Power Government Departments Closing in 7 days TDR #57290629

Tender For System Automation Works Under World Bank

Issued by Government Departments · Shimla, Himachal Pradesh
Tender Value
75 Crore
Estimated cost
Bid Submission
21 Sep 2026
7 days left
EMD
1.50 Crore
Bank guarantee accepted
Document Fee
1475
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Shimla → Himachal Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For System Automation Works Under World Bank

BOQ

Name of Work:-
Sl. No. Item Description
1\\"ANNEXURE-I\\":- Abstract of Cost (Supply Part) in respect of Package-4 (System Automation Works) proposed under World Bank funded \\"Himachal Pradesh Power Sector Development Program (HPPSDP)\\" Sr. No. Scope of Work Unit Quantity Ex-Work Supply per unit Rate (in ₹) Per Unit Freight and Insurance (in ₹) Sub Total (Ex-Works Supply + F&I) (In ₹) GST@18% Total Supply Part Ex-Work Erection per unit Rate (in ₹) GST@18% Total Erection Cost (in ₹) Total project Cost (in ₹) 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 A Supply Part 1.0 33 kV Control & Relay Protection (CRP) Panel for 33/11 kV Power Transformer, complete with numerical Bay Control & Protection Unit (BCPU) having transformer differential, non-directional overcurrent & earth-fault, overfluxing, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Master Trip/Lockout Relay and Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with fibre-optic/Ethernet communication interfaces, requisite communication/interface modules, internal wiring, terminals and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the CRP Panel, complete in all respects as per the Technical Specifications. No. 7.0 0.0 0.0 0.0 0.0 2.0 33 kV Control & Relay Protection (CRP) Panel for Feeder, complete with numerical Bay Control & Protection Unit (BCPU) having bi-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with fibre-optic/Ethernet communication interfaces, requisite communication/interface modules, internal wiring, terminals and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the CRP Panel, complete in all respects as per the Technical Specifications. No. 4.0 0.0 0.0 0.0 0.0 3.0 11 kV Indoor Switchgear Incomer Panel, suitable for 2000 A continuous current rating and 25 kA for 3 seconds fault level, indoor metal-clad draw-out type VCB panel, complete with busbar, CTs of dual ratio 1200-600/1-1-1-1 A, 4-core and PT of ratio 11 kV/√3/110 V/√3; numerical Bay Control & Protection Unit (BCPU) having restricted earth-fault (REF), non-directional overcurrent & earth-fault, under/over-voltage, under/over-frequency, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Master Trip/Lockout Relay and Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, communication/interface modules, internal wiring, busbar transition/coupling arrangement required for matching and connection with the retained existing switchgear, wherever required, and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the panel, complete in all respects as per the Technical Specifications. No. 10.0 0.0 0.0 0.0 0.0 4.0 11 kV Indoor Switchgear Incomer Panel, suitable for 1250 A continuous current rating and 25 kA for 3 seconds fault level, indoor metal-clad draw-out type VCB panel, complete with busbar, CTs of dual ratio 800-400/1-1-1-1 A, 4-core and PT of ratio 11 kV/√3/110 V/√3; numerical Bay Control & Protection Unit (BCPU) having restricted earth-fault (REF), non-directional overcurrent & earth-fault, under/over-voltage, under/over-frequency, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Master Trip/Lockout Relay and Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, communication/interface modules, internal wiring, busbar transition/coupling arrangement required for matching and connection with the retained existing switchgear, wherever required, and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the panel, complete in all respects as per the Technical Specifications. No. 6.0 0.0 0.0 0.0 0.0 5.0 11 kV Indoor Switchgear Bus-Coupler Panel, suitable for 2000 A continuous current rating and 25 kA for 3 seconds fault level, indoor metal-clad draw-out type VCB panel, complete with busbar and CTs of dual ratio 1200-600/1-1-1-1 A, 4-core; numerical Bay Control & Protection Unit (BCPU) having non-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Master Trip/Lockout Relay and Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation, interlocking and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, communication/interface modules, internal wiring, busbar transition/coupling arrangement required for matching and connection with the retained existing switchgear, wherever required, and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the panel, complete in all respects as per the Technical Specifications. No. 6.0 0.0 0.0 0.0 0.0 6.0 11 kV Indoor Switchgear Bus-Coupler Panel, suitable for 1250 A continuous current rating and 25 kA for 3 seconds fault level, indoor metal-clad draw-out type VCB panel, complete with busbar and CTs of dual ratio 800-400/1-1-1-1 A, 4-core; numerical Bay Control & Protection Unit (BCPU) having non-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Master Trip/Lockout Relay and Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation, interlocking and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, communication/interface modules, internal wiring, busbar transition/coupling arrangement required for matching and connection with the retained existing switchgear, wherever required, and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the panel, complete in all respects as per the Technical Specifications. No. 3.0 0.0 0.0 0.0 0.0 7.0 11 kV Indoor Switchgear Feeder Panel, suitable for 1250 A continuous current rating and 25 kA for 3 seconds fault level, indoor metal-clad draw-out type VCB panel, complete with busbar and CTs of dual ratio 400-200/1-1-1 A, 3-core; numerical Bay Control & Protection Unit (BCPU) having bi-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; separate Master Trip/Lockout Relay and Trip Circuit Supervision Relay; Multifunction Meter (MFM) of Class 0.2 and Trivector Energy Meter of accuracy class 0.2s and provided with communication port/Ethernet connectivity; together with requisite tripping, indication, annunciation, interlocking and Local/Remote control provisions; IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, communication/interface modules, internal wiring, busbar transition/coupling arrangement required for matching and connection with the retained existing switchgear, wherever required, and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete protection, control, metering, interfacing, integration with the RTU System and functional operation of the panel, complete in all respects as per the Technical Specifications. No. 90.0 0.0 0.0 0.0 0.0 8.0 Numerical Bay Control & Protection Unit (BCPU) for 33/11 kV Power Transformer – 33 kV HV Side, having transformer differential, non-directional overcurrent & earth-fault, overfluxing, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; with IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, including requisite communication/interface modules, interface/termination materials and all associated materials, components, accessories and consumables required for complete interfacing with the existing protection, tripping and control scheme, integration with the RTU System and functional operation of the BCPU, complete in all respects as per the Technical Specifications. No. 10.0 0.0 0.0 0.0 0.0 9.0 Numerical Bay Control & Protection Unit (BCPU) for 33/11 kV Power Transformer – 11 kV LV Side, having restricted earth-fault (REF), non-directional overcurrent & earth-fault, under/over-voltage, under/over-frequency, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; with IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, including requisite communication/interface modules, interface/termination materials and all associated materials, components, accessories and consumables required for complete interfacing with the existing protection, tripping and control scheme, integration with the RTU System and functional operation of the BCPU, complete in all respects as per the Technical Specifications. No. 4.0 0.0 0.0 0.0 0.0 10.0 Numerical Bay Control & Protection Unit (BCPU) for 11/0.415 kV Station Transformer – 11 kV HV Side, having non-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; with IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, including requisite communication/interface modules, interface/termination materials and all associated materials, components, accessories and consumables required for complete interfacing with the existing protection, tripping and control scheme, integration with the RTU System and functional operation of the BCPU, complete in all respects as per the Technical Specifications. No. 2.0 0.0 0.0 0.0 0.0 11.0 Numerical Bay Control & Protection Unit (BCPU) for 33 kV & 11 kV Feeder Panels, having bi-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; with IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, including requisite communication/interface modules, interface/termination materials and all associated materials, components, accessories and consumables required for complete interfacing with the existing protection, tripping and control scheme, integration with the RTU System and functional operation of the BCPU, complete in all respects as per the Technical Specifications. No. 91.0 0.0 0.0 0.0 0.0 12.0 Numerical Bay Control & Protection Unit (BCPU) for 33 kV & 11 kV Bus-Coupler Panels, having non-directional overcurrent & earth-fault, LBB/circuit-breaker failure and other requisite protection, control, interlocking, supervision, monitoring and event/fault recording functions; with IEC 61850 and IEC 60870-5-104 communication capability, as applicable, with requisite fibre-optic/Ethernet communication interfaces, including requisite communication/interface modules, interface/termination materials and all associated materials, components, accessories and consumables required for complete interfacing with the existing protection, tripping and control scheme, integration with the RTU System and functional operation of the BCPU, complete in all respects as per the Technical Specifications. No. 5.0 0.0 0.0 0.0 0.0 13.0 30 V, 100 Ah Battery Bank with Battery Charger for 33 kV Substation applications, comprising 15 Nos. 2 V, 100 Ah SMF-VRLA stationary battery cells with complete battery rack/stand and industrial-grade automatic Float-cum-Boost Battery Charger of minimum 25 A continuous output rating, complete with protection devices, inter-cell/inter-tier connectors, interconnecting cables, terminals and accessories, suitable for continuous supply to associated protection, control and automation equipment; including the entire requirement of DC cables, terminations, protection and interconnection materials required for interfacing with the existing DC distribution system and for providing DC supply to the associated RTU and other applicable substation automation/communication equipment, together with all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the Battery Bank and Charger System, complete in all respects as per the Technical Specifications. No. 9.0 0.0 0.0 0.0 0.0 14.0 11 kV, 630 A, 4-Way Ring Main Unit (RMU), motorized and suitable for remote monitoring and control, complete with FRTU, battery and battery charger system, required protection, control, indication, metering and interlocking functions, as applicable, with communication capability supporting IEC 60870-5-104 (IEC-104) and requisite interface for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to therespective Town SCADA Monitoring Station; including required internal/external wiring, communication/interface and termination materials, mounting hardware and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the RMU System, complete in all respects as per the Technical Specifications. No. 9.0 0.0 0.0 0.0 0.0 15.0 11 kV, 630 A, 5-Way Ring Main Unit (RMU), motorized and suitable for remote monitoring and control, complete with FRTU, battery and battery charger system, required protection, control, indication, metering and interlocking functions, as applicable, with communication capability supporting IEC 60870-5-104 (IEC-104) and requisite interface for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; including required internal/external wiring, communication/interface and termination materials, mounting hardware and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the RMU System, complete in all respects as per the Technical Specifications. No. 3.0 0.0 0.0 0.0 0.0 16.0 11 kV Load Break Switch (LBS) with inbuilt Fault Passage Indicator (FPI) function, suitable for fault detection, indication, remote monitoring and control, with associated controller having communication capability supporting IEC 60870-5-104 (IEC-104) and requisite interface for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; including required operating mechanism, sensors/indicating devices, power supply arrangement, mounting hardware, control and communication wiring, interface/termination materials and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the LBS System, complete in all respects as per the Technical Specifications. No. 401.0 0.0 0.0 0.0 0.0 17.0 11 kV Sectionalizer complete with both-side CVTs, inbuilt CTs and associated controller, suitable for automatic sectionalizing, remote monitoring and control, with communication capability supporting IEC 60870-5-104 (IEC-104) and requisite interface for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; including required operating mechanism, protection/control and power supply arrangement, mounting hardware, control and communication wiring, interface/termination materials and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the Sectionalizer System, complete in all respects as per the Technical Specifications.. No. 137.0 0.0 0.0 0.0 0.0 18.0 11 kV Auto-Recloser (VCB based), suitable for single/double pole mounting, complete with associated controller and required protection, automatic reclosing, monitoring and control functions, with communication capability supporting IEC 60870-5-104 (IEC-104) and requisite interface for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; including required operating mechanism, sensing/protection and power supply arrangement, mounting hardware, control and communication wiring, interface/termination materials and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the Auto-Recloser System, complete in all respects as per the Technical Specifications. No. 15.0 0.0 0.0 0.0 0.0 19.0 Distribution Transformer Monitoring Unit (DTMU) for 400/630 kVA Distribution Transformers, comprising industrial-grade monitoring/controller unit with requisite LT CTs and sensors for monitoring of voltage, current, power, power factor, energy, loading, unbalance, harmonics/power quality, top-oil temperature and oil-level status, with data logging, configurable alarms/events and IEC 60870-5-104 (IEC-104) communication capability for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station.The DTMU shall be supplied complete with requisite sensors, auxiliary power arrangement, surge protection, wiring, communication/interface and mounting accessories, including necessary software/firmware and configuration tools with no mandatory cloud dependency or recurring licence/subscription charges, and OEM support and compatible spares for a minimum period of 10 years, together with all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the DTMU, complete in all respects as per the Technical Specifications. No. 521.0 0.0 0.0 0.0 0.0 20.0 11 kV Smart Fault Passage Indicator (FPI) System comprising 3 Nos. FPIs and 1 No. FPI Controller/Data Concentrator Unit, suitable for fault detection, indication and remote monitoring, with communication capability supporting IEC 60870-5-104 (IEC-104) and requisite interface for connectivity through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; including required power supply arrangement, mounting hardware, wiring, communication/interface and termination materials, accessories and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the FPI System, complete in all respects as per the Technical Specifications. No. 49.0 0.0 0.0 0.0 0.0 21.0 Industrial-Grade 5G/4G Dual-SIM Cellular Modem for secure and reliable bidirectional static-IP based communication between the associated field SCADA Enabler/controller and the respective Town SCADA Monitoring Station, supporting 5G NR and 4G/LTE with automatic SIM/network failover, Ethernet and requisite serial communication interfaces, TCP/IP networking and communication security features, suitable for transparent transmission of IEC 60870-5-104 (IEC-104) and other applicable SCADA data and control commands.The Modem shall be supplied complete with external antenna(s) with mounting arrangement, compatible power supply, surge protection, requisite communication cables/connectors, mounting and interface/termination materials, excluding SIM cards and associated telecom/static-IP services, to be arranged separately by HPSEBL, and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the Modem, complete in all respects as per the Technical Specifications. No. 1135.0 0.0 0.0 0.0 0.0 22.0 Remote Terminal Unit (RTU) System comprising latest proven industrial-grade, multi-master capable RTU with redundant CPU, redundant power supply, required I/O modules, industrial-grade networking components, embedded SCADA communication software, required licences, Layer-II industrial Ethernet switch and communication interfaces, supporting IEC 60870-5-101/104 and IEC 61850, for acquisition, processing, monitoring and control of DI/AI/DO signals and integration with field devices and substation equipment, including HDRs, CMRs and MFMs, as applicable, in accordance with the station-wise/bay-wise Input/Output List of New Proposed RTUs under Annexure-16 of Volume-2, Part-II, Section-6C; suitable for communication of RTU data to the respective Town SCADA Monitoring Station for local monitoring and independently towards MCC/BCC through the SDH Communication System, with requisite communication interfaces and provision for data/control-point addressing, mapping and communication configuration required for subsequent integration at MCC/BCC.Each RTU System shall be supplied as a complete composite unit for the respective substation, including the entire requirement of control cables, LAN/Ethernet cables, communication cables, interface/termination/connectivity materials and associated accessories corresponding to the station-wise/bay-wise configuration and I/O requirements specified in Annexure-16, including connectivity up to the respective Town SCADA Monitoring Station and SDH Communication System/designated communication interface, as applicable. Any increase or decrease in the quantities of such associated cables, interfaces, connectivity materials and accessories required for complete implementation of the specified RTU System shall remain within the scope of the Bidder, together with all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete and functional operation of the RTU System, complete in all respects as per the Technical Specifications. No. 23.0 0.0 0.0 0.0 0.0 23.0 Contact Multiplying Relay (CMR), industrial grade and suitable for multiplication, isolation and extension of status, alarm, indication and other auxiliary contacts for RTU/SCADA applications, compatible with RTU digital input/output interfaces, with suitable coil rating and requisite number and rating of auxiliary contacts; including required mounting, wiring, interface and termination materials and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete interfacing and functional operation of the CMR with the RTU System, complete in all respects as per the Technical Specifications. No. 2012.0 0.0 0.0 0.0 0.0 24.0 Heavy Duty Relay (HDR), industrial grade and suitable as an interposing relay for RTU/SCADA-based remote operation of circuit breakers, isolators and other applicable switching equipment, compatible with RTU digital output interfaces, with suitable coil rating, adequate contact rating for the intended control duty and requisite auxiliary contacts; including required mounting, wiring, interface and termination materials and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete interfacing and functional operation of the HDR with the RTU System and associated switching equipment, complete in all respects as per the Technical Specifications. No. 1280.0 0.0 0.0 0.0 0.0 25.0 Communicable Multifunction Meter (MFM), Class 0.2 accuracy, complete with associated CTs of suitable ratio, accuracy class and burden for the respective 11 kV panel/application, suitable for measurement and monitoring of applicable electrical and energy parameters and integration with the RTU System, with RS-485/Ethernet communication interface supporting Modbus and/or other applicable standard communication protocol; including required wiring, communication/interface and termination materials, mounting accessories and all other materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete interfacing and functional operation of the MFM with the RTU System, complete in all respects as per the Technical Specifications. No. 339.0 0.0 0.0 0.0 0.0 26.0 SCADA Monitoring Station as a complete, fully integrated industrial-grade Supervisory Control and Data Acquisition (SCADA) System for acquisition, concentration, processing, monitoring, event/alarm management, reporting, power-quality analysis and local display of data from the SCADA Enablers and new/existing RTUs associated with the respective Town, with control functionality available but disabled at Town level, and provision for making the requisite data/control points available for subsequent integration at MCC/BCC. The system shall be suitable for continuous 24×7 utility operation and shall comprise industrial-grade SCADA Server, Operator Workstation (OWS) with 24-inch LED display, SCADA application/database and storage system, requisite communication interfaces, software/licences, industrial-grade Next-Generation Firewall (NGFW), industrial Ethernet switch(es), 1 No. network printer and Online UPS System of suitable capacity and backup.Each SCADA Monitoring Station shall be supplied as a complete composite system for the respective Town, including requisite communication/interface and protocol-conversion modules, networking, power-supply arrangements, cabling, rack/mounting arrangements, interface/termination/connectivity materials and all associated materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete functional operation of the system, complete in all respects as per the Technical Specifications and the proposed data-flow architecture specified in Volume-II, Part-II, Section 6C(2), Annexure-17 – “Proposed Data Flow from SCADA Enablers and RTUs to Town SCADA/MCC/BCC for Thirteen (13) Towns.” No. 13.0 0.0 0.0 0.0 0.0 27.0 SDH Communication System (STM-4, extendable up to STM-16, with Multi-Add Drop Multiplexer (MADM) supporting up to 3 MSP-protected directions) comprising complete base equipment including common cards, cross-connect/control cards, optical interface/base cards, power supply cards, power cabling, sub-rack/chassis, tributary and Ethernet interface cards, DDF, and all other cards, modules and hardware required for the specified configuration and functionality; including SDH & Digital Protection Coupler Cabinet complete with MCBs, internal wiring, thimbles, cable clamps, ferrules and associated hardware and accessories, together with all other materials, components, accessories and consumables required for complete installation, integration and functional operation of the SDH Communication System, whether specifically mentioned herein or otherwise required for completion of the work, all complete as per the Technical Specifications. No. 21.0 0.0 0.0 0.0 0.0 28.0 Portable Diagnostic PC-based RTU Configuration, Protocol Simulation, Monitoring and Testing Kit for IEC 61850 and IEC 60870-5-104, comprising a compact suitcase-type industrial-grade workstation (Laptop) with preloaded and licensed software tools for RTU Database Configuration & Maintenance, Master Station-cum-RTU Simulation, Protocol Analysis, Communication Diagnostics, Monitoring and Testing, suitable for SCADA Monitoring Station, RTU and Protection System testing applications. The kit shall include RTU Database Configuration & Maintenance Software Tool, Master Station-cum-RTU Simulator & Protocol Analyser Software Tool, necessary communication and interfacing hardware, patch cords, connectors, power supply arrangements, and all essential accessories, utilities, licences and configuration tools, complete in all respects as per the Technical Specifications. No. 3.0 0.0 0.0 0.0 0.0 29.0 Optical Fibre Cable (OFC) – 24 Fibre ADSS for establishing complete end-to-end fibre optic communication links between existing EHV Substations having fibre optic network and 33 kV Grid Sub-Stations (GSS), and/or between 33 kV GSSs, as indicated in the respective Town-wise Fibre Optic Network Diagrams included in Volume-2, Part-II, Section-6C: Drawings, suitable for overhead installation on existing utility poles/towers, including 24 Fibre ADSS Optical Fibre Cable, 24 Fibre optical fibre approach cable, optical fibre joint closures, FODPs, patch cords, pigtails, connectors/adaptors, splicing and termination materials, suspension/tension hardware fittings, clamps, cable protection and identification accessories, and all other associated materials, components, accessories, fittings and consumables, whether specifically mentioned herein or otherwise required, which, except for the components separately quantified below, shall form an integral part of the complete scope of the item for complete, satisfactory and functional establishment of the fibre optic links up to the existing SDH Communication System and end-to-end fibre connectivity, complete in all respects as per the Technical Specifications 0.0 0.0 0.0 0.0 a) 24 Fibre ADSS Optical Fibre Cable KM 157.95 0.0 0.0 0.0 0.0 b) 24 Fibre Optical Fibre Approach Cable KM 2.65 0.0 0.0 0.0 0.0 c) 24 Fibre Optical Fibre Joint Closure, suitable for straight-through, mid-span access and/or branch jointing, wherever required as per site-specific requirements, complete No. 94.0 0.0 0.0 0.0 0.0 d) 24 Fibre Fibre Optic Distribution Panel (FODP), complete No. 27.0 0.0 0.0 0.0 0.0 d) 96 Fibre Fibre Optic Distribution Panel (FODP), complete No. 4.0 0.0 0.0 0.0 0.0 30.0 Training Centre Setup at MCC Hamirpur comprising 1 No. each of full-scale functional 11 kV Ring Main Unit (RMU), Auto Recloser, Load Break Switch (LBS), Fault Passage Indicator (FPI), RTU and Local SCADA Control & Monitoring System, suitably interconnected and configured as a realistic and interactive training, simulation and demonstration platform for Distribution Automation (DA), including operation, monitoring and control, sectionalizing and network reconfiguration, feeder transfer/load-balancing, automation sequences and control logic, fault simulation and analysis, protection-device training, alarm/event management, and RTU/field-device configuration and troubleshooting, without affecting the live distribution network.The complete Training Centre Setup shall include requisite SCADA/simulation and configuration software with licences, diagnostic/testing tools, communication interfaces, networking equipment, wiring/interconnection and termination arrangements, supporting IEC 60870-5-104 and IEC 61850, as applicable to the respective equipment/interfaces, together with all associated hardware, software, materials, components, accessories and consumables, whether specifically mentioned herein or otherwise required for complete installation and functional operation of the Training Centre Setup, complete in all respects as per the Technical Specifications. Set 1.0 0.0 0.0 0.0 0.0 B Service Part 0.0 1.0 Dismantling of existing/old 33 kV Control & Relay Protection (CRP) Panel for 33/11 kV Power Transformer and installation, erection, alignment, testing, commissioning and integration of the new CRP Panel, including safe isolation and disconnection of existing power/control/CT/PT/trip/close/alarm/annunciation/communication circuits; shifting and disposal/stacking of dismantled panel at the designated location; positioning and fixing of the new panel; modification/extension of foundation/base frame, cable entry and associated panel interfaces, wherever required; termination, ferruling and point-to-point checking of all control, protection, metering, auxiliary and communication wiring; configuration, testing and functional verification of BCPU, Master Trip/Lockout Relay, Trip Circuit Supervision Relay, MFM, Trivector Energy Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; protection/control logic, interlocks, trip/close circuits, alarms, indications, metering and end-to-end functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the CRP Panel, complete in all respects. Job 7.0 0.0 0.0 0.0 2.0 Dismantling of existing/old 33 kV Control & Relay Protection (CRP) Panel for Feeder and installation, erection, alignment, testing, commissioning and integration of the new CRP Panel, including safe isolation and disconnection of existing control/protection/metering/trip/close/alarm/annunciation/communication circuits; shifting and disposal/stacking of dismantled panel at the designated location; positioning and fixing of the new panel; modification/extension of foundation/base frame, cable entry and associated panel interfaces, wherever required; termination, ferruling and point-to-point checking of all control, protection, metering, auxiliary and communication wiring; configuration, testing and functional verification of BCPU, Trip Circuit Supervision Relay, MFM, Trivector Energy Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; protection/control logic, interlocks, trip/close circuits, alarms, indications, metering and end-to-end functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the CRP Panel, complete in all respects. Job 4.0 0.0 0.0 0.0 3.0 Dismantling of existing/old 11 kV Indoor Switchgear Incomer Panel and installation, erection, alignment, testing, commissioning and integration of the new 2000 A Incomer Panel, including safe isolation; disconnection and reconnection of busbars, power/control cables, CT/PT, protection, metering, trip/close, interlocking, alarm and communication circuits; shifting/stacking of dismantled panel; modification/extension of foundation, base frame, busbar transition/coupling and cable-entry arrangements, wherever required; termination and point-to-point checking; configuration and testing of protection/BCPU, MFM/Trivector Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; breaker operation, interlocks, protection, metering and complete functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the panel, complete in all respects. Job 10.0 0.0 0.0 0.0 4.0 Dismantling of existing/old 11 kV Indoor Switchgear Incomer Panel and installation, erection, alignment, testing, commissioning and integration of the new 1250 A Incomer Panel, including safe isolation; disconnection and reconnection of busbars, power/control cables, CT/PT, protection, metering, trip/close, interlocking, alarm and communication circuits; shifting/stacking of dismantled panel; modification/extension of foundation, base frame, busbar transition/coupling and cable-entry arrangements, wherever required; termination and point-to-point checking; configuration and testing of protection/BCPU, MFM/Trivector Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; breaker operation, interlocks, protection, metering and complete functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the panel, complete in all respects. Job 6.0 0.0 0.0 0.0 5.0 Dismantling of existing/old 11 kV Indoor Switchgear Bus-Coupler Panel and installation, erection, alignment, testing, commissioning and integration of the new 2000 A Bus-Coupler Panel, including safe isolation; disconnection and reconnection of busbars, power/control cables, CT/PT, protection, metering, trip/close, interlocking, alarm and communication circuits; shifting/stacking of dismantled panel; modification/extension of foundation, base frame, busbar transition/coupling and cable-entry arrangements, wherever required; termination and point-to-point checking; configuration and testing of protection/BCPU, MFM/Trivector Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; breaker operation, bus-coupler interlocks, protection, metering and complete functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the panel, complete in all respects. Job 6.0 0.0 0.0 0.0 6.0 Dismantling of existing/old 11 kV Indoor Switchgear Bus-Coupler Panel and installation, erection, alignment, testing, commissioning and integration of the new 1250 A Bus-Coupler Panel, including safe isolation; disconnection and reconnection of busbars, power/control cables, CT/PT, protection, metering, trip/close, interlocking, alarm and communication circuits; shifting/stacking of dismantled panel; modification/extension of foundation, base frame, busbar transition/coupling and cable-entry arrangements, wherever required; termination and point-to-point checking; configuration and testing of protection/BCPU, MFM/Trivector Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; breaker operation, bus-coupler interlocks, protection, metering and complete functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the panel, complete in all respects. Job 3.0 0.0 0.0 0.0 7.0 Dismantling of existing/old 11 kV Indoor Switchgear Feeder Panel and installation, erection, alignment, testing, commissioning and integration of the new 1250 A Feeder Panel, including safe isolation; disconnection and reconnection of busbars, power/control cables, CT/PT, protection, metering, trip/close, interlocking, alarm and communication circuits; shifting/stacking of dismantled panel; modification/extension of foundation, base frame, busbar transition/coupling and cable-entry arrangements, wherever required; termination and point-to-point checking; configuration and testing of protection/BCPU, MFM/Trivector Meter, IEC 61850/IEC 60870-5-104 communication and RTU interfaces; breaker operation, protection, metering and complete functional testing, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory replacement, installation, integration, testing and successful commissioning of the panel, complete in all respects. Job 90.0 0.0 0.0 0.0 8.0 Replacement/retrofitting of existing protection relay with new Numerical Bay Control & Protection Unit (BCPU) for 33/11 kV Power Transformer HV side, including safe isolation, removal of existing relay, mounting/cut-out modification, wiring alteration, termination and ferruling; configuration of protection, control, measurement, event/fault recording, IEC 61850/IEC 60870-5-104 communication and RTU/SCADA interfaces; uploading of approved settings; testing of CT/PT circuits, trip/lockout/control logic, alarms, indications, interlocks, communication, time synchronization and end-to-end operation, including secondary injection and all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory retrofitting, integration, testing and successful commissioning of the BCPU, complete in all respects. Job 10.0 0.0 0.0 0.0 9.0 Replacement/retrofitting of existing protection relay with new Numerical Bay Control & Protection Unit (BCPU) for 33/11 kV Power Transformer LV side, including safe isolation, removal of existing relay, mounting/cut-out modification, wiring alteration, termination and ferruling; configuration of protection, control, measurement, event/fault recording, IEC 61850/IEC 60870-5-104 communication and RTU/SCADA interfaces; uploading of approved settings; testing of CT/PT circuits, trip/control logic, alarms, indications, interlocks, communication, time synchronization and end-to-end operation, including secondary injection and all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory retrofitting, integration, testing and successful commissioning of the BCPU, complete in all respects. Job 4.0 0.0 0.0 0.0 10.0 Replacement/retrofitting of existing protection relay with new Numerical Bay Control & Protection Unit (BCPU) for 11/0.415 kV Station Transformer, including safe isolation, removal of existing relay, mounting/cut-out modification, wiring alteration, termination and ferruling; configuration of protection, control, monitoring, event/fault recording, IEC 61850/IEC 60870-5-104 communication and RTU/SCADA interfaces, as applicable; uploading of approved settings; testing of CT/PT/control circuits, trip logic, alarms, indications, communication and end-to-end operation, including secondary injection and all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory retrofitting, integration, testing and successful commissioning of the BCPU, complete in all respects. Job 2.0 0.0 0.0 0.0 11.0 Replacement/retrofitting of existing protection relay with new Numerical Bay Control & Protection Unit (BCPU) for 33 kV/11 kV Feeder Panel, including safe isolation, removal of existing relay, mounting/cut-out modification, wiring alteration, termination and ferruling; configuration of applicable directional/non-directional overcurrent, earth-fault, breaker-failure and other specified protection/control functions, event/fault recording, IEC 61850/IEC 60870-5-104 communication and RTU/SCADA interfaces; uploading of approved settings; testing of CT/PT circuits, trip/close/control logic, alarms, indications, interlocks, communication, time synchronization and end-to-end operation, including secondary injection and all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory retrofitting, integration, testing and successful commissioning of the BCPU, complete in all respects. Job 91.0 0.0 0.0 0.0 12.0 Replacement/retrofitting of existing protection relay with new Numerical Bay Control & Protection Unit (BCPU) for 33 kV/11 kV Bus-Coupler Panel, including safe isolation, removal of existing relay, mounting/cut-out modification, wiring alteration, termination and ferruling; configuration of applicable overcurrent, earth-fault, breaker-failure and other specified protection/control functions, event/fault recording, IEC 61850/IEC 60870-5-104 communication and RTU/SCADA interfaces; uploading of approved settings; testing of CT/PT circuits, trip/close/control logic, alarms, indications, interlocks, communication, time synchronization and end-to-end operation, including secondary injection and all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory retrofitting, integration, testing and successful commissioning of the BCPU, complete in all respects. Job 5.0 0.0 0.0 0.0 13.0 Dismantling/disconnection of existing Battery Bank and Battery Charger, wherever applicable, and installation, testing and commissioning of the new 30 V, 100 Ah Battery Bank with Float-cum-Boost Charger, including placement and fixing of battery rack/stand and cells; inter-cell/inter-tier connections; installation and connection of charger; laying/routing, dressing, termination and testing of battery, charger and DC cables; interfacing with the existing DC distribution system and providing DC supply to the associated RTU and other applicable substation automation/communication equipment; installation and testing of DC protection/isolation, earthing/bonding, alarms and indications; polarity, insulation, charger float/boost, AC-fail, battery backup/discharge and DC voltage-drop checks; shifting/stacking of dismantled equipment at the designated location, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the Battery Bank and Charger System, complete in all respects. Job 9.0 0.0 0.0 0.0 14.0 Installation, erection, configuration, testing, commissioning and integration of 11 kV, 630 A, 4-Way Ring Main Unit (RMU), including placement/mounting, foundation/base arrangement, earthing, 11 kV cable termination and associated power/control wiring; installation and commissioning of integral FRTU/controller, battery/charger, auxiliary supply and communication interfaces; configuration of protection, interlocks, LBS/VCB operation, FPI, local/remote control, IEC 60870-5-104 communication and point mapping; functional testing of all ways, earthing switches, alarms, measurements, control commands, communication and end-to-end operation with the respective Town SCADA Monitoring Station, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the RMU System, complete in all respects. Job 9.0 0.0 0.0 0.0 15.0 Installation, erection, configuration, testing, commissioning and integration of 11 kV, 630 A, 5-Way Ring Main Unit (RMU), including placement/mounting, foundation/base arrangement, earthing, 11 kV cable termination and associated power/control wiring; installation and commissioning of integral FRTU/controller, battery/charger, auxiliary supply and communication interfaces; configuration of protection, interlocks, LBS/VCB operation, FPI, local/remote control, IEC 60870-5-104 communication and point mapping; functional testing of all ways, earthing switches, alarms, measurements, control commands, communication and end-to-end operation with the respective Town SCADA Monitoring Station, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the RMU System, complete in all respects. Job 3.0 0.0 0.0 0.0 16.0 Installation, erection/mounting, configuration, testing, commissioning and integration of 11 kV Load Break Switch (LBS) with inbuilt FPI functionality and associated controller, including mounting structure/hardware, earthing, auxiliary/control power arrangement, control/communication wiring and termination; configuration of fault indication, local/remote operation, interlocks, alarms/status and IEC 60870-5-104 communication; interfacing through the separately provided 5G/4G Dual-SIM Cellular Modem and verification of complete monitoring/control and point mapping at the respective Town SCADA Monitoring Station; functional testing of switching, earthing/interlocking, fault indication, communication and remote operation, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the LBS System, complete in all respects. Job 401.0 0.0 0.0 0.0 17.0 Installation, erection/mounting, configuration, testing, commissioning and integration of 11 kV Sectionalizer complete with both-side CVTs, inbuilt CTs and associated controller, including mounting structure/hardware, earthing, auxiliary/control power arrangement, sensor/control/communication wiring and termination; configuration of protection/sectionalizing logic, fault-count and operating sequence, local/remote functions, alarms/status, measurements and IEC 60870-5-104 communication; interfacing through the separately provided 5G/4G Dual-SIM Cellular Modem and verification of complete monitoring/control and point mapping at the respective Town SCADA Monitoring Station; functional testing of sensing, sectionalizing operation, interlocks, communication and remote operation, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the Sectionalizer System, complete in all respects. Job 137.0 0.0 0.0 0.0 18.0 Installation, erection/mounting, configuration, testing, commissioning and integration of 11 kV Auto-Recloser System, including recloser/VCB, controller, auxiliary PT/power supply, battery/charger, lightning arresters, mounting structure/hardware, earthing, umbilical/control/communication wiring and termination; configuration of protection settings, reclosing sequence, dead/reclaim time, lockout, local/remote functions, alarms/status, measurements and IEC 60870-5-104 communication; interfacing through the separately provided 5G/4G Dual-SIM Cellular Modem and verification of monitoring/control and point mapping at the respective Town SCADA Monitoring Station; secondary injection and functional testing of trip/reclose/lockout, communication and remote operation, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the Auto-Recloser System, complete in all respects. Job 15.0 0.0 0.0 0.0 19.0 Installation, configuration, testing, commissioning and integration of Distribution Transformer Monitoring Unit (DTMU) for 400/630 kVA Distribution Transformer, including mounting of DTMU/controller, installation of LT CTs and applicable temperature/oil-level sensors, auxiliary/backup power and surge-protection arrangements, wiring, termination and communication interfacing; configuration of electrical, loading, power-quality, temperature, oil-level, alarm/event and data-logging parameters; IEC 60870-5-104 configuration and interfacing through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; verification of measurements, alarms, communication, data mapping and end-to-end monitoring, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the DTMU, complete in all respects. Job 521.0 0.0 0.0 0.0 20.0 Installation, configuration, testing, commissioning and integration of 11 kV Smart Fault Passage Indicator (FPI) System comprising 3 Nos. conductor-mounted FPIs and associated Controller/Data Concentrator Unit, including mounting of FPIs/controller, power-supply arrangement, short-range communication/interface setup, wiring and termination; configuration of phase/earth-fault thresholds, voltage presence/absence, transient/permanent fault indication, reset functions, alarms/status and IEC 60870-5-104 communication; interfacing through the separately provided 5G/4G Dual-SIM Cellular Modem to the respective Town SCADA Monitoring Station; verification of fault detection, local indication, communication, point mapping and end-to-end monitoring, including all skilled manpower, hot-stick/installation tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the Smart FPI System, complete in all respects. Job 49.0 0.0 0.0 0.0 21.0 Installation, configuration, testing, commissioning and integration of Industrial-Grade 5G/4G Dual-SIM Cellular Modem, including mounting, external antenna installation, power-supply and surge-protection connection, Ethernet/serial communication cabling and termination; insertion/configuration of SIM cards and static-IP/network parameters when made available by HPSEBL/TSP; configuration of APN, routing, failover and applicable communication/security parameters; interfacing between the associated field SCADA Enabler/controller and the respective Town SCADA Monitoring Station; verification of signal/network availability, dual-SIM/network failover, IP connectivity, IEC 60870-5-104 data/control communication and end-to-end operation, excluding procurement/subscription of SIM cards and telecom/static-IP services, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the Modem, complete in all respects. Job 1135.0 0.0 0.0 0.0 22.0 Installation, erection, configuration, testing, commissioning and integration of Remote Terminal Unit (RTU) System for the respective substation, including RTU panel/rack mounting; installation and interconnection of redundant CPU, redundant power supply, I/O modules, Layer-II industrial Ethernet switch and communication interfaces; laying/routing, dressing, termination and testing of complete control, CT/PT where applicable, auxiliary power, LAN/Ethernet, serial and communication cabling corresponding to the approved station-wise/bay-wise I/O; interfacing with field contacts/equipment, CMRs, HDRs, MFMs and other IEDs; database configuration, IEC 60870-5-101/104, IEC 61850 and Modbus configuration as applicable; point/address mapping, SOE/time synchronization, redundancy and cybersecurity configuration; point-to-point testing of all DI/AI/DO and communicated values; end-to-end testing towards the respective Town SCADA Monitoring Station for local monitoring and independently towards MCC/BCC through the SDH/designated communication interface, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the RTU System, complete in all respects. Job 23.0 0.0 0.0 0.0 23.0 Installation, testing, commissioning and integration of Contact Multiplying Relays (CMRs), including mounting, wiring, ferruling and termination; interfacing with breaker, isolator, protection relay and other applicable field contacts and the respective RTU digital-input interfaces; verification of coil operation, contact multiplication, isolation, alarms/status and point-to-point indication at the RTU/Town SCADA, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the CMRs, complete in all respects. Job 2012.0 0.0 0.0 0.0 24.0 Installation, testing, commissioning and integration of Heavy Duty Relays (HDRs), including mounting, wiring, ferruling and termination; interfacing between the RTU digital-output interfaces and the respective circuit breaker, isolator or other applicable switching-equipment control circuits; verification of relay operation, contact rating/logic, trip/close/control circuit operation, auxiliary feedback and point-to-point remote command operation through the RTU/Town SCADA, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the HDRs, complete in all respects. Job 1280.0 0.0 0.0 0.0 25.0 Installation, configuration, testing, commissioning and integration of Communicable Multifunction Meter (MFM) with associated CTs, including mounting, CT installation/interfacing, voltage/current and auxiliary-supply wiring, communication cabling and termination; configuration of measurement, energy, demand, power-quality and communication parameters; Modbus RTU/TCP and/or other applicable standard protocol configuration; interfacing and mapping with the RTU System; verification of accuracy/phase sequence, electrical and energy parameters, communication data, point mapping and end-to-end data availability at the RTU/Town SCADA, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the MFM, complete in all respects. Job 339.0 0.0 0.0 0.0 26.0 Installation, configuration, testing, commissioning and integration of the complete SCADA Monitoring Station for the respective Town, including installation/mounting of SCADA Server, Operator Workstation with display, NGFW, industrial Ethernet switch(es), network printer, Online UPS, rack/mounting and associated equipment; laying/routing, dressing, termination and testing of power, LAN/Ethernet, fibre/copper and communication cabling; installation, activation and configuration of SCADA application, database/historian, alarm/event/SOE, trending, reporting, power-quality and engineering software/licences; configuration of NGFW, network segmentation, users/RBAC, audit logging and other specified cybersecurity features; configuration and testing of IEC 60870-5-104 and other applicable protocol interfaces for acquisition, concentration, processing and monitoring of data from SCADA Enablers and new/existing RTUs of the respective Town; creation/configuration of database, tags, addresses, graphics/SLDs, alarms, events, trends and reports; time synchronization, point mapping and end-to-end communication testing; verification that Town-level control functionality remains disabled while requisite data/control points are made available at the designated interface for subsequent MCC/BCC integration; complete documentation and handover of configuration/database/interface details, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the SCADA Monitoring Station, complete in all respects. Job 13.0 0.0 0.0 0.0 27.0 Installation, testing and commissioning of SDH Communication System (STM-4 extendable up to STM-16, MADM supporting up to 3 MSP-protected directions), including installation/mounting of SDH base equipment, sub-racks, DDF, SDH & Digital Protection Coupler Cabinet and associated equipment; installation of common, cross-connect/control, optical interface/base, power-supply, tributary and Ethernet cards/modules; power and communication cabling, fibre patching and termination; system/database configuration, synchronization and provisioning of required communication paths/circuits; integration with the existing SDH/communication network and RTU/MCC/BCC interfaces; end-to-end testing of optical/tributary/Ethernet links and protection channels, alarms, performance, redundancy and MSP protection switching, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, integration, testing and successful commissioning of the SDH Communication System, complete in all respects. Job 21.0 0.0 0.0 0.0 28.0 Configuration, functional testing, demonstration and operationalization of Portable Diagnostic PC-based RTU Configuration, Protocol Simulation, Monitoring and Testing Kit under the concerned Chief Engineer (OP) Zonal Offices, including installation/activation and verification of RTU Database Configuration & Maintenance Software, Master Station-cum-RTU Simulator, Protocol Analyser and IEC 61850 diagnostic/engineering tools; configuration and verification of IEC 60870-5-104, IEC 60870-5-101, IEC 61850 and Modbus functions, as applicable; testing of supplied Ethernet/serial interfacing hardware; demonstration of RTU database backup/edit/compile/download, master/RTU simulation, protocol capture/analysis, communication diagnostics, IEC 61850 SCL/MMS/GOOSE functions as applicable, and testing with representative RTU, SCADA and protection interfaces; complete licence/backup documentation and hands-on training of HPSEBL personnel in configuration, simulation, monitoring, diagnostics, fault analysis and routine use, including all skilled manpower and other services, whether specifically mentioned herein or otherwise required for complete configuration, testing, demonstration, training and successful operationalization of the Diagnostic Kit, complete in all respects. Job 3.0 0.0 0.0 0.0 29.0 Installation, laying/stringing, jointing, splicing, termination, testing and commissioning of the complete 24 Fibre ADSS Optical Fibre Cable System, including 24 Fibre ADSS cable, optical fibre approach cable, straight-through/mid-span/branch joint closures as applicable, 24 Fibre and 96 Fibre FODPs, suspension/tension hardware, clamps, protection/identification accessories, patch cords, pigtails, connectors/adaptors and all associated passive components; route preparation and installation on the approved line/structure, service-loop arrangement, approach-cable laying, fibre splicing and termination, FODP installation, interfacing with existing FODP/SDH Communication System; bi-directional OTDR testing at 1310/1550 nm, insertion-loss/optical-power measurement, fibre-core identification, testing of all working and spare fibres, link-budget verification and end-to-end communication testing up to the existing SDH system; preparation of splice charts, OTDR traces and as-built route/core documentation, including all skilled manpower, tools, tackles, splicing/testing instruments and other services, whether specifically mentioned herein or otherwise required for complete and satisfactory installation, testing and successful commissioning of the fibre optic communication links, complete in all respects. KM 157.95 0.0 0.0 0.0 30.0 Installation, configuration, integration, testing, commissioning and operationalization of the complete Training Centre Setup at MCC Hamirpur, comprising full-scale functional 11 kV RMU, Auto Recloser, LBS, FPI, RTU and Local SCADA Control & Monitoring System, including placement, erection/mounting and safe interconnection of all equipment; installation of training/simulation I/O interface arrangement, test/patch facilities, auxiliary AC/DC/UPS supplies, earthing, networking, benches/consoles and associated equipment; laying/routing, dressing and termination of power, control and communication cabling; configuration and integration of RTU, Local SCADA, IEC 60870-5-104, IEC 61850 and other applicable interfaces; configuration and functional verification of protection, control, monitoring, status, measurement, alarm/event/SOE, fault indication, reclosing, sectionalizing, feeder-transfer/network-reconfiguration and communication functions; simulation and demonstration of normal, fault, communication-failure and restoration scenarios without affecting the live distribution network; complete FAT/SAT/site functional demonstration, documentation, baseline/Golden Configuration and comprehensive hands-on training of HPSEBL personnel covering equipment operation, RTU/SCADA configuration, protocol communication, simulation, diagnostic/testing tools, fault analysis, cybersecurity awareness and routine troubleshooting, including all skilled manpower, tools, tackles, testing and commissioning equipment and other services, whether specifically mentioned herein or otherwise required for complete integration, demonstration, training and successful operationalization of the Training Centre Setup, complete in all respects. Job 1.0 0.0 0.0 0.0 Total Project Cost (in ₹) 0.0

AI Tender Summary

OUR REF NO 57290629
AUTHORITY Government Departments
TENDER VALUE 75 Crore
LAST DATE 21-09-2026
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender For System Automation Works Under World Bank
Basic Detail
Tender No HPSEBL/CE (MM)-11/WB 24x7/Pkg 4 (Part-I)/2026.
Bidding Type Tender
Location
City Shimla
State Himachal Pradesh
Key Dates
Publish Date 01 Sep 2026
Submission Date 21 Sep 2026
Open Date 23 Sep 2026
Finance
Tender Value 75 Crore
Tender Fee 1475
EMD 1.50 Crore
Exemption Available
Document List
BOQAnnexureI.xls
BOQ_211659.xls
d510fed3-54fa-45b1-b102-f2d0d0f6eeb2.html
eRA.pdf
FinalDrawings.pdf
SBD.pdf
Tendernotice_1 (14).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Sep 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
xls

BOQAnnexureI.xls

xls

BOQ_211659.xls

html

d510fed3-54fa-45b1-b102-f2d0d0f6eeb2.html

pdf

eRA.pdf

pdf

FinalDrawings.pdf

pdf

SBD.pdf

pdf

Tendernotice_1 (14).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders