 8:L (8Parts Of Stacked Volume Of Earth After Redu Ctronby 20O/. One Part Of Stacked Volume Of Sludge Or Manure After Reduction By 8%), Flooding With Water, Filling With Earth Necessary, Watering And Finally Fiine Dressing Levelling Etc. Including Stacking And Disposal Of Materials Declared Unserviceable And Surplus Earth By Spreading And Levelling As Directed, Within A [Ead Of 50M Complete (Cost Of Sludge, Manure Or Extra Earth To Be Paid For Necessary Trenching:- Preparation Of Beds For Hedging And Shrubbery By Excavating 60Cm Deep And Trenching The Excavated Base To A Further Depth Of 30Cm, Refilling The Excavated Earth After Breaking Clods And Mixing With Sludge Or Manure In The Ratio Of 8:1 (Sparts Of Stacked Volume Ofearth Ajter Reduction By 20% One Part Of Stacked Volume Of Sludge Or Manure After Reduction By 8%), Flooding With Water, Filling With Earth Necessary, Watering And Finally Fine Dressing, Levelling Etc., Including Stacking And Disposal Of Materials Declared Unservicible And Surplus Earth By Spreading And Levelling As Directed, Within A Lead Of 50M Lift Upto 1.5M Complete , Supply And Stacking Of Good Earth For Flower Beds And Ground Covers, Hedges : Supplying And Stacking Of Good Earth At Site Including Royalty And Carriage Up To 1 Km (Earth Measured In Stacks Will Be Reduced By 20/O Lor Payment) 8:1 Ratio , Jungle Clearance Of Area Around The Temple Towards Left Side, Right Side And Behind The Temple:Clearing Jungle Including Uprooting Of Rank Vegetatiory Grass, Brush Wood, Trees And Saplings Of Girth Up To 30 Cm ,Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Up To A Distance O{ 50 M Outside The Periphery Of The Area Cleared.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Trenching for lawn:Trenching in ordinary soil up to a depth of 0.50m including removal and stacking of serviceable materials and then disposing of by spreading and neatly levelling with in a lead of 50 m and making up the trenched area to proper levels by fillingwith earth or earth mixed with sludge or/and manure before and after flooding trench with water. | Trenching for lawn:Trenching in ordinary soil up to a depth of 0.50m including removal and stacking of serviceable materials and then disposing of by spreading and neatly levelling with in a lead of 50 m and making up the trenched area to proper levels by fillingwith earth or earth mixed with sludge or/and manure before and after flooding trench with water. |
| 2 | Supply and stacking of good earth:Supplying and stacking of good earth at site including royalty and carriage up to 1km (earth measured in stackswill be reduced by 20% Ior payment). | Supply and stacking of good earth:Supplying and stacking of good earth at site including royalty and carriage up to 1km (earth measured in stackswill be reduced by 20% Ior payment). |
| 3 | Supply and stacking of organic manure (vermicompost) and flower beds: Supplying and stacking of vermicompost at site including royalty and carriage up to 1 km (earth measured in stacks will be reduced by 8% for payment). | Supply and stacking of organic manure (vermicompost) and flower beds: Supplying and stacking of vermicompost at site including royalty and carriage up to 1 km (earth measured in stacks will be reduced by 8% for payment). |
| 4 | Rough dressing: Rough dressing the trenched ground including breaking clods. | Rough dressing: Rough dressing the trenched ground including breaking clods. |
| 5 | Uprooting of weeds: Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. | Uprooting of weeds: Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. |
| 6 | Fine dressing: Fine dressing the ground | Fine dressing: Fine dressing the ground |
| 7 | Spreading of sludge: Spreading of good earth inrequired thickness | Spreading of sludge: Spreading of good earth inrequired thickness |
| 8 | Mixing of good earth and sludge: Mixing earth and sludge or manure in proportion specified or directed | Mixing of good earth and sludge: Mixing earth and sludge or manure in proportion specified or directed |
| 9 | Turfing with Bermuda grass: Grassing with selection no.1 grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for mowing including supplying good earth if needed | Turfing with Bermuda grass: Grassing with selection no.1 grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for mowing including supplying good earth if needed |
| 10 | Preparation of flower beds ,shrubberies and ground covers Trenching - Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:l (8parts of stacked volume of earth after redu ctronby 20o/. one part of stacked volume of sludge or manure after reduction by 8%), Flooding with water, filling with earth necessary, watering and finally fiine dressing levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a [ead of 50m complete (Cost of sludge, manure or extra earth to be paid for necessary Trenching:- Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (Sparts of stacked volume ofearth aJter reduction by 20% one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth necessary, watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unservicible and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete | Preparation of flower beds ,shrubberies and ground covers Trenching - Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:l (8parts of stacked volume of earth after redu ctronby 20o/. one part of stacked volume of sludge or manure after reduction by 8%), Flooding with water, filling with earth necessary, watering and finally fiine dressing levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a [ead of 50m complete (Cost of sludge, manure or extra earth to be paid for necessary Trenching:- Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (Sparts of stacked volume ofearth aJter reduction by 20% one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth necessary, watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unservicible and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete |
| 11 | Supply and stacking of good earth for flower beds and ground covers, hedges : Supplying and stacking of good earth at site including royalty and carriage up to 1 km (earth measured in stacks will be reduced by 20\\"/o lor payment) 8:1 ratio | Supply and stacking of good earth for flower beds and ground covers, hedges : Supplying and stacking of good earth at site including royalty and carriage up to 1 km (earth measured in stacks will be reduced by 20\\"/o lor payment) 8:1 ratio |
| 12 | Jungle clearance of area around the temple towards left side, right side and behind the temple:Clearing jungle including uprooting of rank vegetatiory grass, brush wood, trees and saplings of girth up to 30 cm ,measured at a height of 1 m above ground level and Removal of rubbish up to a distance o{ 50 m outside the periphery of the area cleared. | Jungle clearance of area around the temple towards left side, right side and behind the temple:Clearing jungle including uprooting of rank vegetatiory grass, brush wood, trees and saplings of girth up to 30 cm ,measured at a height of 1 m above ground level and Removal of rubbish up to a distance o{ 50 m outside the periphery of the area cleared. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender