Supply Of Supply, installation and commissioning of IPS (LC gate) etc.
Tender Overview
Project Description
Supply Of supply, installation and commissioning of ips (lc gate) etc. , supply, installation, testing and commissioning of smps based integrated power supply (ips) as per rdso specification no. rdso/spn/165/2023 version 4.0 amdt. 1 as per attached annexure with 200 ah lmla battery. [ warranty period: 30 months after the date of delivery ] ] , supply, installation, testing & commissioning of smps based integrated power supply system (ips) for interlocked lc gate in re area confirming on rdso spec. no. rdso/spn/165/2023 version 4.0 am endment 1.0 date effective 20 06 2024 or latest amendment up to the tender opening date along with 200 ah lmla battery as per rdso spec. no: irs:s-88/2004. [ warranty period: 30 months after the date of d elivery ] ] , supply, installation and commissioning of smps based ips system for lc gate 110v/200ah/ 500va as per rdso/spn/165/2023 version 4.0 with amendment- i including low maintenance secondary cel l 200ah as per specification no 88/2004. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply, Installation, Testing and commissioning of SMPS based Integrated Power Supply (IPS) as per RDSO specification No. RDSO/SPN/165/2023 Version 4.0 Amdt. 1 as per attached Annexure with 200 AH LMLA Battery. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Supply, Installation, Testing & commissioning of SMPS based integrated power supply system (IPS) for Interlocked LC Gate in RE area confirming on RDSO Spec. No. RDSO/SPN/165/2023 version 4.0 Am endment 1.0 date effective 20 06 2024 or latest amendment up to the tender opening date along with 200 AH LMLA Battery as per RDSO Spec. No: IRS:S-88/2004. [ Warranty Period: 30 Months after the date of d elivery ] ] |
| 3 | Supply, installation and commissioning of SMPS based IPS System for LC GATE 110V/200AH/ 500VA as per RDSO/SPN/165/2023 version 4.0 with Amendment- I including low maintenance secondary cel l 200AH as per specification no 88/2004. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender